A request for quote for whole-house custom cabinetry is only as good as the information behind it. For a mid-century style project that mixes warm wood grain, built-in storage and fitted pieces in several rooms at once, a thin enquiry forces the factory to guess — and guesses turn into change orders, re-measurement and price movement after production has started.
Below is what a serious buyer should put in front of the manufacturer before asking for a number, and why each item changes the quotation you get back. We produce mid-century whole house custom cabinetry and built-in storage for villas, apartments and hotel fit-outs, so we can tell you quickly what an enquiry of this type is still missing.
1. Room list and the exact scope of each fitted item
Send a room-by-room list rather than a single phrase such as "full house joinery". For every run, state whether you want it floor-to-ceiling or floating, open or closed, and what it has to hold. A mid-century scheme usually covers several different pieces that behave very differently in production:
- Kitchen cabinetry with worktop, appliance housings and internal drawers.
- Bedroom built-in wardrobes, including custom minimalist bedroom wardrobes with handleless fronts when a seamless wall face is wanted.
- Built-in window-seat desks with drawer banks under the sill, sized to the reveal.
- Open staircase shelving and vertical slat partitions that must stay daylight-friendly.
- Entry storage, sideboards and display niches, often with stone or travertine accents.
A useful habit is to write each item as "location — function — finish", for example "north bedroom wall — full-height hidden wardrobe — warm oak grain, push-open fronts". Two buyers using the word "wardrobe" can mean a small freestanding unit or a full built-in run across one wall, and that difference is most of the price.
2. Drawings, dimensions and how they were measured
Attach whatever you already have: floor plans, elevations, a marked-up PDF, or even photographs with measurements written on them. State which of the following applies, because it tells us what we still need to do:
- Architect or designer drawings with cabinet elevations and callouts.
- A floor plan with overall room dimensions only — we then propose layouts for your approval.
- Existing site measurements taken by you, which we will check against our own on-site survey before production.
For fitted work, final dimensions are measured on site. In our mid-century modern whole house custom furniture project, cabinet dimensions were taken on site so the units met the appliances and wall lines exactly. Quote requests that say "as per drawing, to be verified on site" are honest; quote requests with no measurement note at all usually end in a second revision.
3. Materials, finishes and hardware — named, not implied
Mid-century interiors depend on grain, tone and edge detail, so be specific. Tell us:
- Board and core material you want quoted, or the performance requirement you need met.
- Surface finish: wood-grain laminate, veneer, lacquer in a matte or high-gloss sheen, acrylic — and the colour reference or sample code if you have one.
- Handle detail: handleless / push-open fronts, integrated profiles, or visible pulls.
- Hardware expectations for hinges, drawer runners, support legs and brackets. For custom built-in kitchen cabinets supplied to hotels and apartments we quote matching hardware as part of the package, so say whether you want it included or supplied locally.
- Any stone, travertine or marble elements that sit with the joinery, and whether we fabricate them or coordinate with your stone supplier.
If you are unsure, say so and give a reference image instead. A named reference is worth more than an adjective such as "high quality".
4. Quantities, project type and delivery destination
State the number of units or rooms per type, the building type (private villa, apartment block, hotel guest room, office), and the delivery address with the port or site where goods should land. A single villa quoted against one drawing and a multi-apartment scheme drawn from the same detail are different jobs: batch size drives panel nesting, finishing line setup, packing method and freight. Our custom furniture manufacturing work runs on flexible minimum order quantities, so a small project is not automatically rejected — but we need the quantity to price it correctly.
5. Programme dates and site conditions
Give three dates: when you want the quotation, when drawings must be signed off, and when goods must arrive on site. Also mention site readiness — floor levels, plaster completion, first-fix electrical positions for integrated lighting in niches and shelves. Built-in joinery is the trade everyone else waits for, so a realistic programme protects your own schedule as much as ours.
6. Services you want quoted, not assumed
Write out which stages you want priced. Our one-stop furniture and building materials service covers site survey, 3D design, production, freight and on-site installation, but a quotation is only complete when the scope line matches what you actually need. Typical options to state explicitly:
| Stage | What to confirm in your RFQ |
|---|---|
| Design | Do you have a designer, or do you need layout proposals and 3D renderings from us? |
| Prototyping / sampling | Do you want a door sample, finish board or a full mock-up before the main run? |
| Production | Batch size, inspection standard, packaging method (flat pack or assembled). |
| Freight | Delivery address, Incoterms you want quoted, sea / air / rail preference. |
| Installation | On-site installation by our team, guidance to your local trades, or supply only. |
| After-sales | Spare parts, replacement panels and the warranty terms you want in writing. |
7. Budget range and decision criteria
A budget band lets the manufacturer engineer toward it instead of quoting one option and being asked to cut it later. Say what decides the award: lowest price, fastest programme, or a finish you will not compromise on. Buyers who hide the budget usually go through several rounds of quotations; buyers who state a range usually get one that is close.
8. Decision-maker, drawings ownership and next steps
Name the person who signs off drawings and receives delivery, and say whether you hold rights to the design or are working from a designer's package. For OEM and private-label buyers, add branding requirements — engraving, embossing, logos, packaging — and your labelling standard, since these affect both tooling and packing time.
A short RFQ template you can copy
- Project name, building type, location and delivery address.
- Room-by-room list of fitted items with function and finish for each.
- Drawings or photographs on file, plus a note on how dimensions were obtained.
- Materials, finishes, handle style and hardware to be included.
- Quantities per item type.
- Quotation date, drawing sign-off date, required delivery date.
- Stages to price: design, sampling, production, freight, installation, after-sales.
- Budget band and award criteria.
- Contact person, email and phone / WhatsApp.
Send us that list and we will come back with a costed scope, not a single unexplained figure. If you are sourcing joinery for a villa or a hospitality fit-out, see our turnkey interior project solutions or contact PHILLIP on +86-13928214007, email santerson@qq.com.
Scope, materials and pricing for each project are confirmed in writing after the on-site survey and drawing sign-off. Figures quoted for one project do not carry over to another.