A floating vanity looks simple on a drawing: a box fixed to a wall, a basin on top, a mirror above it. That simplicity is exactly why it causes rework. The unit carries no floor support, so the wall behind it, the waste pipe inside the wall and the countertop sitting on it all have to agree before production starts. This guide lists what a procurement team should record for each Santerson Floating Vanity unit in a project, so that shop drawings, purchase orders and site instructions all refer to the same item.
1. Unit schedule: one row per bathroom
Never specify a floating vanity by name alone. In a villa or hotel job the same model usually appears in three or four bathrooms at different widths. Issue a unit schedule with one line per location, and give every line a unique tag that you will also see stamped on the carton.
- Room or room type reference, for example guest WC, master ensuite, staff bathroom
- Unit tag used on drawings, in the purchase order and on packaging labels
- Total quantity of identical units under that tag
- Finished width, height and projection, plus the dimension from finished floor to the underside of the carcass
- Which side the basin cut-out and tap holes fall on when facing the unit
Santerson's floating vanities are listed as configurable for residential bathroom projects, with made-to-measure sizing, material and finish choices, and a layout tailored to the project. That flexibility is useful, but only if the schedule states what each variant actually is.
2. Wall substrate and fixing method
A wall-hung unit transfers its weight, plus the load of someone leaning on it, into the wall. Record what that wall is made of and how the bracket will be fixed to it, because this decides whether the wall needs work before the vanity arrives.
- Wall build-up: stud partition, framed cavity with a steel carrier, or solid masonry
- Position and depth of noggings or a carrier frame, shown on setting-out drawings
- Bracket type and the fixings specified for that substrate
- Whether the wall finish is tiled, panelled or painted, and where the finished face line sits
- Any services in the wall that must be moved before fixing points are drilled
The finished-face dimension matters more than it seems. Tiles, waterproofing and render change the wall face by several millimetres, and a vanity set out against the bare wall can end up standing off the basin waste or the mirror.
3. Basin, countertop and tapware interface
The carcass is only part of the assembly. Document what sits on it and how the two are joined, because countertop lead times often run longer than cabinet lead times.
- Basin type: undermount, integrated or above-counter vessel
- Countertop material, thickness and edge detail, with a templating date if stone is involved
- Tap hole count and positions, and whether the taps are deck-mounted or wall-mounted
- Overflow provision in the basin, if the specification calls for one
- Sealing method between countertop and wall, matched to the wall finish
Where a project wants the worktop and basin formed as one piece, that is a different product line from a standard floating carcass, so raise it at enquiry stage rather than during production. Santerson's Santerson Integrated Countertop Vanity covers that integrated arrangement, while the Single Vanity range is used for narrower bathrooms.
4. Waste, trap and rough-in dimensions
This is the item most often left blank until the unit is on site. For a wall-hung layout, record the waste before the wall is closed up.
- Waste outlet position: centre or offset from the unit tag line, measured from finished floor and finished wall face
- Trap type and direction of the outlet
- Rough-in dimension for any wall-hung WC paired with the vanity in the same bathroom
- Trap type and outlet direction for that WC, taken from its technical sheet rather than assumed to be standard
- Whether the bottle trap is concealed in the carcass or exposed below it
If the layout includes a wall-hung WC next to the vanity, its rough-in has to be set out at the same time as the vanity brackets. Catalogue pages for models such as Wall Hung Toilet 1038W state the trap type and rough-in on the product page, so ask for that figure in writing at enquiry stage and confirm it against the technical sheet for your order before first fix.
5. Material, finish and edge banding
Write down the finish in a form a factory can act on, not an adjective. "Grey matte" is not an order; a board type, a colour reference and a surface texture are.
- Carcass board material and its grade
- Door and drawer-front material: lacquer, acrylic, melamine, veneer or laminate
- Colour or grain reference supplied by the factory's own range card
- Sheen level, for example matte, satin or high gloss
- Edge banding colour and thickness on visible edges
- Which faces are exposed on an open-ended run, so the correct edge is banded
Bathrooms cycle between humid and dry conditions several times a day. Where a project needs boards and hardware chosen for that environment, say so in the enquiry and ask which options the factory offers for bathroom use.
6. Hardware, drawers and soft close
- Hinge type and whether soft close is required on doors and drawers
- Drawer configuration per unit: number of drawers, one deep pull-out or a mix
- Handle style, integrated handle or push-to-open, and its finish
- Whether hardware is pre-fitted at the factory or supplied loose for site fitting
- Spare hardware allowance carried in the container for future maintenance
Loose hardware saves freight volume but shifts assembly to your site team. Record which arrangement applies per unit tag, so the fitter on site is not opening a carton and guessing.
7. Lighting and mirror coordination
A floating vanity is usually specified with a mirror and a light above it, and the electrical first fix has to know where all three sit.
- Mirror size, frame or frameless, and its centre line relative to the unit tag
- Vanity light type and its mounting height above the finished mirror
- Switch location and the circuit the light sits on
- Any integrated lighting in the carcass and where it is fed from
Santerson lists Vanity Lighting as part of its lighting and accessories range, also configurable by finish and size. If the light and the cabinet come from the same order, request matching finish references so the metalwork and the carcass do not clash under warm bathroom lighting.
8. Packaging, delivery sequence and storage on site
- Packaging specification for countertop and mirror items, which are the breakage risks
- Carton labelling that repeats the unit tag, not just the product name
- Delivery sequence matched to the fit-out order of bathrooms
- Dry, level storage on site, with vanities stored upright and off the floor
- Inspection routine on arrival: check carcass squareness and door alignment before signing
Bathrooms are typically handed over late in a project, so it is common for all units to arrive at once and sit in storage. A labelled, sequenced delivery list keeps them out of the wrong apartment.
9. Approval samples and sign-off records
- Signed sample board for the chosen door finish, held on site as the reference
- Approved shop drawing per unit tag, dated and initialled by the designer or client
- Written confirmation of any change to size, basin position or hardware after approval
- As-built record where a bathroom deviated from the issued drawing
Make changes expensive on purpose. Every amendment after shop-drawing approval should be reissued in writing with a revised unit schedule attached, so the factory, the plumber and the fitter all receive the same revision number.
Documentation checklist at a glance
| Record | Who confirms it | When |
|---|---|---|
| Unit schedule with tags and dimensions | Procurement with designer | Tender / enquiry |
| Wall substrate and bracket fixing method | Main contractor | Before wall closure |
| Countertop template and basin position | Stone supplier and cabinet maker | After first fix |
| Waste, trap and WC rough-in dimensions | Mechanical contractor | Before wall closure |
| Finish reference and edge banding | Client or designer signs sample | Before production |
| Hardware list and pre-fit status | Cabinet maker and site team | Before production |
| Mirror and lighting setting-out | Electrical contractor | Before first fix |
| Packaging, labelling and delivery sequence | Supplier and site logistics | Before shipment |
| As-built record of deviations | Site supervisor | At handover |
Send us your unit schedule. Santerson manufactures floating vanities to project dimensions with selectable materials and finishes, and coordinates them with basins, wall-hung WCs, mirrors and vanity lighting in the same order. Share your room list, target sizes and finish references and we will return a specification to review before production begins.