A mirror cabinet looks simple on a drawing until it arrives on site: the door hits the basin tap, the frame does not line up with the finished wall, or the electrics are not where the light expects them to be. The Santerson Tall Mirror Cabinet is a made-to-measure piece, which means the quality of your specification decides how well it fits. This guide sets out exactly what to write down before an order is placed, so the cabinet you approve in the drawing is the cabinet that reaches the wall.

Why a Tall Mirror Cabinet Needs Its Own Specification

Unlike a stock unit picked from a catalogue, this tall mirror cabinet is produced to project-specific dimensions, finish and layout. That flexibility is the point of it: floor-to-ceiling storage in a narrow guest bathroom, a full-height mirrored front that opens onto a shallow recess, or a unit matched to the same veneer as the vanity below. The trade-off is that nothing can be corrected after production starts. A specification written once, clearly, and signed off by everyone who touches the wall - designer, tiler, electrician, plumber - saves the rework that a vague email chain always produces.

Section 1: Location, Wall and Clearances

Start with the wall, not the cabinet. Record the room it serves (main bathroom, ensuite, guest powder room, shared villa bathroom), because that determines traffic, humidity exposure and how much storage is realistic.

  • The finished wall line, after tiling, waterproofing or paneling - not the structural wall. Give the projection available from the finished face.
  • Floor-to-ceiling height at the exact installation point, measured at two places, since slabs and ceilings are rarely level.
  • Clearances on both sides: door swing, towel rail, shower screen, vanity drawer pull-out, and any recess the frame has to sit inside.
  • Wall construction and fixing method - stud, brick, block or backed plasterboard - so the correct anchors and a suitable substrate are confirmed before shipping.

Section 2: Dimensions to Specify, Not Assume

Made-to-measure means you give the numbers. Write them as a small table in the enquiry rather than as a sentence, and state whether each figure is the cabinet size or the opening size.

DimensionWhat to state
Overall heightTotal height required at the finished floor to the finished ceiling or to a stated soffit.
Overall widthWidth of the intended position, plus whether the unit should fill it or leave a shadow gap.
DepthAvailable projection from the finished wall, and the maximum depth you will accept at the mirror face.
Internal divisionsNumber of shelves, shelf heights, whether any shelf is fixed or adjustable, and what has to stand inside (tall bottles, folded linen, hairdryers).
Door layoutNumber of doors, hinge side for each, mirrored on the outside, inside, or both.

Section 3: Finish and Material Matching

The cabinet is offered with material and finish options, so state which existing element it must match. Name the reference explicitly - a board code, a sample number, or a physical sample sent to the factory - rather than a colour word such as "grey" or "oak", which means something different to every supplier.

  • Body and door material, with the matching element identified (vanity, tall cabinet, wall paneling).
  • Surface treatment: matte, high-gloss, lacquer, veneer or melamine, and the sheen you expect under bathroom lighting.
  • Mirror type on the front and any interior mirrored panel, including edge finish.
  • Hardware: handle or handleless, hinge type, soft-close requirement, and the metal tone of any pulls.

Section 4: Lighting and Electrical

If your project calls for an illuminated front instead of a plain mirrored door, the matching option in this range is the Santerson LED Mirror Cabinet. Specify lighting early, because it changes where the cable must be. Record:

  • Whether the unit is lit or unlit, and if lit, which side or edge the light source sits on.
  • Switch position - cord, wall plate, or touch - and the height of that switch from the finished floor.
  • Supply details for the destination market and the location of the connection point relative to the cabinet outline.
Confirm lighting and electrical specifications with your electrician for each project before the drawing is released. Voltage, driver location and cable position are project decisions, not catalogue defaults.

Section 5: Coordination with Basin, Vanity and Tapware

The most common site failure is a mirror door that cannot open past the tap or the basin splashback. Put the vanity and tapware on the same sheet as the cabinet. Note the basin type - single vanity, double vanity, or an integrated basin - the tap reach from the wall, and the countertop height. Then check the door swing on paper at 90 degrees against those dimensions. If the clearance is tight, change the hinge side or reduce the cabinet width now, not after installation.

Section 6: Quantities, Packaging and Site Handling

List quantities per room or per floor, and label each line with the same room code used on the architectural drawings. For multi-unit orders, confirm that each unit is individually packed and marked with its room reference, so nothing is installed in the wrong bathroom. Ask for the fixing detail to travel with the goods; a made-to-measure unit installed without its intended anchor method is a warranty problem waiting to happen.

A Specification Checklist to Send With Your Enquiry

  • Room and wall position, with finished-line dimensions taken on site.
  • Height, width, depth as cabinet size or opening size, plus internal division layout.
  • Named material and finish reference, matched to a stated element.
  • Mirror type, door count, hinge sides, hardware tone and soft-close requirement.
  • Lighting decision, switch position and supply details for the destination market.
  • Vanity, basin and tapware dimensions checked against the door swing.
  • Quantities with room codes, packing marks and fixing detail requested.

Turning the Specification Into a Manufactured Unit

SANTERSON works as a one-stop supplier for furniture and building materials on villa, hotel and office projects, with custom and OEM service covering bespoke sizes, finishes and detailing. Send the checklist above through the contact page, and expect the enquiry to come back as a production drawing for your sign-off - the point at which every number in this article is either confirmed or corrected at no cost.

Working on several bathrooms at once? Send the room schedule with your enquiry so each cabinet is specified against its own wall, and keep one approved drawing per unit in the project file before production begins.