A wardrobe line item that reads "two tone veneer, as per design" survives about as long as it takes the first shop drawing to come back. What a procurement team actually needs is a written specification: which substrate, which veneer species and cut, where each tone stops and starts, how the doors open, what goes inside, and who signs off the sample before production starts. This guide sets out the fields to fill in for Two Tone Veneer Wardrobes, and shows how each decision changes what you are quoted, what arrives on site and how the handover runs.

Why a two tone veneer brief needs more precision than a single finish

A single-finish wardrobe can be described in one line, because there is only one surface decision to make. A two tone design carries at least four: the species and cut of each veneer, the boundary between the two tones on every elevation, the frame or reveal that sits between them, and the sheen applied to each. Every unresolved decision becomes a query during shop-drawing review, and every query adds a day to the approval cycle.

The second reason is comparability. When tone A appears on one wardrobe in a villa's master suite and tone B repeats across three guest rooms, the buyer needs one specification covering all of them, or the quotations will not line up item by item. Write the brief once, apply it to every unit, and price the set as a set.

1. Scope, quantities and room schedule

Start with the unglamorous part, because this is where quotations diverge. List each wardrobe by room or unit number with an opening width, height and depth, and state whether the dimension is a finished face measurement or a structural opening. Note ceiling level, skirting, architraves, services, and any recess the carcass has to sit inside.

  • Unit reference, room, quantity, overall width / height / depth
  • Floor build-up — how much height carpet or tile takes up under a floor-standing unit
  • Wall condition — whether the carcass must scribe to an out-of-plumb line or fit a framed recess
  • Whether the wardrobe sits inside a built-in furniture package alongside vanities, doors and wall panelling, so one supplier takes the adjacent joinery too
State measurement responsibility explicitly: who takes the site dimensions, when they are taken, and what happens if a floor level or wall line is corrected after the carcass drawings are approved.

2. Substrate, veneer species and sheen

Veneer is only as good as the board under it. Specify the substrate by grade and thickness, and specify how edges are handled — solid wood lipping, veneer-wrapped edge or a matching edge band — because two tone doors with visible edges show every mismatch between door face and edge detail.

FieldWhat to write in the brief
Veneer species and cutName each tone separately — a walnut-range tone paired with a lighter oak-range tone, for example — and state the cut: crown, rift or quarter. The cut decides whether grain reads as book-matched figure or straight lines.
Grain directionVertical or horizontal on doors. State it per elevation, not once for the whole order.
Sequencing ruleWhether adjacent doors must come from the same flitch, and whether grain has to align across a door pair.
Tone boundaryWhere the second tone starts on each elevation: an inset panel, an end return, a drawer-front band, or a full-height vertical bay.
SheenMatte or gloss per tone. A gloss door beside a matte door under site lighting reads as a colour difference even when the wood is identical.
Substrate and edgeBoard grade, thickness, lipping material and edge treatment, stated per component.

Our two tone veneer wardrobe is made to measure, with finish, layout and dimensions set per project rather than picked from a fixed size table. Where a project mixes tones across rooms, name the sibling finishes in the same wood veneer family in your brief — Walnut Veneer Wardrobes, Natural Oak Veneer Wardrobes and Smoked Veneer Wardrobes — so one veneer source and one sheen schedule apply across the whole set.

3. Door type, clearance and hardware

Door choice is a clearance decision before it is an aesthetic one. Sliding doors need run depth and a track detail; hinged doors need swing clearance in front of the bed or vanity; folding doors need both. Write down the clearance you have, then let the door type follow from it.

  • Hinged: confirm swing direction per door, and check handle projection against the walkway.
  • Sliding: state panel count, overlap, track type, and whether the track is exposed or recessed. The Two Tone Sliding Door Wardrobes configuration covers this combination.
  • Corner and L-shaped rooms: state which leg is accessed first. A corner unit loses usable depth if the return door swings the wrong way — see L Shaped Corner Wardrobes.
  • Dressing rooms: for perimeter runs with an island, L Shaped Walk in Wardrobes is the layout to price.
  • Hardware: hinges and slides by brand or load rating, handle style or an integrated handleless profile, plus door stop and soft-close requirements.

4. Interior configuration and lighting

The inside of the wardrobe is where occupants judge quality, and it is also the cheapest thing to change late. Specify hanging lengths — long, short or double hang — shelf spans with their load, drawer count and runner type, plus provisions for shoes, trays and accessories. If the design calls for open display bays for bags or folded items, say so; alternating closed doors with open wardrobe bays is one of the simplest ways to make a two tone scheme look designed rather than assembled from a catalogue.

  • Hanging rails: number, length and height of each rail
  • Shelves: span, thickness, edge detail, adjustable or fixed
  • Drawers: count, soft-close runners, front height, interior finish
  • Interior panel finish: colour or veneer on the inside face, and whether it repeats the exterior tone
  • Lighting: door-triggered, motion-triggered or constant; where drivers sit and how wiring is accessed for service

5. Sampling, shop drawings and written approval

For a two tone veneer order, require two documents before production: a physical sample board showing both tones, the sheen and the edge detail together; and a dimensioned shop drawing per unit with the tone boundaries marked on every elevation. Approval should be in writing, against those two items, dated.

  • Submit the brief: dimensions, finishes, door type, interior layout, quantities, delivery address
  • Check that every line on the quotation and detail sheet repeats the same finish schedule
  • Approve the sample board and shop drawings in writing
  • Release to production only once both approvals are on file

That sequence mirrors how custom work runs here: project brief and design proposal, then quotation and detail confirmation, then production, shipment and follow-up. Where a tone sits outside the standard range, our custom and OEM service covers bespoke finishes and textures alongside design and prototyping, so the colour can be developed rather than approximated on site.

6. Packing, delivery and site readiness

Veneered doors are the component that gets damaged, so specify how they travel. Ask for the packing method per component, whether doors ship loose or hung on the carcass, and how each unit is labelled against your room schedule rather than the factory's internal job numbers.

  • Packing standard per component, with corner protection on veneered edges
  • Labelling matched to the room schedule
  • Delivery term, and who handles customs clearance and last-mile delivery — our logistics and door-to-door delivery service covers freight forwarding, documentation and container loading planning
  • Loading sequence: if the wardrobes travel with matching wood veneer panels, doors or wall panelling, the joinery should come off the container last
  • Site conditions before delivery: building closed in, wet trades finished and dry, secure storage on site
  • Installation responsibility and the snag list at handover — see installation and after-sales support

7. Commercial terms worth fixing in the brief

TermPut it in writing
Order minimumsMinimum quantity per finish, and whether wardrobes across different rooms count toward one order.
Pricing basisWhether the price is per linear metre, per unit or per project package, and what is excluded.
Change controlThe last date on which a dimension or finish can change without re-pricing.
Inspection pointWhether you inspect before shipment, and what evidence you require — photographs of the approved sample against production units.
Spare partsWhether replacement doors, panels and hardware can be reordered later to the same finish schedule.

For villa and hospitality projects where wardrobes are only one line among cabinetry, doors, panelling and flooring, consolidating those items with one supplier removes a whole category of coordination risk. That is the basis of our turnkey project solutions — design consultation and space planning, material selection and product specification, manufacturing and quality control, then site coordination and handover.

Send us the room schedule, target dimensions and the two tones you are working to, and we will return a quotation with detail sheets and shop drawings for approval. Contact PHILLIP on +86-13928214007 or through the enquiry page to start the specification.