A request for quote for built-in wardrobes rarely fails because the buyer forgot to ask the price. It fails because the price that comes back cannot be compared. Three suppliers quote three different sets of assumptions, and the cheapest one turns out to exclude hinges, interior fittings or delivery. If you are sourcing paneled hinged wardrobes for a villa, apartment or hotel room floor, the quality of your RFQ determines whether you get comparable numbers or three unrelated guesses. Below is the information we need from buyers, and why each item changes the quote.
Start with the opening, not the wardrobe
Hinged doors need clear space to swing. Before anyone measures a carcass, confirm what sits in front of the unit: a bed, a nightstand, an en-suite door, a window reveal that breaks into the wall. A run that looks fine on a floor plan can be unusable once the room is furnished.
Send us the room drawing with dimensions marked, and state whether the wardrobe is intended to sit in a recess, fill a wall from floor to ceiling, or stand as a freestanding piece. Tell us the clear floor-to-ceiling height at the left end and the right end of the run, not one averaged figure. Ceilings in renovation work are rarely level, and a single number is what creates site problems later.
Door layout and panel style
Paneled doors are defined by their frame-and-panel construction, so the quote needs to say which profile you want. Our shaker panel wardrobe, raised panel and recessed panel doors are built to the same general family but differ in machining time and in how much they collect dust along the moulding. Say which one, or attach a reference image with the panel style circled.
- Number of doors and door width. Give the total run length and let us propose the door split. Very wide single doors sag over time; we will tell you where to add a stile.
- Opening direction and hinge side. Left-hand and right-hand doors, and whether any door meets a perpendicular return wall.
- Corner and angled units. An L-shaped run needs its own drawing showing how the two runs meet.
- Handles or handleless. Profile pulls, integrated finger pulls or magnetic push-open all price differently.
Materials and finish
Our paneled hinged wardrobe doors are offered in the material and finish families we manufacture, including solid wood, wood veneer, lacquer, melamine and acrylic. Specify the door face material and the sheen you expect: matte, satin or high gloss. High gloss shows fingerprints in a high-traffic guest room; matte hides them but costs more to repair on site.
For the carcass, tell us whether you want it matched to the doors or kept neutral, and confirm the board grade you expect for the environment. A wardrobe in an en-suite wall or a coastal villa needs different edging and panel choices from one in a dry bedroom. If you have a finish sample or an RAL / paint code, send the reference rather than a colour name; names such as "oak" or "grey" mean different things to different factories.
Interior configuration
The interior is where most buyers change their mind after the order, and every change re-prices the job. Decide before you send the RFQ:
- Hanging rail heights, including a short rail for shirts and a long rail for dresses and coats.
- Number and depth of shelves, and whether any shelf needs to carry weight such as folded linen or cases.
- Drawers: number, width, soft-close or standard runners, and whether they sit open or behind a door.
- Extras: shoe shelves, trouser pull-outs, jewellery trays, laundry basket holders, mirror panels on the inside of a door.
- Lighting: sensor LEDs in the carcass need a power feed decided at the joinery stage, not after installation.
Hardware, tolerances and site conditions
State the hardware you expect and let us confirm compatibility: hinge brand and type, whether soft-close is required, runner quality and the load rating for drawers. If your project has a specified hardware schedule from an architect or FF&E consultant, attach it.
Also confirm what the building allows: fire-rating requirements for a corridor wall, restrictions on fixing into a party wall, or a strata rule about works hours. We quote to your stated conditions; we do not assume local code compliance on your behalf.
Quantity, phasing and unit of measure
Give the number of wardrobe runs per room type, and repeat it as a schedule: Room Type A, 40 units; Room Type B, 12 units. If rooms are identical, send one drawing and the count. If they differ, send a drawing per type.
State whether you need the whole quantity at once or in phases across room handovers, and name the target on-site date for the first phase. Phasing changes production planning and container planning, so it belongs in the RFQ rather than in a later email.
Delivery, installation and after-sales scope
Write the delivery terms into the request: port, city or site address, and whether you want door-to-door delivery to the project. Our logistics and door-to-door delivery service covers freight arrangement and packaging for container loading, but import terms, duties and local permits are yours to confirm with your own agent.
Say who installs. We support installation and after-sales support, including site guidance and snag inspection, but many buyers use their own joiners. If your team installs, ask for assembly drawings, fixing details and a parts list with the shipment.
Ask us to state in writing what is covered after handover — spare hinges, replacement panels, finish touch-up material — so warranty terms sit next to price when you compare suppliers.
A quick pre-send checklist
- Room drawing with marked dimensions; floor-to-ceiling height at both ends of each run.
- Panel style, door count, door widths, hinge sides and opening direction.
- Door material and sheen, carcass colour, board grade for the room environment.
- Interior layout: rails, shelves, drawers and extras per unit type.
- Hardware schedule, soft-close requirements, handle or handleless detail.
- Unit quantities by room type, phasing plan and target site date.
- Delivery address, Incoterms preference, who installs.
- Site readiness date for openings, and any project-specific conditions.
What a complete RFQ gets you back
With those items in one document, we can quote made-to-measure sizing, the exact finish and layout you specified, and a delivery plan that matches your programme — and two quotes from us at different specification levels become directly comparable. With them missing, every supplier fills the gaps with their own assumptions, and the comparison you thought you were making is not real.
SANTERSON manufactures built-in furniture and works as a custom furniture manufacturer for villa, hospitality and office projects. Send your drawings and the checklist above and we will return a specification-level quotation.