A two tone acrylic kitchen can look identical in a render and quite different once it is on the wall. The difference is rarely the designer's idea; it is the information that reached the factory before pricing and cutting began. Below is the checklist we work through when a buyer, builder or joinery contractor asks us to price Two Tone Acrylic Cabinets, and what each item changes in the quotation.
Why two tone acrylic needs more detail than a single colour run
An acrylic front panel is a decorative face laminated onto a substrate, then edged. With one colour across the whole kitchen, most of the specification questions answer themselves: one panel type, one edge band, one batch. Split the design into two tones -- for example dark bases with light uppers, or a matte field with a high gloss feature wall -- and every line of the order splits with it. Panel batches, edge colours, hardware loading and even the packing list multiply.
That is why an early enquiry that says only "acrylic kitchen, 12 metres, two tone" comes back as a range rather than a price. A factory cannot commit to a number while it still does not know how many panels of each finish are required, whether the two tones meet at a mitred corner or a trims-covered joint, or whether the tall units continue the feature finish to the ceiling.
1. The drawings: layout first, then elevations
Send what you actually have, even if it is rough. A floor plan with wall lengths, window and door positions, ceiling height and the position of services tells us whether the run can be built from standard carcase widths or needs scribes and non-standard boxes. Elevations then show where each tone sits.
- A dimensioned floor plan, in millimetres, with finished wall faces marked -- not a scaled sketch you measured off a printout.
- Elevations or a clear schematic that labels which units take Tone A and which take Tone B.
- Ceiling height and whether the cabinets run to the ceiling, since a full-height panel is a different panel size and a different edge treatment.
- The position of the oven, hob, extractor, dishwasher, fridge and any integrated tall appliance, with the appliance model numbers if they are already chosen.
If there are no drawings yet, say so. We can work from a site survey sheet or arrange design support before pricing, and a rough quotation at that stage is honest as an indicative figure, not a fixed price.
2. Which two finishes, and on which parts
"Two tone acrylic" is a description of the effect, not a specification. Tell us the finish family for each tone. Within our acrylic kitchen range the same design intent can be built with different faces -- High Gloss Acrylic Cabinets for a reflective feature run, Matte Acrylic Cabinets where fingerprints and light spill matter more, or Metallic Acrylic Cabinets when the tone has a metallic flake that shifts under kitchen lighting.
For each tone, the useful details are:
- Colour reference. A manufacturer code, a RAL number, or a physical sample you already hold. Screen colours on a phone are not a specification.
- Gloss level -- high gloss, satin, matte -- because the film and the polishing step differ.
- Which surfaces show acrylic: door fronts only, drawer fronts plus doors, cabinet ends and panels that face into the room, or also the tall-unit sides.
- Edge colour and edge style. Matching edge band is normal; a contrasting or aluminium channel edge has to be called out on the drawing.
- Handle arrangement -- handleless routed groove, profile handle, push-open, or visible knobs -- since a routed handleless door changes the panel construction.
3. Sizes, tolerances and the awkward corners
Our acrylic cabinets are made to measure, so the quotation follows the real openings rather than a catalogue module count. Before we can turn a drawing into panels, someone has to stand in the room with a tape and record what is actually there. What we need from site:
| Item to confirm | Why it changes the price |
|---|---|
| Finished floor and finished wall levels | Carcass heights and scribe widths are set off finished surfaces; a bare slab is not the reference plane. |
| Out-of-plumb walls and uneven floors | Large deviations need packing, scribes or rebuilt boxes, which are cut and finished on site or made specially. |
| Room diagonal measurements | They reveal whether corners are square; a non-square corner changes both adjacent runs. |
| Window sill and rebate depths | They decide whether a run can pass under a window or must stop short. |
| Island dimensions and seating overhang | An island with an overhang needs different carcass depth, support and panel returns on both tones. |
| Appliance recess widths and vent requirements | Integrated ovens and column fridges have fixed minimum clearances that override aesthetic preferences. |
4. Interior specification and hardware
The visible fronts drive the look; the inside drives the invoice. Tell us what each unit is expected to do, and we can price accordingly:
- Carcass material and interior colour -- often a single neutral, but sometimes matched to the tone on that run.
- Drawer boxes versus doors with shelves, and soft-close on which items.
- Corner solutions: magic corner, carousel, pull-out tiers or simply shelf fronts. This is one of the largest single line differences in a quotation.
- Tall-unit internals -- pantry racking, appliance garages, integrated bin housings, drawer stacks.
- Hinge brand and load rating for tall or wide doors; heavy acrylic-faced doors need hinges rated for the actual door weight.
- Integrated lighting in cabinets and under uppers, including where transformers and switches are allowed to sit.
5. Quantities, project type and how the order will be placed
A single villa kitchen and a thirty-apartment scheme are quoted on different logic. For multi-unit work we need the unit mix -- how many identical kitchens, with what variations between typologies -- because repeating a set of panels lets us batch both tones and stabilise the film source. That is also where Custom Built-in Kitchen Cabinets for apartment and hotel projects differ from one-off residential work: shop drawings are approved once, then reproduced.
Also state the delivery structure. A kitchen shipped complete to one address is packed differently from a scheme released in phases across several buildings, and phased releases need agreed lead times per batch rather than one production slot.
6. Logistics and site conditions
Freight details do not change the cabinets, but they change the quotation, and getting them wrong is expensive after production. Please provide:
- Delivery address, and whether goods go to the site or to a port or forwarder.
- Incoterms you want priced -- FOB, CIF or door-to-door delivery.
- Access at the point of delivery: lift dimensions, stair width, turning space for full-height panels and long island tops.
- Whether installation is by your own fitter or needs on-site support, and who handles snags after fitting.
- Required arrival window, tied to plasterboard completion, since cabinets are measured against finished walls.
What a complete enquiry usually contains
Put simply, the enquiry that comes back with a firm number looks like this:
| Section | Typical content |
|---|---|
| Drawings | Floor plan plus elevations, in millimetres, with services and appliances marked |
| Finish schedule | Tone A and Tone B references, gloss level, edge colour, which parts take which tone |
| Site data | Finished levels, heights, diagonals, notes on plumb and square |
| Hardware schedule | Hinges, runners, corner units, handles or handleless detail, lighting |
| Quantities | Number of kitchens or lineal metres per tone, and unit mix for multi-unit work |
| Commercial terms | Destination, Incoterms, phasing, installation responsibility |
If one of those lines is missing, the quotation will carry a qualification against it. That is not a supplier being difficult -- it is the cost of the unknown being left open rather than hidden.
A short note on verification
Before production, ask for a signed shop drawing set showing both tones, panel direction where the sheen or pattern has a grain, and a physical sample of each finish with its edge band applied. Approving a colour chip is not the same as approving an edged panel under kitchen lighting. This step takes days, and it prevents a much longer conversation after the panels have been cut.
If you have drawings and a finish direction, send them with the site dimensions and we will price the two tones against that specification. If the design is still open, start with the layout and the appliance list -- that is enough for an indicative figure, and it tells you where the real cost sits before the finishes are locked in.
Contact SANTERSON: PHILLIP, phone / WhatsApp +86-13928214007, email santerson@qq.com. Enquiries are answered within 24 hours, Monday to Saturday, 8:00 AM-6:00 PM (GMT+8).