A product submittal is the document set a specifier, contractor or buyer reviews before a sliding wall system is released for manufacture. For Santerson Glass Sliding Panels, a made-to-measure item in our Sliding Panel Systems range, the submittal is also the point where an open-ended catalogue listing becomes a defined scope. What follows is the exact package we prepare for each project and the items we need back from your side before production starts.
What a Submittal Covers on a Made-to-Measure Sliding Wall
Glass sliding panels are configured, not stocked. Panel sizes, track layout, glass type and hardware are set per opening, so a submittal has to record every variable that affects what reaches site. A complete package lets your team check three things at once: the system fits the actual openings, the finish matches the approved interior scheme, and nothing in the scope is left to be discovered during installation.
Where a project also uses other systems from the same family — Santerson Closet Sliding Panels, Santerson Partition Sliding Systems or Santerson Textured Sliding Panels — we keep one submittal document per system and one shared finish schedule, so approvals stay traceable across rooms.
The Documents We Include
| Document | Purpose in the review |
|---|---|
| Cover sheet and submittal index | Project name, our reference, revision number, the scope being submitted and the list of attachments. It is what your reviewer uses to track revisions. |
| Shop drawings | Elevations of each opening, panel widths and heights, track position, head, jamb and floor details, and how panels stack and overlap when open. |
| Opening and dimension schedule | Every opening listed with width, height, out-of-plumb allowance and the finished floor level the drawing is set from. |
| Glass make-up sheet | Glass type, thickness and build-up per panel, plus the glazing method. The specific glass specification is confirmed for each project rather than taken from the catalogue page. |
| Finish schedule | Frame colour or anodised finish, glass tint, and any matched surface that has to agree with cabinetry, doors or wall panelling elsewhere in the project. |
| Hardware schedule | Track, hangers, wheels, guides, handles and locks by line item, with quantities per opening. |
| Installation sequence and site requirements | What must be complete before our panels arrive: finished floor levels set, openings plumb and square, ceiling or head structure able to carry the track, and storage area on site. |
| Packing and delivery list | Panel marks matched to the drawings, so crates can be routed to the right floor or villa without opening them. |
Information We Need From Your Side First
- Drawings with the opening dimensions and the reference level they are measured from, plus the finished floor build-up if it is not yet fixed.
- The head condition: exposed structure, ceiling lining, or a bulkhead. Track fixing detail changes with each.
- Whether the panels carry glass only, or also conceal storage, as with closet applications.
- Required glass behaviour for the location — privacy, light transmission, or impact performance where your project specifies it. We confirm the make-up against that requirement rather than assuming one from the product page.
- Any finish already approved elsewhere in the fit-out, so frame and glass tints are matched to a sample reference and not to a screen image.
How Our Submittal Moves Through Approval
Our process for custom work runs from design and prototyping through production, so the submittal is prepared once your layout is fixed and before tooling or glass ordering. The steps are the same ones described on our Custom & OEM Service page:
- Draft submittal. We issue drawings, schedules and a quotation against the layout you supplied. Comments come back marked on the drawings.
- Revision and sign-off. One revision round is normal on configured systems. Your signed cover sheet releases the order into production.
- Production and inspection records. Panel marks on the shop drawings are the marks used in the factory and on the packing list, so site checks refer back to the approved document.
- Delivery and installation support. Freight is arranged door to door under our Logistics & Door-to-Door Delivery service, with installation guidance covered by our Installation & After-sales Support.
Where Submittals Usually Stall
Three causes account for most of the delay we see on sliding wall approvals. First, dimensions taken from an unfinished floor: the track height and panel drop are both set from the finished level, so a build-up decided later forces a re-draw. Second, glass specified from a photograph — tint and transmission read differently in fabricators' samples, so the make-up should be approved on a written specification. Third, hardware left unnamed at tender: wheel and hanger duty is tied to panel weight and size, and an undefined schedule leaves that load unassigned.
If your scope also includes Santerson Acoustic Sliding Panels, add one line to the submittal index for acoustic performance. The catalogue listing does not state a rating, and we do not publish a figure that has not been set for your configuration; the requirement should come from your project brief and be confirmed against the panel build-up we propose.
Submittal checklist before you send our package for approval: cover sheet signed, dimension schedule matched to site-measured openings, glass make-up stated in writing, hardware named by line item, finish referenced to a physical sample, and head structure confirmed as able to carry the track.
Fitting Sliding Panels Into a Wider Package
Sliding walls rarely sit alone. In villa and hospitality work they are usually ordered alongside cabinetry, doors and wall panelling, and the finishes have to agree across all of them. Submitting those items against one finish schedule — rather than one document per supplier — is where our One-stop Solution saves review cycles: a single coordinated set of drawings and schedules for the sliding systems, built-in furniture and interior fixtures on the same project.
Send us the opening dimensions, head condition and the glass behaviour you need for each location, and we will return a draft submittal — shop drawings, dimension schedule, glass make-up and hardware schedule — for your review before anything enters production. Enquiries through our contact page.
Glass make-up, hardware duty, acoustic performance and installation requirements are confirmed per project against your drawings and brief; the product listing describes configuration options rather than fixed specifications.