Glass-fronted wardrobe runs look simple on a rendering and are anything but simple on site. A change of glass tint, door system or carcass depth can move the trade package from joinery into glazing, change what can be shipped flat-packed, and push the handover date if nobody asked the question early. Below is what a buyer, contractor or FF&E consultant should write down before requesting a quotation for glass modular wardrobes, so that the price you compare is the price you install.
Why glazed wardrobes are usually specified too late
In most villa and apartment packages, wardrobes are left to be resolved after the walls are closed up. That works for standard hinged units. It does not work for glazed modular runs, because three of their defining decisions interact with other trades:
- Floor level and finished height. Made-to-measure carcasses are dimensioned off the completed floor build-up. If the screed or flooring thickness moves after order, the run has to be re-cut.
- Door system and clearance. Sliding leaves need track depth and an overhead or side stopping detail; hinged glass needs swing clearance against beds, vanities and doors.
- Glass handling on site. Glazed leaves are heavier and more fragile than board panels, which affects lift sizes, storage and the sequence of works around them.
Specifying early is not about locking in a look. It is about giving the supplier enough fixed information that they can price without covering themselves with provisional items.
Part of the brief: scope, units and quantities
Start with a room-by-room schedule rather than a single lump-sum line. A useful wardrobe schedule records, per unit:
- Room reference and the number of identical units, so quantities can be grouped for production
- Width, height and depth measured to the finished surfaces, plus a note on which surfaces are finished
- Whether the unit sits in a recess, is boxed out, or stands free against a wall
- Ceiling condition: flat slab, bulkhead, sloped, or service runs above
- Obstructions such as skirting, architraves, sockets, radiators, downlights and sprinkler heads
For a modular system this schedule matters more than for a one-off fitted unit, because modular runs are assembled from repeated modules and every deviation becomes a special part. Where the layout is still being tested, ask the supplier to price two layouts on the same opening instead of re-ordering after design freeze.
Part of the brief: the module grid and internal layout
Modular wardrobes are defined by their vertical bays and the function assigned to each bay. Write down the storage mix per room, because it drives the module widths you will be quoted:
| Bay function | What the brief must state |
|---|---|
| Full-height hanging | Short-hang, long-hang or both; rail positions and whether rails are required above drawers |
| Drawer-focused storage | Number of drawer tiers, drawer depth, soft-close requirement, and whether a shoe or linen drawer is needed |
| Shelf-focused storage | Shelf spacing, adjustable or fixed shelves, and the load expectation for heavier items |
| Open display bays | Which bays stay open, and whether internal lighting is required in them |
| Accessories | Trousers pull-out, tray organisers, valet rod, safe box, ironing fold-out: list only what the project needs |
If different unit types are being procured for the same development, a glazed run in master bedrooms and a closed carcass in secondary rooms for example, schedule them separately and state which bays may be swapped between unit types. That is where modular systems earn their keep: one grid carries hanging, drawer-focused and shelf-focused modules, so a change in the storage mix does not have to change the joinery package.
Part of the brief: glass, frame and door system
This is where vague wording costs money. For every glazed leaf, specify:
- Glass type and safety build. State that glazing must be safety glass and record the construction the supplier proposes; do not leave it as "glass".
- Tint and transparency. Clear, frosted, ribbed and smoked tints each read differently under bedroom lighting and against interior paint. Request physical samples of each tint under the project's own colour temperature before design freeze.
- Frame system. Frameless glass leaves, or glass set in an aluminium frame with a stated finish such as black or bronze. The frame profile changes sightlines, hardware and cost.
- Door system. Hinged, sliding, or a mix within one run; note the number of tracks for sliding sets and the required overlap.
- Handle detail. Handleless profile, integrated pull or exposed handle, and whether the same detail applies to the non-glazed doors in the same room.
Where the design intent is a fully glazed wall, ask for the alternative of a mixed run with solid panels at the ends. It is usually easier to install against uneven walls and gives a fixing point for skirting and architrave returns.
Part of the brief: carcass, finishes and edges
The visible glass gets the attention; the carcass decides how the run ages. Record in the brief:
- Board material and thickness for carcass and back panels, as proposed by the supplier
- Interior finish of the carcass: visible interiors matter behind clear glass, so a contrasting interior should be priced deliberately rather than discovered at installation
- Edge treatment and edge banding colour, matched or contrasted
- Surface finishes for solid panels in the same run, with sample references
- Back-panel fixing method, and whether it can absorb wall irregularity on site
For multi-unit projects add a finish schedule tying each room reference to its carcass colour, interior colour, glass tint and frame finish. Two rooms with the same plan but different finishes are two line items, not one.
Part of the brief: interfaces with other trades
A glazed wardrobe is a boundary item. The brief should name who owns each interface, because that is where variation orders appear:
| Interface | Decision to record in the brief |
|---|---|
| Floor | Finished floor level, and whether the wardrobe sits on the finished floor or is packed and trimmed |
| Walls | Whether walls are plumbed and squared to receive the run, or whether scribing and boxing come with the wardrobes |
| Ceiling | Full-height finish, soffit or top panel, and who forms any bulkhead above the run |
| Lighting | Internal lighting power supply, switch or sensor location, and who provides the driver |
| Electrical | Socket and switch positions relative to carcass panels, so no cut-out is made on site |
| Doors and architraves | Which side trims into which, agreed before the run is drawn |
Where a project is being furnished as a package, wardrobes alongside interior fixtures such as kitchen cabinetry, basins and lighting, naming these interfaces once at package level saves repeating them unit by unit.
Sampling, approvals and sign-off
Ask for a staged approval route in writing, and price it. A practical sequence for a glazed modular package:
- Tender stage: layout drawings and an indicative module grid on the same opening, with a clear statement of what is included and excluded.
- Sample stage: glass tint samples, frame finish samples, carcass and edge samples, hardware samples.
- Shop drawing stage: dimensioned drawings per unit type, with mark-ups returned before production release.
- Benchmark unit: for repeat developments, one unit installed and signed off as the quality reference.
- Release to production: written sign-off against approved drawings, with any deviation logged.
State who signs each stage and what happens to a room that departs from the approved benchmark. This is also where custom options are settled: bespoke dimensions, finish combinations and branding on hardware should be requested at shop-drawing stage, not after production release.
Packaging, delivery and installation sequence
Cross-border wardrobe packages fail on logistics more often than on design. Ask the supplier to state, per shipment:
- How glazed leaves travel: separated, crated, or pre-hung in the carcass
- Pack list by room reference, so site teams can sort deliveries without opening everything
- Container loading plan, and lift and door sizes at the destination building
- Who installs, and whether supervision or on-site guidance is included
- The snag and replacement route for damaged glass, including how replacement leaves are produced
Schedule glazed wardrobes late enough that wet trades have dried out, but early enough that flooring, architraves and internal doors can be trimmed into them. Put that sequence in the programme, not in an email.
Before you send the enquiry
Confirm finished floor levels are fixed; confirm opening widths and heights to finished surfaces; list every glass tint, frame finish and door system by name; state which interfaces the wardrobe supplier owns and which stay with the builder; request a physical sample set; require written sign-off at shop-drawing stage. If any of these are still open, price the item provisionally rather than competitively.
Buying wardrobes inside a wider package: what to check in the quotation
Wardrobes are often procured as part of a wider package from a one-stop furniture and building materials supplier, alongside cabinetry, flooring, wall finishes, sanitaryware and lighting. That reduces the number of trade contracts, but it only saves money if the quotation is broken down by package element rather than given as a single figure. Check that you can see separately:
- Carcass and modules, glazing and doors, hardware, and accessories
- Design and shop-drawing service, sampling, and any benchmark unit cost
- Packaging, freight, customs paperwork and delivery to site
- Installation labour, supervision, snagging and replacement parts
A broken-down quotation lets you move value between elements, taking the wardrobe interiors as standard and spending the saving on glass and frames for example, without re-tendering the whole package.
Common specification mistakes, and how the brief prevents each one
| Mistake | Preventive line in the brief |
|---|---|
| Quoting against structural openings instead of finished dimensions | Dimensions to finished surfaces, with finished floor levels confirmed and dated |
| "Glass doors" with no tint, build or frame stated | Named glass type, tint, safety build and frame finish per unit type |
| Interior carcass finish chosen at installation | Interior colour approved with the sample set before release |
| Sliding tracks found on site to clash with ceilings or lights | Track depth and head detail drawn at tender stage |
| Internal lighting ordered after the run is made | Lighting positions, power feed and driver responsibility in the interface table |
| A damaged leaf held up by an unclear replacement route | Replacement and snag terms written into the order |
Procurement brief checklist
- Room-by-room unit schedule with quantities and finished dimensions
- Module grid and storage mix per unit type
- Glass tint, safety build, frame finish and door system named for every leaf
- Carcass material, interior finish, edge treatment and solid-panel finishes scheduled
- Interface responsibility agreed with the builder
- Sample set requested, approval stages defined with signatories
- Packaging, freight, installation and snag terms priced separately
- Installation sequence placed in the programme against wet trades and flooring
If you are putting together a wardrobe package for a villa, apartment or hospitality project, send us the room schedule and finished dimensions. We will return layout options on the same opening, an itemised quotation by package element, and a sample set covering glass tint, frame finish and carcass boards, so the specification is fixed before production release.