A door enquiry that arrives with a full opening schedule, a finish decision and a clear delivery plan is quoted quickly and accurately. An enquiry that says only "we need interior doors" usually comes back with more questions, and every extra round of emails costs both sides time. If you are specifying Santerson Decorative Interior Doors for a villa, apartment or hospitality project, the preparation below is what turns a first enquiry into a firm quotation.
Why interior door enquiries stall more often than they should
Interior doors sit at the junction of three trades: joinery, wall finishing and ironmongery. A decorative door leaf can be manufactured correctly and still fail on site because the floor finish was not accounted for, the architrave detail was never agreed, or the hinge handing did not match the wall. That is why decorative interior doors are made to measure rather than sold as stock sizes: the specification has to carry the details that a standard catalogue item would leave to the installer.
SANTERSON works on project enquiries, where doors are usually part of a wider fit-out alongside cabinetry, wall panelling, flooring and lighting. Buyers who send one consolidated package of information receive a coordinated proposal; buyers who send door sizes alone receive a door price and nothing else.
The opening schedule: the single most useful document you can send
Before anything else, prepare a door schedule. One row per opening is enough, and it should cover:
- Room and reference code — match the numbers on your drawings so nobody argues about which door is which.
- Leaf size and wall thickness — width and height of the opening, plus the finished wall build-up, including plasterboard, tiling or panelling.
- Door type — hinged, sliding, pocket, folding or concealed. Each has different frame, track and wall-cavity requirements.
- Handing and swing — which side the hinges sit on and which way the leaf opens, checked against furniture layout and circulation.
- Threshold and floor finish — the finished floor level on both sides, so undercut and leaf height are correct at handover.
- Quantity per type — identical openings should be grouped, but flag any that differ by even a few millimetres.
Decide the door type before you ask for a price
Decorative interior doors are not one product. The same decorative surface can be built as a hinged leaf, a sliding panel or a concealed door that disappears into the wall finish, and each choice changes what you need to supply alongside it.
| Situation on site | Type worth considering | What else must be confirmed |
|---|---|---|
| Standard rooms with a conventional frame and architrave detail | Hinged interior doors, including flush designs that sit level with the wall face | Frame profile, architrave or square edge, ironmongery cut-outs |
| Tight circulation where a swinging leaf gets in the way | Sliding and pocket doors | Wall cavity depth, track and hardware load, floor guide |
| A door that should read as part of the wall cladding or panelling | Concealed doors aligned with the surrounding paneling | Panelling material and thickness, concealed hinge rating, alignment tolerance |
| An opening you want to open fully, such as a study or pantry entrance | Folding doors | Panel count, pivot and track position, clear opening width |
Related types in the same collections are worth naming explicitly in your enquiry if you are comparing them: Santerson Flush Interior Doors for a clean, wall-aligned hinged line, and Santerson Wooden Sliding Doors where the opening is wide and a swing leaf would waste floor space. Naming the type avoids a quotation that answers a question you did not ask.
Materials, finishes and how far the look needs to travel
Decorative doors are bought for their surface, so send the finish decision rather than a description of it. Useful inputs:
- A finish reference — veneer species and cut, laminate or lacquer colour code, paint sheen level, or a physical sample you can post.
- Where the same finish must repeat elsewhere in the project: wardrobe fronts, wall panelling, media units, vanity cabinets. Matching surfaces across trades is far easier when they are ordered together.
- The wear expectation for each area — guest room doors, corridor doors and back-of-house doors take different punishment, and that should be stated rather than assumed.
- Edge and profile detail: square edge, eased edge, routed grooves or a moulded panel pattern. A photograph of the reference you are trying to match is often clearer than words.
If you are also fitting out bathrooms, kitchens or storage in the same project, SANTERSON custom and OEM service covers bespoke finishes, textures and material choices across furniture and interior products, which is the practical reason to keep doors, joinery and panelling on one specification sheet instead of three.
Ironmongery, glass and interface details you should not leave open
The leaf is only part of the assembly. Before contacting the supplier, settle these:
- Hardware responsibility — are handles, hinges, locks and closers supplied by you, or should they be quoted with the doors? If pre-drilling and hinge mortising are required, that must be in the enquiry.
- Glass specification — clear, frosted, smoked or ribbed glass where a decorative door includes glazing, plus the glazed area per opening.
- Acoustic and privacy expectation — say which rooms need it; do not expect the supplier to guess from a photo.
- Wall build-up detail — stud type, cavity depth and finishing material for sliding, pocket and concealed doors.
- Fire or performance requirements — if your project requires a rated door assembly, state it in the enquiry and confirm what is being certified before you order.
Project context: quantities, programme and destination
A quotation depends on commercial facts as much as technical ones. Have these ready:
- Total door count, split by type and finish, with a note on which openings are highest priority.
- The stage of your project — concept, detailed design or construction — because that determines whether the sizes are provisional or fixed.
- Required site delivery date, working backwards from your installation programme rather than forwards from today.
- Delivery address and who receives goods on site, plus the Incoterms you want quoted. SANTERSON arranges logistics and door-to-door delivery, so a project destination changes what can be offered.
- Whether installation support is needed on site, or whether your own trades will fit the doors.
A short message template that gets a usable reply
We are specifying interior doors for a [villa / apartment / hotel] project in [location], currently at [design stage]. Attached is a door schedule of [N] openings covering [hinged / sliding / pocket / concealed] types, with wall thicknesses and finished floor levels noted. Finishes required: [reference or sample reference]. Hardware will be [supplied by you / quoted with the doors]. Target site delivery: [date], delivered to [city / port], on [Incoterms]. Please confirm what additional details you need before quoting.
Attach drawings and the schedule as files rather than pasting dimensions into the body of the message, and number your attachments so both sides refer to the same revision.
Questions worth asking the supplier in that first email
- Which dimensions do you need as as-built, and which can still be provisional?
- What tolerance is allowed on the finished opening, and who prepares the openings on site?
- Are frames, architraves and sills included in the quoted price, or priced separately?
- How are variations handled once production has started?
- How are doors packed and labelled so each leaf reaches the right opening?
- What happens if a leaf is damaged in transit or a site dimension changes after dispatch?
These are ordinary procurement questions, and a supplier who answers them clearly on day one is usually the same supplier who handles a change order cleanly later.
Checklist before you press send
- Door schedule complete: code, size, wall thickness, type, handing, quantity.
- Finish confirmed by reference or sample, including any matching joinery.
- Glass, ironmongery and performance requirements stated per opening.
- Wall and floor build-up details supplied for sliding, pocket and concealed doors.
- Delivery address, target date and preferred Incoterms stated.
- Drawings attached with revision numbers.