A swim spa looks like a simple line item on a villa or resort bill of quantities until the first site question arrives: what exactly is included, what has to be supplied locally, and who signs off on the electrical connection. The Outdoor Swim Spa WS-PC06ST-L is a configurable outdoor swim and hydrotherapy unit in SANTERSON's swimming pool range, and it is exactly the kind of product where a well-documented specification protects the project and an undocumented one creates variation orders. Below is the record we recommend procurement teams keep on file before the purchase order is raised.

1. Model identity and catalog dimensions

Record the model code as it appears in the catalogue — WS-PC06ST-L — together with the catalog-listed envelope of 6390 × 2400 × 1470 mm. The length suffix matters here: a closely related model, Outdoor Swim Spa WS-PC06ST, shares the same 2400 mm width and 1470 mm depth but is listed at 5900 mm in length. That 490 mm difference changes the foundation footprint, the plant-room clearance, the access route for delivery and, on a tight terrace, whether the unit fits at all. Keep the drawing dimension, the catalogue dimension and the ordered model code in the same table so nobody compares a plan measurement against the wrong variant.

2. Equipment shown in the standard specification

The site's product specification lists the following for this model. Transcribe it into your submittal, and mark each row as included, optional or to be confirmed rather than assuming a default.

Specification itemShown on the product page
ModelWS-PC06ST-L
Catalog dimensions6390 × 2400 × 1470 mm
Control system1 set
Swim training system1 set
Filter pump1 pc
Jet total6 pcs
LED lights4
Total power6.55 kW
Features shownWater jets, LED lighting, Ozone, Swim training system

Two entries deserve a written answer before order placement. First, the water pump is not listed for this model in the captured specification, so confirm whether a water pump forms part of your selected configuration and how it relates to the filter pump that is listed. Second, treat the 6.55 kW figure as a specification value to be verified against the final configuration, because adding options changes the connected load. Both items belong in the quotation clarification sheet, not in a phone call.

3. Options that change price, power and site works

The catalogue lists optional accessories for this range: control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so each option needs confirmation for the specific unit you are buying. For each one, document three things on the same line:

  • Whether it is factory-supplied or to be sourced locally — a heat pump, an insulation package and sand filtration can split across two suppliers if the scope is not written down.
  • The additional electrical load and circuit requirement it introduces, which feeds the electrical engineer's design rather than the pool supplier's.
  • The site consequence: steps change access and safety details, insulation changes the envelope, and sand filtration needs space for the tank and its plumbing.

4. Electrical and interface responsibilities

The product page instructs buyers to confirm included equipment and electrical requirements for the selected configuration. That single sentence is the most important line in the record. Build a responsibility matrix covering: the supply breaker and protection device; cable routing from the distribution board to the unit's control position; the dedicated circuit or circuits for the swim training system, filtration and any heat pump; earthing and equipotential bonding at the pool surround; and who performs commissioning. Assign each row to the main contractor, the MEP subcontractor or the supplier, with a name against it. A 6.55 kW unit is not an appliance someone plugs in on site, and the interface between the spa's control system and the building's electrical design is where projects lose time.

5. Delivery, handling and installation sequence

SANTERSON describes turnkey delivery from design and production through door-to-door logistics, with installation and after-sales support listed among its services. For a pre-engineered shell delivered to a villa or resort site, the documentation should state: the Incoterms and destination, the delivery access route and any crane or forklift requirement, the date the foundation and surround must be complete relative to arrival, and the sequence of levelling, plumbing connection, electrical connection, filling and commissioning. Confirm transport dimensions and weight with the supplier rather than inferring them from the catalog envelope, and confirm local installation arrangements, warranty terms and response commitments for your specific project before they are relied on in a programme.

6. The approval pack to submit

Before the purchase order is issued, assemble one submittal containing: the signed specification sheet with every option marked included or excluded; dimension drawings for the foundation and access route; the electrical load schedule and responsibility matrix; the water supply, drainage and overflow details; a maintenance access note for the filter pump and control system; and the written confirmation of what is supplied versus installed locally. Where this model sits alongside other configurations in the same swimming pool range, keep one comparison sheet so substitutions during value engineering are visible rather than silent.

Documentation rule of thumb: if a value is not written on the approved specification sheet, it is not included. Model code, dimensions, jet count, control set, swim training system, filtration and total power should each have a supplier signature next to them.

SANTERSON has supplied furniture and building materials for villa, hospitality and office projects since 2008, with custom/OEM manufacturing, logistics and installation support alongside the product range. If you are specifying this swim spa for a project, send the model code, your site drawing and your option list to the team on the contact page and ask for a configuration-specific specification sheet before the order is raised.