Decorative fixtures are the small items that finish a bathroom: wall sconces, vanity lighting, towel warmers and rails, shelving accessories, mirror cabinets and the trim pieces around a vanity run. On their own none of them is complicated. Ordered as one-off showroom samples they rarely cause trouble. Ordered across thirty or forty guest bathrooms, or repeated through a villa with six ensuites, they become a coordination problem that shows up on site as drilled holes in the wrong place, tiles cut twice and electrical outlets sitting behind a cabinet door.
Santerson's decorative fixtures are made to order rather than picked from a stock catalogue. Finish, layout and dimensions are specified per project, which is exactly why the enquiry needs better inputs than a product name and a quantity. The list below is what our project team works from when a bathroom package moves from selection to production, and it applies equally to wall sconces, towel warmers and rails and shelving accessories.
Start with the room, not the item
A fixture schedule that lists only model codes cannot be checked against anything. Before any dimension is fixed, we ask for a reflected ceiling plan or at least a set of wall elevations for each bathroom type, with finished floor level and finished wall face marked. Everything downstream — the height of a sconce above a mirror, the reach of a rail from a shower enclosure, whether a shelf clears a door swing — is measured from those two references.
For villa and hospitality projects we recommend grouping bathrooms into types first. A typical project has three or four repeating layouts; once one type is dimensioned properly, the rest are variations of it. That single step removes most of the back-and-forth later, and it lets us quote a batch instead of thirty separate line items.
The measurements we need
These are the dimensions that determine whether a fixture can be built to fit. Send them as a marked-up drawing rather than a spreadsheet of bare numbers, because the reference point matters as much as the value.
| Item | What to provide | Why it matters |
|---|---|---|
| Wall build-up | Finished wall face, substrate type, cavity depth and the position of any noggins or blocking | Wall-hung items need solid fixing. A rail or cabinet fixed to tile over an empty cavity needs blocking set before the tiles go on. |
| Mirror and vanity geometry | Width and height of the mirror, vanity top height and depth, basin type (undermount, vessel or integrated countertop) | Sconces and vanity lights are positioned relative to the mirror edge and the user's sightline; a vessel basin raises the tap and changes the clearance above it. |
| Electrical outlet positions | Centre height and offset from the finished wall face, plus which circuits are switched | Prewired cabinets and lit mirrors must clear the back box. Moving an outlet after tiling is the most expensive correction on this list. |
| Shower enclosure and door lines | Enclosure setout, hinge side, and door swing radius | Rails, shelves and robe-mounted accessories must clear the swing and stay outside the wet zone unless the specification says otherwise. |
| Tile setting-out drawing | Joint lines where a fixture will be drilled or sit proud of the wall | Fixings landing on a grout line look careless; landing mid-tile risks a chipped face. Coordinating before production avoids both. |
| Clearance to traffic routes | Aisle widths and the position of adjacent doors or robes | Protruding shelves, rails and robe-mounted accessories need enough clearance not to foul a door or a walkway. |
| Countertop and surface material | Stone, engineered stone, laminate or solid surface, with slab thickness | Basin cut-outs, integrated tops and any top-mounted accessory are cut to the actual thickness, not a nominal one. |
| Sample quantities per type | Number of each bathroom type, plus how many rooms share that layout | Determines whether a fixture is made as one prototype or as a matched batch with consistent finish. |
Project inputs beyond dimensions
Dimensions get the item to fit. These inputs get it approved, delivered and installed without surprises.
- Finish reference. Send a physical sample or an exact brand-and-code reference for any metal or paint finish you are matching — tapware, door ironmongery, kitchen handles. Screens photograph badly, and "brushed gold" is not one colour across suppliers.
- Electrical specification. Voltage, frequency, driver or transformer preference, dimming method, and whether the supply is switched at the wall or at the fitting. For anything near a shower or bath, tell us the zone layout so suitability can be confirmed with your electrician rather than assumed by us.
- Mounting method. Surface mount, recessed, or fixed into joinery. Recessed items need the pocket dimension and the depth available in the wall build-up.
- Storage layout for mirror cabinets. Shelf positions, which side the hinges go, whether internal power or a shaver socket is required, and whether the front is mirrored on both faces.
- Delivery terms and destination. Port or site address, Incoterms you want quoted, and packaging expectations. Fragile and prewired items ship differently from loose hardware.
- Installation responsibility. Whether your trades install everything, or whether we supply fixing details, templates and instructions for the site team.
How these inputs come back as a quotation
Once we hold the drawings and finish references, the package is priced as configured items rather than catalogue lines: each fixture carries its dimensions, finish, electrical specification and mounting method on the schedule. That document then does double duty — it is the production instruction in the factory and the check list your site team uses at handover.
Because we work as a furniture and building materials manufacturer, the same schedule usually covers more than the accessories. Vanities, mirror cabinets, countertops, basins, cabinetry, wall panelling, lighting and flooring on the same project are drawn from one coordinated set of dimensions. When a single trade measures for each product separately, tolerances drift; when one package is dimensioned once, the fixings line up.
For projects that need this handled end to end, our one-stop solution covers design consultation and space planning, material selection and product specification, manufacturing with quality control, project management and site coordination, then installation and handover. The custom and OEM service adds bespoke finishes, textures and branding where a project has its own design language to follow.
A practical sequence for specifying decorative fixtures
1. Fix the bathroom types before selecting finishes
Selecting a sconce before the mirror size is settled wastes an approval cycle. Settle layout first, finish second.
2. Issue one combined fixture schedule
Put every accessory for a bathroom type on a single drawing with reference letters, so the electrician, tiler and cabinetmaker are all reading the same coordinates.
3. Confirm first-article items before batch production
For repeating layouts, produce one complete bathroom set first — sconce, mirror cabinet, rail, shelving — and have it reviewed as a group. Finish mismatch between items from different batches is far easier to see when they are installed together.
4. Freeze the electrical setout before tiles are ordered
Outlets, switches and any recessed driver pockets should be locked while the wall is still open. This is where most site rework on accessories originates.
5. Plan packaging and delivery by fragile and non-fragile
Lit mirrors, glass shelving and prewired panels need separate crating from rails and loose hardware. Telling us which items arrive at the site and which go to a warehouse changes the packing spec.
Common problems this process prevents
- A sconce centred on the mirror when the drawing intended it centred on the vanity — resolved by one reference dimension, stated once.
- A back box hidden behind a mirror cabinet that cannot then sit flat against the wall.
- A towel rail fixed into a cavity with no blocking, requiring the tile to be lifted and re-set.
- Matching finishes ordered from different batches that read as two different metals under bathroom lighting.
- Quantities counted per item rather than per bathroom type, leaving one or two rooms short at handover.
Questions buyers ask us most often
Can you supply matching decorative fixtures with the vanities and mirror cabinets?
Yes. Vanities, LED mirror cabinets, countertops and the accessories that surround them are drawn from the same specification set, so finish and dimensions are coordinated rather than matched after the fact.
Do you confirm electrical ratings for each project?
Electrical specification is confirmed per configuration and per installation position with your electrician or MEP consultant. We build to the voltage, dimming method and mounting detail you specify, and we flag where a position needs a rating we cannot assume from the drawing alone.
What if our drawings are not dimensioned yet?
Send what you have. Our interior design and project coordination service covers space planning, furniture layouts and 3D visualisations, so an early-stage brief can be developed into a dimensioned schedule before production is quoted.
Is there a minimum order quantity for custom sizes?
Flexible minimums are part of the custom and OEM service, and the practical answer depends on the item and finish. Tell us the count per bathroom type and we will confirm what is workable before you commit to a schedule.
To get an accurate quotation: send your bathroom layout drawings, the number of each bathroom type, finish references, and the destination for delivery. With those four inputs we can return a configured fixture schedule instead of a rough estimate.