A swim spa quotation is easy to compare on price and hard to compare on substance. Two suppliers can both quote a six-metre shell with jets and still deliver very different pools once you look at the water volume, the shell build-up, what sits under the cabinet and which pumps are actually included. If your project centres on the Outdoor Swim Spa WS-PC06ST, this article sets out how to read its specification, what to ask for in a sample package before you commit, and how to line up rival proposals so the comparison is honest.

Start From What the Catalog Already States

The published record for WS-PC06ST gives you a starting position to test every quotation against. The catalog lists an overall shell of 5900 × 2400 × 1470 mm, one control system, one swim training system, one filter pump, six jets, four LED lights and a total power figure of 6.55 kW. The feature list shown on the page is water jets, LED lighting, ozone and a swim training system.

Two details in that record matter more than they look. First, the water pump is not listed in the captured specifications for this model, while the filter pump is. On a swim spa the swim pump is the heart of the exercise function, so a quotation that quietly omits it, or prices it as an extra you did not budget for, changes both the cost and the experience. Second, total power is a sum, not a performance claim. It tells you what to plan for electrically; it does not tell you how strong the swim current feels at the far end of the shell.

Read the catalog figures as a specification to confirm, not as an order. Equipment included and electrical requirements depend on the configuration you select, so treat every number below as a line item to verify in writing before payment.

The Specification Sheet Worth Demanding

Ask each supplier for the same sheet, in the same order. A proposal that cannot fill these rows is not comparable with one that can.

  • Shell dimensions and water depth. Exterior size tells you nothing about swim length. Ask for internal water length, seat height and water depth, because a deep shell gives you usable swim space in a shorter footprint.
  • Shell build-up. Acrylic shell type and thickness, the reinforcing layer behind it, and how the cabinet is insulated. Insulation value only counts if it is continuous and sealed against moisture.
  • Pump schedule. Swim pump and filter pump, each with flow rate and duty point, plus how many speeds or settings each runs at. A swim spa can be configured without a water pump listed, so confirm this row exists before you compare anything else.
  • Jet count and layout. Six jets on this model is a hydrotherapy count, not a massage-cabin count. Ask where they sit and which muscle groups they target, then compare with the jet counts on spa-led models in the same range.
  • Swim training system. The type of current generator, its adjustable settings, and any grille or nozzle wear parts that need replacement.
  • Filtration and sanitation. Filter type and micron rating, pump runtime control, and how the ozone system is dosed. Ask what UV sterilisation would add if you want it.
  • Lighting and controls. Number and position of LED fittings, plus which functions are on the control system and whether a second control point is available.
  • Power and protection. Total connected load, phase and voltage, circuit protection, earthing and residual-current requirements for an outdoor installation.
  • Options priced separately. Heat pump, water pumps, sand filtration, insulation upgrades, steps, automatic cover. Get each as a numbered add-on rather than buried in the base price.

How WS-PC06ST Sits Against Its Own Variants

Within the configurable swim and hydrotherapy range, three closely related models show how much one letter or suffix changes the machine. Comparing them is a useful discipline, because it forces you to ask which function you are actually buying: swim length, jet therapy, or a low-depth wading platform.

ItemWS-PC06STWS-PC06ST-LWS-PC06CH
Catalog dimensions5900 × 2400 × 1470 mm6390 × 2400 × 1470 mm6000 × 3000 × 900 mm
Jet total6 pcsAs quoted for the selected configuration38 pcs
LED lights4As quoted for the selected configuration1 pc
Total power6.55 kWAs quoted for the selected configuration3.25 kW
Swim training systemIncluded in the features shownIncluded in the features shownNot listed in the features shown

The pattern is instructive. WS-PC06ST and its long version share the same depth and width, so a longer shell mainly buys you swim length rather than a different seating plan. The CH model goes the other way: greater width and far more jets at a lower overall height and a lower total power figure, which points to a therapy-and-play pool rather than an exercise channel. A quotation that swaps you between these three without restating what you lose is not a saving; it is a different product.

What a Sample Package Should Contain Before You Order

You cannot test-drive a six-metre shell in a factory, but you can insist on physical and documentary evidence before the order is placed. A sample package for a project of this size should include:

  • A cut-away or material sample of the shell layering and the insulation board used behind the cabinet, so you can see the build-up instead of trusting a brochure line.
  • Hardware samples: the acrylic edge finish, cabinet cladding profile, jet face and grille, and the step or access detail that will be exposed to weather.
  • A dimensioned drawing of the selected configuration, with internal water length, seat positions and service access marked.
  • The pump and equipment schedule for that exact configuration, including what is standard and what is optional.
  • An electrical single-line note covering load, protection and earthing for outdoor installation.
  • A written list of accessories with prices, so heat pumps, filtration upgrades and covers can be compared line by line across suppliers.

For finishes elsewhere in the same project, sample practice is simpler: wall-to-wall carpet and other fitted finishes are made to your size, colour, pattern and fibre blend, and samples are available before production. Ask for the swim spa evidence and the finish samples in the same round of requests, so one approval cycle covers both.

Scoring Competing Proposals Without Being Misled

Score each proposal on a small number of weighted points rather than on the headline price. A practical weighting for a residential or villa installation:

  • Swim function (highest weight). Current quality, adjustability, and whether the swim pump is included in the quoted price.
  • Shell and insulation build-up. Material evidence, not marketing adjectives.
  • Operating cost exposure. Total connected load, heating approach, and how much of that load runs during normal use rather than during maintenance cycles.
  • Maintenance access. Can a technician reach the pumps, filter and controls without dismantling the cladding?
  • Scope of supply and delivery. Who handles freight, customs paperwork and door-to-door delivery, and what happens on site after arrival.
  • After-sales terms. Warranty scope, spare parts availability for jets, grilles, controls and lighting, and who performs installation and inspection.

Two traps recur in swim spa procurement. The first is a low quotation built on a bare shell: the heat pump, cover and steps appear as extras after you have committed, and the total lands above a fuller competing offer. The second is a specification written in adjectives — "powerful jets", "premium insulation" — with no numbers behind them. Where the wording cannot be measured, ask for it to be replaced with a figure or removed from the contract.

Coordination With the Rest of the Outdoor Build

A swim spa rarely arrives alone. It lands next to decking, paving, screening, outdoor lounge seating and sometimes pergolas and loungers, and each interface needs one owner. Confirm who designs the load-bearing platform, who sets the drainage fall, who runs the electrical sub-main to the unit, and who seals the shell to the surrounding deck. Where these sit with different trades, delays appear at handover rather than at order.

This is where a single supplier covering swimming pools and swim spas alongside outdoor furniture and building finishes reduces coordination work: one drawing set, one container plan and one inspection list. SANTERSON works as a China-based manufacturer and one-stop supplier for furniture and building materials, supplying custom and OEM products with logistics, door-to-door delivery, installation support and after-sales service under the same project scope.

If the standard shell dimensions do not suit the site, ask about bespoke geometry. The range includes outdoor spas made to customised shapes — square, round, oval and curved — on an acrylic shell with structural reinforcement, which is the route to take when a terrace or courtyard cannot accept a rectangular footprint.

Questions to Put in Writing Before Payment

  • Which pumps are included for WS-PC06ST in this configuration, and what is each one's flow rate?
  • What is the internal swim length, and at what current setting is it rated?
  • What insulation is fitted to the shell, cabinet base and pipework, and how is it sealed against moisture?
  • Which items on the quotation are optional rather than standard: heat pump, UV sterilisation, sand filtration, steps, cover?
  • Who supplies the platform, sub-main electrical work and deck sealant, and who is liable for each?
  • What is covered by warranty, for how long, and which parts are consumables?
  • How are spare jets, grilles, LED fittings and control boards supplied after handover?

Get those answers in one document from every bidder. The proposal that answers them cleanly is usually the one worth paying more for, because the cost of a swim spa is not the shell — it is everything you discover after installation.

To confirm the configuration, included equipment and electrical requirements for this model, request the specification sheet and sample package from our project team. We supply outdoor swim spas and the surrounding outdoor furniture and building finishes as one coordinated scope, with production, freight and after-sales support handled under a single contract.

Enquiries: SANTERSON contact page. Phone / WhatsApp: +86-13928214007 (PHILLIP). Email: santerson@qq.com.