A square swim spa that doubles as a hydrotherapy spa and a cooling-off pool is one of the easiest outdoor purchases to get wrong, because most of the cost sits in decisions made before production begins. This guide walks through exactly what buyers should confirm on the drawing sheet and in the quotation for our Outdoor Swim Spa WS-PC02 before we start fabricating the shell.
Start With the Catalog Baseline of WS-PC02
WS-PC02 is a configurable model in our outdoor swim and hydrotherapy range, listed at 3000 × 3000 × 1050 mm. The catalog page shows one control system, two water pumps, one filter pump, sixty jets in total, LED lighting, and a total power figure of 7.35 kW. Treat these as the starting point for your specification, not as a finished configuration: the equipment list you order is the one written into the signed drawing and quotation.
| Catalog footprint | 3000 × 3000 × 1050 mm |
| Pump set shown in catalog | 2 water pumps, 1 filter pump |
| Jet total shown in catalog | 60 pcs |
| Total power shown in catalog | 7.35 kW |
| Features shown | Water jets, LED lighting, Ozone |
Confirm the Site Conditions Before You Confirm the Shell
A 3 m × 3 m shell holds a large volume of water, so the slab, deck or terrace supporting it needs to carry that weight and sit level. Send us a sketch of the intended location with the access route marked, and we will tell you whether the spa can reach that position as one piece or whether the delivery sequence has to change.
- Structure and drainage: confirm the load rating of the slab, the waterproofing detail at the perimeter, and where overflow and drain-down water will go.
- Clearance for service: leave access to the equipment compartment. Filters, pumps and the control system need room to be reached without draining the spa.
- Coverage and privacy: decide now whether pergolas, screens or glass balustrades sit around the spa, since these affect access panel positions and how a lid is lifted and stored.
Confirm the Electrical Supply Against the Selected Configuration
The catalog figure of 7.35 kW is what the standard configuration draws; a heat pump, extra pumps or added lighting change that number. Before production we need your local supply details — voltage, phase, breaker rating and cable run length — so the control system and protection devices match what your electrician will install. Local wiring rules are handled by a local licensed electrician: nominate them early and share our terminal schedule with them rather than assuming a generic connection will pass inspection.
Decide Which Options Are In and Which Are Out
The options we list for this range include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Each one has knock-on effects on power draw, cabinet space and price, so lock the list down in writing:
- Heating: a heat pump changes both the electrical load and the running pattern; state whether you want year-round use or seasonal.
- Water treatment: ozone is shown as standard on this model, with UV sterilization available as an option. Confirm which combination your maintenance plan assumes.
- Filtration and insulation: sand filtration and insulation packages matter most in hot or cold climates; tell us the installation climate.
- Steps and seating: entry steps and seat layout change internal dimensions, so they must be on the drawing before tooling.
Check Whether a Swim Training System Is Required
The catalog entry for WS-PC02 does not list a swim training system. If your brief is swimming against a current rather than hydrotherapy and cooling off, raise that at the enquiry stage: we will confirm whether propulsion equipment can be added to this specification or direct you to a model in our Swimming Pools and Swim Spas range that already carries it. Catching this after order confirmation is the most expensive mistake in the whole process.
Agree on Customisation Scope if You Need It
Where a standard shell does not suit, our outdoor spas support customised shapes such as square, round, oval and curved to fit the space, with an acrylic shell and structural reinforcement behind it. Our Custom Furniture Manufacturer service also covers bespoke finishes, so surrounds, cabinetry and matching outdoor furniture can be specified together with the spa rather than sourced separately.
Fix the Logistics and Handover Details in the Same Document
Because our scope runs from design through production to Furniture Logistics and Door-to-door Delivery, the shipping method is a specification question, not an afterthought. Confirm port of destination, delivery address access, container loading plan and who signs off on receipt. Then set out Furniture Installation and After-sales Support responsibilities: who commissions the plant, who fills and tests the spa, and what spare parts ship with the unit.
A Pre-Production Checklist to Sign Off
- Signed dimension drawing at 3000 × 3000 × 1050 mm, with any customised shape change recorded.
- Equipment schedule: pumps, jet count, control system and LED lighting as configured for your order.
- Electrical data from site: supply, phase, protection, and the local electrician identified.
- Option list confirmed: heat pump, UV, sand filtration, insulation, steps.
- Swim training requirement answered yes or no in writing.
- Freight terms, delivery access plan and installation responsibilities agreed.
Send us the site sketch, your supply details and the option list you want, and we will return a configuration drawing and quotation for WS-PC02 that your engineer and electrician can both review. Contact SANTERSON to start the specification review.