A wood grain melamine wardrobe looks simple on a drawing: a tall box, a warm oak or walnut tone, doors that close flush. The costliest problems in these projects rarely come from the visible door face. They come from what nobody wrote down before production started — which substrate carries the panel, how the grain is laid out, how the carcass meets an uneven wall, and who signs off on the sample. Below is the checklist we work through with architects, builders and project buyers before a single board is cut.
1. Confirm the finish you are actually buying
"Wood grain" covers several different surface systems, and they behave differently on site. In our catalogue, Wood Grain Melamine Wardrobes sit in the melamine wardrobe family alongside Textured, Matte Finish, Solid Color and Two Tone variants. The distinction matters when you compare quotations: a decorative paper finish, a foil wrap and a real wood veneer can all be described as "oak look" on a schedule.
Ask three questions in writing. First, what is the surface material — melamine-impregnated paper, foil, or veneer with lacquer? Second, what sheen: matte, satin or high gloss? Gloss reflects light across a wide door and shows every fingerprint in a hotel bedroom; matte hides handling marks but reads softer under low lighting. Third, what is the texture — smooth, or an embossed grain that follows the printed pattern? A textured surface catches dust in its grooves, which changes how often housekeeping has to wipe the doors.
2. Fix the substrate and the board thickness
The melamine decorative layer is only as stable as the board under it. Particleboard, MDF and plywood each take edge banding, screws and humidity differently. For a wardrobe that runs floor to ceiling, the back panel thickness and how it is fixed matter more than most buyers expect: a thin back panel pinned into an uneven wall will telegraph the wall's bends through the carcass.
- State the substrate for doors, carcass, shelves and drawer boxes separately. They do not have to match, but each one has to be named.
- Confirm board thickness per component, and whether the doors are reinforced or flattened to prevent curl on tall panels.
- Specify the edge banding material and colour — matching ABS or PVC on all visible edges, including the door tops that face outward on an open-ended run.
- Ask how the panel construction is confirmed for your project. Our built-in furniture is made to measure, with material and finish options set per project rather than chosen from a fixed size grid.
3. Agree the grain direction and panel layout before cutting
This is the single most common source of rework on wood grain melamine joinery. A printed grain has a direction, and once a board is cut you cannot rotate it without changing how the pattern reads across the elevation.
- Decide vertical or horizontal grain per elevation, and mark it on the shop drawing — not only in an email.
- For a run of doors that read as one surface, ask whether the grain is sequenced across the set. Unsequenced doors can show obvious banding at the reveal lines.
- Confirm which face of each board is visible. A return panel that turns a corner may expose an edge you did not plan to band.
- Check where the pattern lands relative to handles, mirror inlays and drawer fronts, so a prominent knot or figure does not sit at eye level beside the bed.
4. Lock the site dimensions and the wall conditions
Wardrobe carcasses are manufactured to millimetres; rooms are not. Before production, someone has to record what the opening actually is, not what the architectural drawing says it should be.
| Site item to confirm | Why it stops production later |
|---|---|
| Floor level and finish height | Screed or flooring changes the effective height; toe-kick and plinth details depend on it. |
| Wall plumbness and corner angles | A non-right corner turns a square carcass into a scribed job that must be drawn in advance. |
| Skiirting, architrave and cornice | Decide whether the wardrobe cuts through them or is scribed around — this changes the panel cut list. |
| Switches, sockets, AC grilles, sprinklers | Cut-outs must appear on the shop drawing before the panel is machined. |
| Doors and drawer clearance | Sliding or hinged doors need clear swing past beds, handles and adjacent cabinetry. |
| Fitting sequence and access | Tall assembled carcasses must fit the lift, stairwell and corridor that deliver them to the room. |
5. Specify the interior layout against real storage needs
The exterior sells the wardrobe; the interior decides whether the client is happy a year later. Fix the hanging heights before the carcass is drilled, because shelf-pin rows and drawer positions cannot be moved afterwards without visible repair.
- Long-hang for coats and dresses, double-hang for shirts, and clear height above drawers — record each dimension on the drawing.
- Decide shelf spans and whether they need support mid-span for heavy folded stock.
- Name the hardware: hinge brand and opening angle, slide type and load rating, soft-close or not. Hardware is a separate line item in most quotations, so leaving it vague invites substitutions.
- Add lighting only with a decided power route; a drilled light channel in a melamine shelf cannot be hidden if the plan changes.
6. Get a sample and an approval record
A finish number on a schedule is not a finished surface. Before release, request a physical sample of the exact door construction — board, melamine face, edge band and colour — viewed in the site's own lighting where possible. Approve it as a signed, dated reference with a batch note, and keep one copy on file for the balance of the order.
7. Coordinate the wardrobe with the rest of the fit-out
Wardrobes are almost never bought alone. In a villa or apartment package they have to match kitchen cabinetry, doors and wall panelling in tone and edge detail — and the same wood grain melamine family appears across our kitchen cabinets as well. Ordering those elements from one production line makes the tone match easier to control than matching between separate suppliers, and it puts carcass tolerances, hardware standards and delivery windows under a single coordination plan.
That is where turnkey project solutions earn their keep: joinery, cabinetry, doors, flooring and loose furniture move through one drawing set, one production schedule and one delivery sequence. Our workflow runs from design consultation and space planning through material selection, manufacturing and quality control, then site coordination and installation handover — described in full on our interior design services page.
How to start a wardrobe enquiry without losing weeks
Send the room elevation, the floor finish heights, your preferred tone reference, and the interior layout you want. From that we can return shop drawings with grain direction, edge detail and hardware called out, so the approval you sign is the same document the factory works from. Because sizing, layout and finish are set per project, there is no standard price list to compare line by line — send your drawings or a room list to our team, and we will quote against the actual specification.
Before you release a wardrobe order
Send us your elevation drawings, the substrate and sheen you intend to use, and the site conditions from the table above. We will mark what is missing before production starts — which is far cheaper than marking it after.