A folding door in wood veneer looks simple on a drawing and complicated on site. Before the panels are pressed, cut and packed, these are the decisions we ask every project team to sign off with us — and the ones that save the most rework.

Why custom wood veneer folding doors need more sign-off than a standard door

Our Santerson Wood Veneer Folding Doors are made to measure for residential and villa projects, with the finish, layout and dimensions specified project by project. That flexibility is the point of the product, but it also means the order is only as good as the information behind it. A folding door is an assembly rather than a single leaf: several panels, hinges between them, a track above or below, and a veneer surface that has to read as one continuous design across all of them.

Once the veneer sheets are cut and pressed onto the panel cores, changes are expensive. Everything below is worth settling in writing before production starts.

1. The opening: finished dimensions, not structural ones

  • Which dimension governs. Send us the clear opening measured after the floor finish, wall finish and ceiling set-out are complete — not the structural shell dimension. Folding doors have very little tolerance for a floor that is out of level along the track line.
  • Total width and panel count. The number of panels decides the folding ratio, the stack width when open, and where the leading leaf parks. Tell us where the door must sit when fully open so the stack does not block a switch, a radiator or a piece of furniture.
  • Height to the head. Confirm the space above the opening for the track and for any ceiling reveal, and whether the head is solid, framed or clad.
  • Threshold or no threshold. A recessed bottom track behaves differently from a top-hung door with a floor guide, especially where the flooring continues through the opening.

2. The veneer: species, cut and grain direction

Veneer is the part of the order most often revised too late. Please confirm with us, on a physical sample where possible:

  • Species and figure. Walnut, oak and other species each behave differently under the same lacquer, and the site photographs you work from are not colour references.
  • Cut and grain direction. Rift-cut, crown-cut and quarter-cut all read differently across a run of panels. State whether the grain runs vertically or horizontally across the folding set, and whether the panels are book-matched.
  • Batch continuity. For more than one set in the same room, tell us at the time of order so the panels come from matched veneer batches rather than two separate lots.
  • Finish system. Matte, satin or high-gloss lacquer; open-pore or closed-pore; stained or natural. Send a signed-off sample panel and keep it for inspection at delivery.

3. Hardware, movement and the wall above

Folding doors carry their weight through the track, so the structure above the opening has to be agreed before we produce anything. We need to know the expected use — a lightly used cupboard front, a frequently opened room divider, or a wide opening on a villa terrace — because that drives the hardware specification and the panel thickness. Confirm with us:

  • The load path: whether the head structure can carry the track fixing pattern we specify.
  • Handle style and whether the doors are handleless or use recessed pulls, which changes the edge detail.
  • Whether a lock, latch or child-safe fitting is required.
  • Direction of fold and which side the stack lands on — always state this as viewed from a named room, never as "left" or "right".

4. Where the same detail must match the rest of the joinery

On most villa and apartment projects the folding door is one item in a larger run of cabinetry and panelling. If the doors sit beside wood veneer panelling, a media wall or a wardrobe run, then the reveal, shadow gap, architrave detail and lacquer sheen have to be drawn once and shared across all the items. Send us the elevation drawings for the whole wall, not just the door opening.

If a hinged or sliding alternative appears elsewhere on the same floor plan, let us know so the veneer, edge profile and ironmongery are consistent — Santerson Wood Veneer Hinged Doors and Wood Veneer Pocket Doors are usually specified to the same finish schedule.

5. Quantities, phasing and site access

  • Confirm the full schedule of openings with quantities in one document; a second revision after cutting has begun is where cost and time are lost.
  • Tell us whether the order ships in one release or in phases tied to the site programme.
  • Flag access constraints early: lift dimensions, stair widths and turning radii decide panel sizes and how the set is packed for transport.

Production release checklist — confirm before we cut

  • Clear opening width, height and floor level along the full track line
  • Panel count, fold direction and stack position, stated from a named room
  • Veneer species, cut, grain direction and matching rule, against an approved sample
  • Lacquer system and sheen, with the signed sample retained for handover inspection
  • Track type, load path and head structure confirmation from the site team
  • Handles, latch or lock, and any accessibility requirement
  • Coordinated elevations for adjoining panelling and cabinetry
  • Quantity schedule, shipping release plan and delivery access route

How we work these orders through

For custom joinery our sequence is straightforward: you send the drawings and the schedule above, we return shop drawings and a specification for your approval, and production starts only after that approval is signed. Our custom and OEM service covers bespoke finishes and materials; our turnkey solutions coordinate the doors with the rest of the furniture and building materials on the project, through to door-to-door delivery and installation support.

If you are specifying a folding set now, send us the opening dimensions, the room elevation and the finish reference, and we will come back with shop drawings that show the panel split, the stack width and the veneer layout before anything is committed.

Santerson — furniture and building materials manufacturer, supplying custom joinery to residential, villa and hospitality projects since 2008.