A wardrobe quote that looks complete on the first read is often the one that costs the most to correct later. For an L shaped corner wardrobe, the two walls meeting at a right angle, the return leg that has to clear a door swing or a skirting line, and the internal layout that decides whether the corner is usable storage or dead space — all of that has to be settled on paper before production starts. This checklist walks through what a serious quotation should state, and how to read each line as a buyer or project manager.
1. The measured dimensions behind the numbers
Ask where each figure in the quote came from. A made-to-measure wardrobe is quoted against finished-face dimensions, so the quotation should say whether wall finishes, floor finishes, skirting, architraves and any ceiling bulkhead are already included in the measured opening, or whether they will be applied after the unit is installed. An L Shaped Corner Wardrobe quoted from a structural drawing rather than a site survey usually needs adjustment at the return leg, where out-of-plumb walls change the effective length.
- Overall width and depth of each leg, plus the corner transition dimension.
- Floor-to-ceiling height at more than one point along each wall, not a single average.
- A note on which side is finished and which butts into an adjacent wall or cabinet run.
- Clearances for doors, handles, light switches, radiators and any recessed socket.
2. What the internal layout actually says
Many quotations list "wardrobe interior" as a single line item. That is not enough to price or to compare. The quote should break the interior into hanging zones, shelf stacks, drawer banks and open display niches, with the height of each hanging area stated so long garments and short-hung clothes are separated deliberately rather than by default.
The corner itself is the part to interrogate. A square corner carcass can waste a deep wedge unless the quotation specifies how it is handled: a rotated angled hang rail, a pull-out carousel, a bi-fold door that opens the corner fully, or simply a shelf run carried across the return. If none of these appear in the quote, assume the corner will be handed over as inaccessible space and raise it before ordering.
3. Materials, finishes and hardware line items
Material descriptions should name the board type for the carcass and the doors separately, the edge treatment on visible edges, and the surface finish by name — matte lacquer, high gloss acrylic, melamine, wood veneer, glass front or aluminium frame. For project work this matters because a finish has to match joinery and bedroom wardrobe runs supplied by other trades in the same development.
Hardware deserves its own lines, not a lump sum. Hinges, drawer runners, handles or handleless profiles, hanging rails, integrated lighting and any soft-close fittings should be listed with quantities so substitutions are visible. A quote that bundles "hardware set" hides the difference between a specification that will take daily use in a rental scheme and one that will not.
| Quote line | What to confirm before you sign |
|---|---|
| Carcass board | Board type, thickness, which edges are edged and which are butted; moisture rating if the wall is prone to damp. |
| Door panels | Finish name and colour reference, panel style, whether the sample you approved is referenced by code in the quote. |
| Hardware | Brand or grade where stated, quantities per door and per drawer, soft-close inclusion. |
| Internal layout | Zone-by-zone breakdown with heights; treatment of the corner wedge. |
| Optional extras | Integrated lighting, mirrors, glass inserts, plinth or scribe detail to an uneven wall. |
4. Scope boundaries: what is excluded and who supplies it
Read the exclusions as carefully as the price. Site preparation, making good plaster, removing existing built-ins, electrical work for internal lighting, and any packing needed to fit around an uneven floor are commonly left out of a wardrobe quotation. If your project needs those, they belong in the quote or in a named third party's scope, not in an assumption.
For units ordered from overseas factories, the boundary questions are logistical. A quotation for import should state the Incoterms being offered, what is included in packing and container loading, which export documents are provided, and where responsibility transfers to you. Whether you are comparing an L Shaped Walk in Wardrobe against a corner unit, or furnishing several bedrooms at once through a one-stop furniture and building materials supplier, the same lines need to be settled: freight mode, who handles customs clearance, and how the delivery address is served.
5. Production sequence and change control
A quotation should state what has to be confirmed before cutting starts — drawing approval, finish sample sign-off, appliance or accessory positions — and what happens if a dimension changes after that point. Corner wardrobes are made-to-measure, so a late wall adjustment can mean remaking panels rather than trimming them.
Ask for the drawing set as part of the quotation, not as a later deliverable. Elevations showing each leg, section through the corner, and an internal layout with dimensions let you catch a clash with a door swing or a ceiling line while it is still a pencil change. Suppliers working to a design-and-production workflow will normally issue production drawings for your confirmation before manufacturing begins.
6. Comparing two quotes on the same basis
Never compare headline prices between two wardrobe quotations directly. Rebuild both onto one sheet: same measured opening, same carcass board, same finish reference, same hardware grade, same internal layout, same delivery and installation scope. A lower total usually reflects something removed — a shallower return leg, fewer drawers, no soft-close, or freight quoted to port rather than to site.
7. Installation, handover and after-sales terms
The quotation should say who installs, whether installation is on site with your team or by technicians sent to the project, and what access and floor protection you are expected to provide. Handover terms matter too: how snags are recorded, what is covered afterwards, and how replacement panels or spare hardware are ordered if a door is damaged during later site works.
Written warranty terms — duration, what is excluded, and who handles claims when the unit was shipped internationally — belong in the quotation stage. A supplier offering installation and after-sales support as part of the package should state that scope in writing rather than leaving it to a later conversation.
Before you sign: a short verification list
- Dimensions traced to a site survey of finished faces, with heights taken at several points.
- Internal layout broken down zone by zone, including an explicit solution for the corner wedge.
- Carcass, doors, finishes and hardware itemised separately with finish codes you approved.
- Exclusions written out; site works, electrical and making good assigned to a named party.
- Freight terms, documents and delivery address stated, not assumed.
- Production drawings issued for your approval before manufacturing starts.
- Installation responsibility, snag process and after-sales terms in writing.
SANTERSON manufactures made-to-measure corner and walk-in wardrobes with project-specific dimensions, layouts, materials and finishes, alongside cabinetry, doors and interior fixtures for villa, hotel and apartment projects. Send us the measured drawings or a room layout and we will return a quotation with the carcass, door finish, hardware and internal zones itemised line by line, so you can compare it against any other supplier on the same basis.