A buffet cabinet looks like a small line item on a villa or hospitality schedule until it crosses an ocean. Custom casework arrives with the dining room already finished, the site team is waiting for it, and any mistake in sizing, packaging or paperwork costs weeks rather than days. The sequence below is how we prepare Santerson Buffet Cabinets for export from our China factory to a project site overseas, stage by stage, so the order lands complete and can be installed on the day it is planned.

Confirm the cabinet specification before the shipping plan starts

Buffet cabinets in this range are made to order. Height, width and depth follow the wall they sit against; the internal layout follows how the piece will actually be used; and the finish is selected from the material options rather than a fixed colour card. That flexibility is exactly why the specification has to be closed out before any freight discussion begins.

For each unit on the order we agree, in writing:

  • Overall dimensions against the site drawing, including skirting, architraves, wall finishes and any recess the cabinet has to sit inside.
  • Internal configuration: drawer bank, adjustable shelving, closed or open display section, cut-outs for appliances or a worktop overhang.
  • Carcass and door material, edge treatment, handle or pull-free detail, and the finish sample you have signed off.
  • Worktop material and thickness if the cabinet carries stone, plus the setting-out of any splashback.
  • Quantities per room and per unit type, so a single shipment can be packed by room rather than as loose components.

A signed shop drawing is the reference for production and for the packing list later. If your team changes a dimension after that point, we re-issue the drawing and the packing documentation together, which keeps the customs paperwork aligned with what is actually in the crate.

Choose the Incoterms and the delivery address early

The delivery method shapes cost more than the cabinet itself, so it should be fixed while the order is still in production. Our furniture logistics and door-to-door delivery service covers freight forwarding by sea, air and rail, and we can quote against whichever term your project team prefers:

OptionWhat we handleWhat stays with you
Door-to-doorFactory packing, export clearance, main carriage, import clearance support and delivery to the site or store address.Unloading at site, on-site storage, final installation access.
Port-to-port / CIFPacking, export clearance and ocean freight to the destination port.Customs broker, duty and GST, inland haulage to site.
Ex-works or FOBProduction, packing and handover at the nominated point.All freight, insurance, clearance and inland delivery through your own forwarder.

For a single villa order, consolidated door-to-door usually costs less in management time than arranging three separate suppliers' shipments. For a multi-unit residential or hospitality order, we plan container loading at the factory so that cabinets for the same apartment or floor are packed together and marked accordingly.

Pack casework for ocean freight, not for a truck run

Custom cabinets are the part of an order most exposed to handling damage, because doors, mitred corners and finished panels cannot be sanded out on site. Our packing routine for export casework includes:

  • Foam and corner protection on every door, panel and stone worktop edge, with finished faces separated.
  • Plywood crates or cartons sized to the unit, with cleats that stop movement inside the crate during rolling and lashing.
  • Flat-pack where the design allows it, with hardware bagged, labelled and matched to a numbered assembly drawing.
  • Crate markings that tie back to the room schedule, so the site team knows which crate belongs to which apartment before it is opened.
  • Drying desiccant inside the crate for long sea legs, and loading plans that put heavy casework on the container floor and lighter goods above it.

We also send photographs of the packed crates before the container is sealed. That record protects both sides if a claim arises, and it lets your site team check the count against the packing list before unloading begins.

Prepare customs documents that match the crate contents

Freight forwarding is only half of furniture freight by sea, air and rail; the documents decide whether the container clears in two days or sits at the port. For each shipment we provide:

  • Commercial invoice with a clear description of goods, quantity, value and currency.
  • Packing list by crate, with dimensions, net and gross weight and the room reference on each crate.
  • Certificate of origin where your import rules call for one.
  • Bill of lading or air waybill details confirmed before release, so the consignee matches the party clearing customs.

Duty rates, GST treatment and any import permits are set by the destination country and change with classification, so we confirm those figures with your broker for the specific order rather than quoting them as fixed numbers. If you nominate a broker in advance, we send the draft documents to them before the vessel sails, which is where most clearance delays get avoided.

Time the arrival against the site programme

Cabinets cannot be installed until flooring, wall finishes and skirting are complete, but they should not arrive before those trades finish either. We work backwards from your handover date: production lead time, then packing, then the sailing or flight, then inland delivery, with a buffer for clearance. Because our turnkey interior project solutions cover design coordination, production and logistics in one scope, we can move that date as a single package instead of chasing several suppliers to resynchronise.

Two practical points from Australian villa and apartment work: book the delivery window once the site is confirmed accessible for a truck and a tail-lift, and keep a dry, covered storage area on site for crates that arrive ahead of installation. Cabinets stored in an open, damp yard are the most common cause of avoidable damage claims.

Plan receiving and installation before the truck arrives

On arrival we ask your team to check crate counts against the packing list and photograph any damaged crate before it is opened, then open crates room by room and check doors and panels for transit marks.

Our furniture installation and after-sales support covers on-site fitting, inspection against the snags list, spare parts and replacement where a panel has been damaged in transit. Level adjustment, door alignment and fixing into the wall are done at this stage, and the signed-off room schedule becomes the handover record.

Checklist before the container is booked

Signed shop drawings and finish samples; Incoterms and delivery address confirmed; customs broker nominated; crate markings tied to room numbers; documents sent to the broker before sailing; delivery window booked; covered storage prepared; snag inspection scheduled. Every one of those items is settled inside the order, not on the day the container arrives.

Questions buyers ask us most often

Can buffet cabinets ship flat-packed? Where the construction allows it, yes, which reduces volume and freight cost. Mitred or fully assembled carcasses travel in crates instead, and we tell you which option applies to each unit type at quotation stage.

Who clears customs? Either party can, depending on the Incoterms chosen. With door-to-door we coordinate clearance support; with FOB or ex-works your own broker handles it and we supply the documents they require.

What if a panel is damaged in transit? Photograph the crate and the panel before assembly, send us the crate number and the packing list line, and we arrange replacement parts or panels through the after-sales process rather than asking you to repair finished casework on site.

Can the cabinets ship with the rest of the fit-out? Yes. Wardrobes, vanities, kitchen cabinetry, lighting and flooring from the same order are consolidated so that one shipment serves the whole project, with packing separated by room.

Send us the room schedule, target delivery city and preferred Incoterms, and we will quote the cabinets and the freight together as one line. Contact PHILLIP, SANTERSON, Longjiang, Shunde, Foshan, China. Phone / WhatsApp: +86-13928214007. Email: santerson@qq.com. Enquiry page: Contact Us.