A single wardrobe line item rarely stays single for long. The bedroom tower that starts as one run of open shelving turns into a drawer bank, a hanging bay, a glass-front display section and a matching unit in the corridor. Budgeting a project around open modular wardrobes means pricing a system of compatible parts, not counting boxes. This guide shows how buyers, contractors and interior studios scope that system so the quotation they receive is the quotation they sign.
Why Modular Wardrobes Break the Per-Unit Pricing Model
Closed, catalog-sized furniture can be priced per piece. Modular wardrobe systems cannot, because the unit of sale is a set of modules that share an interface: the same carcass depth, the same panel thickness, the same finish schedule, the same hardware family. Open modular wardrobes sit at the extreme end of this logic. With no doors to standardise, cost moves into the carcass quality, the shelf spans, the back panel detail and the way each module terminates against a wall or another module.
Two consequences follow. First, quantity alone does not drive price; configuration does. Second, an open system makes specification errors visible after installation, so the scoping stage is where budget is either protected or lost.
Step 1: Define the Module Families Before Counting Anything
Before any measurement, decide which module families the project actually needs. Most residential and hospitality fit-outs draw on four:
- Hanging modules for garments on rails, including short-hang double stacks in compact bedrooms.
- Drawer-focused modules for folded and personal items, where drawer count and runner quality drive most of the cost.
- Shelf-focused modules for folded stacks, linen and display, where span width decides shelf thickness.
- Glass-front or framed modules used as display sections inside an otherwise open run.
SANTERSON's Modular Wardrobes collection covers these families as separate product lines, each made to measure with material and finish options. That structure is useful at budget stage: you can price one module from each family, then multiply by realistic counts per room type instead of guessing a lump sum.
Step 2: Build a Room-by-Room Bill of Modules
A multi-product project needs a bill of modules per room type, not per floor plan. Repeat unit types in villa and apartment packages share the same module mix; only dimensions change. A practical structure looks like this:
| Room type | Typical module mix | What to fix before pricing |
|---|---|---|
| Master bedroom | Hanging bay, drawer bank, full-height open shelving, display section | Total run length, ceiling height, whether the end bays return into the wall |
| Second bedroom / guest | Single hanging module plus shelf-focused modules | Rail count, shelf depth, whether a tower is shared with a corridor |
| Dressing room | Open run with island-adjacent drawer units, glass-front display | Aisle clearance, lighting positions, glass type |
| Hotel guest room | Compact hanging module, shelf stack, luggage bay | Repeat dimensions across rooms, wear-resistant finish selection |
Count modules per room type, then multiply by the number of rooms. This gives a quantity sheet a manufacturer can price line by line, and it exposes duplicated work that a single "wardrobes" allowance hides.
Step 3: Separate Base Cost from Finish Cost
Open systems show their carcass. That means the finish specification is not a cosmetic add-on but a cost driver you should price as a separate layer:
- Carcass and structure. Board material, edge treatment and panel thickness are fixed across the project; changing them mid-project changes every module.
- Surface finish. Melamine, lacquer, veneer and acrylic all read differently in an open run. Veneer and high-gloss lacquer sit at the premium end; textured and solid-colour melamine is the workhorse for repeat guest rooms.
- Hardware. Hinges, runners and rail systems should be specified once and applied consistently, because mixed hardware families create spare-parts and maintenance problems in hospitality projects.
- Integrated lighting. Shelf and niche lighting is easier to plan at scoping than to retrofit; cable routes and driver positions need to appear on the drawings.
Ask for the quotation in these four layers. When a budget needs to move, you can downgrade finish without touching structure, which is not possible with a single blended price.
Step 4: Control Made-to-Measure Risk Across Multiple Products
Made-to-measure sizing is the main reason modular wardrobes deliver value and the main reason they overrun. Three controls keep it disciplined:
One finish schedule, not several
Every additional board colour or door style multiplies minimum order quantities and offcut waste across a multi-product project. Fix one primary finish for the whole project, plus at most one accent finish.
Verified dimensions before production release
Open runs expose out-of-plumb walls and uneven floors immediately. Confirm final dimensions after floor and ceiling finishes are complete, not at first fix, and record the confirmed figures against each module.
Written specification per module
Each line on the quantity sheet should state dimensions, board material, finish code, hardware type and internal layout. Where a product page lists configuration options without fixed numbers, treat those as options to be confirmed for the project rather than as published specifications.
Step 5: Consolidate Wardrobes With the Rest of the Fit-out
Wardrobes rarely stand alone. The same board material, edge band and finish code usually appear in vanity units, tall cabinets, media walls and door linings. Splitting these across suppliers means paying twice for colour matching, twice for freight consolidation and twice for site coordination.
Sourcing built-in joinery together with the other interior fixtures through a one-stop project furnishing supplier keeps finish consistency under one quality-control process and one shipping plan. For villa and apartment packages, combining wardrobe systems with cabinetry, doors, wall panelling and lighting also reduces the number of separate site instructions, which is where most coordination cost sits.
Budget rule of thumb: scope in this order: module families, then quantities per room type, then structure and hardware, then finishes, then lighting. Reversing the order is how projects end up paying premium carcass prices for a finish they later change.
A Practical Quotation Checklist
- Module families named and drawn, with open, drawer-focused, hanging and glass-front sections identified separately.
- Quantities per room type, multiplied by the number of rooms, with a spare allowance for site-cut panels.
- Board material, panel thickness and edge treatment stated once for the whole project.
- Finish codes confirmed against physical samples, not screen images.
- Hardware family fixed, with runner and hinge type written on every line.
- Lighting positions, driver locations and cable routes shown on layout drawings.
- Final dimensions taken after wet trades and floor finishes are complete.
- Packaging, container loading sequence and delivery address aligned with site storage capacity.
A quotation that answers all eight points can be compared line by line against a competitor. A quotation that answers none of them cannot, which is why an unscoped "wardrobe allowance" almost always becomes a variation order.
Send us your module schedule
SANTERSON manufactures modular and open wardrobe systems alongside cabinetry, doors, panelling and interior fixtures for villa, hospitality and apartment projects. Share your room types, quantities and finish preference, and we will return a layered quotation covering structure, hardware, finish and lighting so you can manage the budget by layer instead of by lump sum.
Contact: PHILLIP | Phone / WhatsApp: +86-13928214007 | Email: santerson@qq.com
Related collections: Drawer Focused Modular Wardrobes, Hanging Modular Wardrobes and Freestanding Open Wardrobes. Dimensions, materials and finishes are confirmed per project.