A swim spa is one of the easiest wellness amenities to add to a project that has no room for a full swimming pool. It occupies a compact footprint, arrives as a self-contained unit and can be installed on a terrace, a deck or a courtyard. The question most buyers ask us first is not whether it works, but where it actually fits on their site. This article answers that question for the Outdoor Swim Spa WS-115AⅢ-U, using the specifications published in our catalogue and the practical constraints a hotel or villa project has to satisfy.

What the WS-115AⅢ-U configuration includes

The model is part of our configurable outdoor swim and hydrotherapy range. The catalogue lists the following for this configuration:

Catalog dimensions3880 × 2200 × 1250 mm
Jet total23 pcs
Water pump4 pcs
Filter pump1 pc
Control system1 set
LED lights1 pc
Total power11.85 kW
Features shownWater jets, LED lighting, Ozone
Swim training systemNot listed for this configuration

Two points in that table drive every siting decision. First, the jet package and four water pumps make this a hydrotherapy-first unit rather than a lane for lap swimming; if continuous swimming is the brief, look at configurations on our swimming pool category that list a swim training system. Second, total power of 11.85 kW needs a dedicated supply and an electrical plan agreed before the unit arrives on site. Confirm included equipment and electrical requirements for the selected configuration with our team at quotation stage.

Hotel applications

For hospitality projects, the value of a compact swim spa is that it creates an amenity-grade wellness space without the structural work of a full pool. Three settings suit this configuration well:

  • Rooftop and podium terraces. The 3880 × 2200 mm plan fits within a terrace bay that would otherwise hold lounge seating only. Check the slab's load capacity, waterproofing and drainage with your structural engineer before fixing the position.
  • Spa and wellness floors. Twenty-three jets support a treatment-led circuit: guests move between hydrotherapy, heat and rest without needing a large water area. Ozone is listed as a feature on this configuration, which supports the water-quality regime your operations team will specify.
  • Suite-level and boutique outdoor rooms. Where each suite has its own terrace or courtyard, a unit of this size can be repeated across rooms as a product standard rather than treated as bespoke work.

Villa applications

On residential projects the same footprint solves different problems:

  • Narrow-site villas and townhouses. A side courtyard or rear terrace too small for a lap pool still takes a swim spa, and the 1250 mm catalog depth gives usable water depth without dominating the outdoor room.
  • Deck-mounted installations. The unit can sit on a raised wooden deck, which is often cheaper than excavation and concrete shell work. Confirm the deck's bearing structure with your engineer.
  • Year-round use where a pool sits idle. Heat pumps and insulation appear in the catalogue's optional-accessory list, so the water can be held at bathing temperature outside the swimming season and the amenity keeps earning its space. Confirm the selected equipment with us before ordering.

Site conditions to settle before you specify

  • Access and delivery route. The unit is delivered as a manufactured module. Measure gates, lifts and turning radii on the route from the kerb to the final position, not just the position itself.
  • Structural support. A filled shell plus occupants is a heavy point load. Terraces, decks and podium slabs need verification by a local engineer.
  • Power and protection. Plan the circuit, isolation and protective devices to the configuration's total power, with the electrician working from the same specification sheet you approved.
  • Drainage and overflow. Locate the drain route and any overflow path before finishes are fixed.
  • Privacy and sightlines. On a rooftop or shared terrace, screen height and orientation affect both guest privacy and neighbouring properties.
Catalogue figures above are transcribed from our published product page for this model. Optional accessories in the catalogue include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps; availability and compatibility vary by model. Final equipment list, power supply and installation details are confirmed per project configuration.

How a swim spa fits into our turnkey scope

A swim spa rarely stands alone in a project bill of quantities. It arrives alongside outdoor seating, paving, wall finishes and lighting for the same terrace, and it is usually procured together with bathroom sanitary fixtures, vanities and shower systems for the floors above. As a one-stop furniture and building materials supplier, we handle this scope as one package: design consultation and space planning, material selection and product specification, manufacturing and quality control, project management and site coordination, then delivery and installation. Our turnkey interior project solutions cover villa, hospitality and office projects, and our furniture logistics and door-to-door delivery service arranges freight, packaging and container loading to site.

If your project needs a different shape or size instead of the WS-115AⅢ-U, we also supply a customizable shape outdoor spa in square, round, oval and curved designs, and a long outdoor swim spa that pairs a swimming channel with a separate hydrotherapy area.

Send us your terrace plan

Share the available dimensions, the structure type and your target configuration, and we will confirm which swim spa models fit that space, what the equipment list contains and how the unit is delivered to site. Contact: PHILLIP, +86-13928214007 (phone / WhatsApp), santerson@qq.com.