A two-tone kitchen that pairs light grey uppers with dark grey lowers looks simple on paper, which is exactly why quotations for it drift. Two projects can share the same flat panel door profile and still land far apart in price, because the cost sits in the layout, the integrated appliances, the lit glass cabinets and how precisely the opening was measured. If you send a supplier the drawing package below, the first quotation you receive is close to the final one — and the revision rounds that delay villa and apartment fit-outs simply do not happen.

1. The measured drawing, not a photograph

A reference photo tells a supplier what you like. It does not tell them what to build. For custom cabinetry the working document is a set of room dimensions with:

  • Overall wall lengths, room height and the position of every corner return.
  • Floor-to-ceiling heights at more than one point, since slab and screed levels vary across a site.
  • Window sill heights, door swing directions and any structural column or beam that runs through the cabinet line.
  • Plumbing stacks, flues and the position of the existing exhaust outlet.
  • Finished floor level and finished wall level, clearly marked as finishes rather than structure.

If a design package exists, send the elevations and the reflected ceiling plan too. Where no drawings exist yet, say so in the enquiry — SANTERSON's interior design service covers space layout planning, concept design with mood boards, furniture layouts and 3D visual renderings, and project design coordination through to production drawings, so an enquiry can start from a sketch and a set of site measurements.

2. Layout type and run lengths

State the configuration you are working to — single wall, L-shaped, U-shaped, galley, or kitchen with an island — and give the linear metres of base units and wall units separately. Corner conditions drive cost more than length does, so name each one: a blind corner with pull-out carousels, a lazy Susan, a corner unit with diagonal carcass, or a simple squared-off return that avoids the corner entirely.

For an island, add the worktop overhang, whether the island carries sink, hob or dishwasher, and whether seating is on one side or two. An island with appliances needs services routed through the carcass and a plinth detail that hides them.

3. The two-tone split you actually want

With a light-and-dark scheme, be explicit about which run is which tone. A common arrangement places light grey on the wall units and dark grey on the base units so the room reads lighter above the worktop; some layouts reverse it, or carry the darker tone up a tall bank of pantry and oven housing to anchor the wall. Tell the supplier:

  • Which elevations are light and which are dark, including the tall cabinets.
  • Whether the tall bank matches the base tone or the wall tone.
  • Whether open shelves, niche panels and the valance match either tone or take a third finish.

Colour names are not reliable across batches. Send an RAL or Pantone reference, a physical sample, or the supplier's own board code, and ask for a door sample before production. A light and dark grey modern kitchen cabinet specification on the SANTERSON catalogue is built this way: light grey uppers, dark grey lowers, flat panel doors, glass display cabinets at both ends of the run with warm LED lighting inside, and an under-cabinet light strip over the cooking zone.

4. Door profile, handle detail and surface finish

Flat panel doors in a grey scheme look identical at a glance and behave very differently in use. Specify three things:

  • Profile. A slab door, a shallow shaker rebate, or an integrated handleless channel. Handleless runs need a consistent reveal on every drawer, so the supplier must know whether to design for a J-pull, a C-pull or a rail.
  • Surface. Matte, high gloss, textured or wood-grain effect. Gloss grey shows fingerprints and edge line; matte textured grey hides them but needs a finish that wipes clean without dulling.
  • Substrate and edge. The board type and the edge banding or lacquer wrap on the door edges, because that is where a grey panel either holds its colour or starts to show a light line.

SANTERSON's catalogue groups these choices by finish family, so an enquiry can reference a known option instead of describing one: grey matte cabinets for a soft low-sheen front, and grey minimalist cabinets where the intent is a clean handleless face.

5. Integrated appliances and their model numbers

A two-tone grey kitchen usually reads as "seamless" only because the appliances are behind panels or inside reserved housings. Send the appliance list with make, model number and the installation drawing for each unit — not just the width. The supplier needs to know:

  • Which appliances are panel-ready and which show their own front.
  • Whether ovens sit side by side or stack in a tall housing, and at what height.
  • Refrigerator dimensions including door swing and clearance for the handle.
  • Dishwasher, wine cabinet and microwave positions, plus ventilation requirements for each.
  • Power point and isolator locations relative to the carcass line.

Appliance housings are the part most often re-made on site. A stacked double oven housing that was sized from a nominal 600 mm width rather than the selected model's fixing drawing will not accept the trim kit.

6. Glass display cabinets and their lighting

Lit glass cabinetry is what lifts a grey scheme from plain to considered, and it carries its own specification list. Confirm with the supplier:

  • Glass type — clear, frosted, smoked or ribbed — and the frame material and colour.
  • Shelf spacing and whether shelves are glass, timber or metal.
  • LED colour temperature (warm or cool), strip position, and where the transformer sits so it stays accessible.
  • Switching: door-triggered, touch, or a wall switch, and who supplies the wiring to the cabinet.
  • Whether the display cabinets are wall-hung, part of a tall unit, or a full-height wine cabinet with bottle racking.

A grey modern kitchen cabinet with an LED glass wine cabinet shows how the display element works in a two-tone scheme: closed storage on either side, one full-height lit glass section for bottles and glassware, stacked oven housing alongside, and a marble-pattern stone backsplash described as stain resistant and easy to wipe.

7. Worktop, splashback and the interface with them

Cabinetry is quoted against a worktop assumption even when the stone is bought elsewhere. State the worktop material and thickness, the splashback height and whether it runs to the underside of the wall units or up to the ceiling, and the edge profile. Then confirm who cuts the hob aperture, how the sink is fixed (undermount, flush or inset), and whether an upstand or scribe to the wall is expected.

8. Internal storage plan

The carcass price barely changes between projects; the internals are where quotations separate. List what each run must hold:

  • Drawer count and depths, including cutlery and utensil trays.
  • Pull-out larder baskets, spice racks and door-mounted racks.
  • Bin and recycling stations, with the number of compartments and whether a ventilated plinth is needed.
  • Appliance garages, small-appliance pockets and where those units get their power.
  • Hinge and runner brand or grade, and soft-close on which items.

9. Project context, quantities and site conditions

The same kitchen quoted for one villa and for forty apartment units is a different exercise in documentation. Give the supplier:

Item to supplyWhy it changes the quotation
Unit count and repetitionRepeat layouts are amortised across a run; one-off layouts carry full detailing time.
Project typePrivate villas, high-rise apartments and boutique hotels each have different handover documentation and inspection expectations.
Delivery address and accessHigh-rise lift dimensions, loading-bay hours and floor-by-floor handling decide whether panels arrive in one container or several crates.
Phasing and programme datesBatched deliveries need staged production; a single drop needs one complete set.
Incoterms and destination portFreight, customs paperwork and inland transport are quoted per shipment route.
Who installsLocal fitters need assembly-ready carcasses and clear fixing details; supplier-led installation needs site access dates.

SANTERSON's service scope covers custom and OEM manufacturing, freight forwarding with customs documentation and container loading plans, door-to-door delivery, on-site installation and snag inspection. Confirm the commercial terms — Incoterms, duties, insurance, transit window and the exact delivery point — for your own route rather than assuming a published service description applies unchanged to your site.

10. What you want quoted back

Ask for the quotation in a form you can compare line by line against other offers. Request:

  • A price per elevation or per unit type, not one lump figure.
  • The specification written beside each line: board, finish, hardware grade, glass and lighting.
  • What is excluded — worktop, sink, tap, appliances, electrical first fix, plinth lighting transformer.
  • Packaging and container loading plan, with a crate mark drawing if the site requires it.
  • Lead time stated as production time plus transit time, separately.
  • Payment terms, validity period of the price, and the revision policy after approval.

A short checklist for the enquiry email

Measured elevations with finished levels marked · layout type and run lengths · corner conditions named · which elevations are light grey and which are dark grey · door profile, handle detail and finish · colour reference plus a sample request · appliance list with model numbers and installation drawings · glass type, shelf spacing and LED detail for display cabinets · worktop and splashback assumptions · internal storage plan · unit count, delivery address, access constraints and programme dates · the line-by-line format you want quoted back.

How the quote turns into a delivered kitchen

Once the specification is confirmed, the workflow that follows is the one worth agreeing in writing: design and planning against the approved drawings, production with quality control at the factory, packing and container loading for the route you nominated, delivery to the agreed point, then installation and snag inspection before handover. Naming those stages in the enquiry tells the supplier which of them you expect them to own and which your local trades will cover.

Where this fits in a villa or apartment fit-out

Kitchen cabinetry rarely arrives alone on a project. The same enquiry package supports matching wardrobes, media walls, vanities and the interior doors that continue the grey scheme through the rest of the building, which is why project buyers group kitchen, storage and finishes into one coordination round rather than sourcing them separately across several suppliers with different drawing conventions.

SANTERSON has been manufacturing furniture and building materials since 2008 and works as a single supplier across that range — cabinetry, interior fixtures, doors and panelling, lighting, flooring and wall finishes — with custom sizes, internal partitions, panel colours and surface finishes made to the approved drawings. Published Australian project references include villa work in Sydney, Melbourne, Perth, Willoughby and North Turramurra; ask for the case detail that matches your scope rather than reading a project list as a performance record.

Send an enquiry with the drawing package above. Email santerson@qq.com, or reach the team on Phone / WhatsApp +86 13928214007 (PHILLIP). Start from the kitchen cabinets and hotel appliances range or the contact page, and attach elevations with your unit count and delivery address so the first quotation is close to the last.