A high gloss lacquer kitchen is specified, not chosen. The words "high gloss" and a colour name will get you a quotation; they will not get you the doors you pictured. This guide sets out exactly which fields a lacquer cabinet specification must carry, so what arrives on site matches what was approved.

Why the finish name is not a specification

A purchase order that reads "high gloss lacquer doors, white, as per drawing" will pass through a showroom without difficulty and then cause trouble on site. Two suppliers can both honour that sentence and deliver doors that look different side by side: one with a deeper, glass-like reflection, another with a softer sheen; one with a warmer white, another cooler. Neither is wrong. Both simply read the same words differently.

A specification is what removes that gap. For high gloss lacquer cabinets, the document has to carry everything a painterly finish depends on: the substrate, how many coats go on and in what sequence, where the colour is decided, which side of the panel gets the high gloss face, and what both parties will accept as a match when the containers arrive. Our Lacquer Kitchen Cabinet line is built made-to-measure with material and finish options selected per project, so the specification sheet — not a catalogue photograph — is what your quotation is priced against.

The seven fields a lacquer specification must carry

Write these into one page of the schedule, and most disputes disappear before production starts.

1. Substrate and panel thickness

Lacquer is a sprayed finish, so it only performs as well as the board underneath. State the substrate type and the finished thickness of door, carcase and shelf panels separately, because they are frequently different. Density and surface preparation matter more here than for a foil-wrapped door: any flaw in the substrate telegraphs through a high gloss film.

2. Coating system and build

Record primer, colour coats and clear topcoat as separate line items, with the number of passes for each. A three-coat white behaves differently from a five-coat white under kitchen lighting, and it prices differently too. If you are comparing two quotations, compare this field first — it is where cheaper offers quietly shorten the schedule.

3. Colour authority

Name the reference: a RAL code, a supplier colour chip number, or a physical sample you have countersigned. Then state which one governs if they disagree. Screens are never the authority; a signed panel is.

4. Sheen level

"High gloss" describes a family, not a value. Fix the sheen band you expect and say how it will be checked — by sight against an approved sample, or with a measurement at a stated angle. Then name the tolerance you will accept across a run of doors.

Where a project wants a low-reflection look instead, that belongs in the same schedule as a different product line rather than as a footnote on this one. Our matte lacquer cabinets sit in the same Lacquer Kitchen Cabinet collection with their own finish build, so switching sheen means switching specification, not asking a painter to pull back.

5. Face and edge treatment

Decide and record: which faces carry the high gloss film; whether edges are lacquered in the same build or wrapped; and how a cut-to-size panel is finished at the field. Edge detail is the single most common place where a high gloss kitchen looks cheap in photographs afterwards.

6. Hardware interface

Hinge boring, slide fixing, handle or handleless profile, integrated lighting channels — all of these cut into a lacquered face, so they belong on the same sheet as the finish. If you want a handleless high gloss front, note the profile type and the reveal dimension rather than leaving it to the site joiner.

7. Acceptance at delivery

State what will be inspected, on how many panels, against which approved sample, and within what window after arrival. This is the field most often left blank, and it is the one that decides whether a snag conversation is calm or expensive.

Reading the finish family correctly

Lacquer sits alongside several other high-sheen door finishes that get used interchangeably in enquiries. They are not interchangeable on a drawing, and each has its own page in our catalogue so you can specify from the right one:

Finish lineSpecify it when
High gloss lacquer cabinetsThe brief asks for a sprayed, built-up lacquer finish with the coating schedule written into the order.
High gloss acrylic cabinetsA solid sheet face is preferred, with its own flatness and reflection character.
High gloss melamine cabinetsA decorative board face suits the budget and the panel size you are working to.
High gloss wood veneer cabinetsTimber figure must read through the sheen rather than being painted over.
Two tone lacquer cabinetsTwo colours in one run; then each colour needs its own authority and sheen note.
Shaker lacquer cabinetsA framed door in a sprayed finish — routed profiles add their own coating question.
Textured lacquer cabinetsSurface texture is part of the design, so sheen and relief must be specified together.

The same discipline carries over into bedrooms and utility rooms. A high gloss lacquer wardrobe in a matching colour is not automatically the same build as the kitchen door: different panel heights, different edge exposure, often a different coating schedule. Specify it as its own item.

What to attach with the specification

A specification sheet on its own still leaves room for interpretation. Send it together with:

  • Room-by-room elevations with panel identification numbers that match the order lines.
  • The countersigned colour and sheen sample, referenced by code on every affected line.
  • A cutaway or detail note for edge treatment and any reveal or shadow gap.
  • Appliance schedule with the interface dimensions already fixed, so cut-outs are not decided at site.
  • The hardware list, boring pattern and any integrated lighting channel.

Where the scope runs beyond the kitchen into a fuller fit-out, our custom built-in kitchen cabinets are supplied as interior fixtures for hotel, apartment and residential renovation projects, with panel materials, surface finishes and matching hardware — hinges, drawer slide rails, support legs and connecting brackets — listed on the same schedule. That is the practical version of a one-line purchase: cabinetry and its ironmongery arrive described identically.

Where the specification breaks down in practice

Three patterns account for most of the rework we see on sprayed-door projects.

Sheen decided by photograph. A brochure image sets an expectation that the coating schedule then cannot meet at that price. Fix the sheen in words and numbers, not through a picture.

Cut-to-size panels finished on site. A high gloss face can be factory-built; it cannot be reproduced credibly with a spray gun in a completed apartment. Order field cuts to be finished in the same build, or design them out.

Batches signed off separately. Kitchen doors approved in March and wardrobe doors approved in July rarely read as one family. Sign the whole colour group against one sample, at one time, under lighting you have agreed on.

A practical specification template

Copy these lines into your schedule and fill them in before requesting a quotation:

  • Panel item code and room / elevation reference
  • Substrate, finished thickness, density where relevant
  • Coating system: primer coats, colour coats, topcoat passes
  • Colour authority (RAL / chip number / signed sample) and which governs
  • Sheen band, measurement method, acceptable tolerance across the run
  • Faces lacquered, edge treatment, field-cut finishing rule
  • Hardware, boring pattern, handle or handleless profile and reveal
  • Sample approval date, signatory, and inspection window on arrival
  • Packing standard and labelling by panel code for site identification

Send the finished sheet with your elevations and we will price against it line by line, flagging any field where a sprayed finish cannot be built as drawn. Dimensions, finishes and hardware are confirmed per project before production, so the approved sample — not the enquiry wording — is what reaches site.

Frequently asked questions

Can I order a high gloss lacquer door to an existing size?

Yes. The Lacquer Kitchen Cabinet collection is made-to-measure, with layout, finish and dimensions set per project. Send the elevation with panel codes rather than a bare list of widths.

Do wardrobe doors match kitchen doors automatically?

Not automatically. They can be specified to the same colour authority and coating schedule, but panel height, edge exposure and build differ, so they need separate line items and one shared signed sample.

What if I cannot decide between high gloss and matte?

Specify both as separate items in the same schedule and have samples produced side by side under the site's own lighting. Both sit in the Lacquer Kitchen Cabinet collection, so the comparison is a genuine like-for-like.

Who confirms the finish after delivery?

Both parties, against the countersigned sample, inside an inspection window agreed before shipment. Write that window into the order rather than leaving it to the delivery note.