Bronze glass with an aluminium frame reads warm rather than cold, which is why buyers keep coming back to it for bedroom built-ins and wardrobe walls in villas and serviced apartments. The difficulty is rarely the finish itself. It is deciding how many units to order, which sizes each unit should be, and how the frames, glass and internal fittings arrive at site as one coordinated package instead of three separate deliveries that never quite line up.
Start with the elevation drawing, not the room count
A quantity list built from "four bedrooms, so four wardrobes" breaks down the moment a site has a sloping ceiling, a structural column or a doorway that cuts into the wall. Because these are made-to-measure units — sizing, layout and finish are specified per project — the reliable starting point is an elevation of every wall the wardrobe will sit on, marked with finished floor level, ceiling height, the position of switches, skirting, air-conditioning returns and any door swing that has to stay clear.
From those elevations you can count linear metres of wardrobe run instead of counting rooms. Linear metres is what production works to, what the packing list will be organised around, and what your site team can check with a tape measure when the crates land.
Break the order into three quantity layers
Ordering errors on glass-fronted built-ins almost always come from treating the wardrobe as one line item. Split your schedule into three layers and price each of them separately.
- Carcass and frame sets. One entry per opening, with width, height, depth and the frame profile recorded for each. Note which openings are full-height and which stop under a bulkhead.
- Door leaves and glass. Count leaves separately from carcasses, because one wide opening may need three or four sliding leaves while an adjacent narrow one needs two hinged leaves. Record the glass type for every leaf, not just for the unit.
- Internal configuration. Shelves, drawers, hanging rails, trouser racks and integrated lighting are specified per unit. A wardrobe that looks identical from outside can carry a completely different interior, and this is where two identical bedrooms often end up with the wrong fit-out.
Confirm dimensions and the selected specification for each unit before production starts. On multi-unit orders, one transposed width on one elevation is enough to hold up the whole shipment.
Coordinate the finish across the same glass family
Bronze-tinted glass does not read the same against every frame colour and every wall finish, so decide the combination at sample stage. Within our Bronze Glass Aluminum Frame Wardrobes, finish, layout and dimensions are specified to suit each space, which means you can match the frame tone to skirting, door architraves or a nearby Smoked Glass Aluminum Frame Wardrobes run in the dressing area.
Where a project mixes collections — for example glass-fronted bedroom built-ins plus panelled doors elsewhere on the same floor — group the order by collection rather than by floor. Production and packing then follow the same logic as your schedule, and the site team is not sorting through mixed crates to find the right leaves.
Related finishes in the same family are worth listing in the same enquiry so they ship together: Clear Glass Aluminum Frame Wardrobes for darker rooms, and Frosted Glass Aluminum Frame Wardrobes where contents need to stay out of sight.
A quantity schedule that production can actually use
The format below is what we ask project buyers to send. It removes most of the back-and-forth, and it doubles as the receiving checklist on site.
| Column | What to record | Why it matters |
|---|---|---|
| Unit code and room | BR01, BR02, dressing room, plus floor | Every crate carries the same code, so nothing is opened in the wrong apartment |
| Opening size and clear height | Width, height, depth at three points on the wall | Walls are rarely square; three readings expose the out-of-plumb runs |
| Door type and leaf count | Sliding, hinged or open; number of leaves per opening | Leaf count drives track lengths, hardware sets and glass quantity |
| Glass and frame finish | Bronze, smoked, clear or frosted; frame tone | Glass tint is decided per leaf, and re-orders on one unit delay handover |
| Internal fittings | Shelf, drawer and rail counts; lighting points | Keeps identical exteriors from hiding different interiors |
| Delivery sequence | Which units are needed in the first phase | Lets phased sites install room by room instead of storing everything |
Sequence the delivery around the wet trades
Glass-fronted units should not arrive while plastering, painting or flooring is still open on the same floor. Frame them into the programme after the screed has dried, the paint is touched up and the finished floor level is fixed, then allow storage space that keeps crates upright and off the ground. For projects where several trades are being sourced from one supplier, built-in wardrobes sit in the same conversation as built-in furniture such as vanities, tall cabinets and media walls, and coordinating them under one schedule avoids two separate site visits for measurement and installation.
Check quantities against the packing list before unloading
When the shipment arrives, tick the unit codes on the packing list against your schedule rather than counting total crates. Confirm leaf counts per code, check that glass panels are protected and undamaged at the corner edges, and record any shortfall the same day with the unit code attached. Because these wardrobes are made to measure, a missing panel is a new production item — reporting it late is what turns a small gap into a delayed handover.
Common quantity mistakes worth avoiding
- Ordering by room count when one long wall carries two openings and one returns into a corner.
- Assuming all wardrobes on a floor share one depth, then discovering the corridor run is shallower.
- Specifying bronze glass once for the whole project when the sample looks different under the bedroom lighting than in the showroom.
- Leaving internal fittings out of the first enquiry and adding them later as a separate order.
Send us your elevations and we will build the schedule with you
SANTERSON manufactures built-in wardrobes and other furniture and building materials for villa, hospitality and apartment projects, with made-to-measure sizing and finish options on this collection. Send the wall elevations, unit codes and target installation sequence, and we will return a quantity schedule, a specification sheet per unit code and a phased delivery plan you can check at the loading dock.