A swim spa enquiry that arrives with a model number and the words "please quote" usually goes sideways somewhere between the third email and the proforma invoice. The dimensions do not match the pit, the electrical supply on site cannot carry the load, or the jets the buyer assumed were included turn out to be an option. A short, well-structured brief at the start removes all of that. Below is what a manufacturer needs in order to quote Outdoor Swim Spa WS-115AⅣ-U accurately, and why each item matters.
Start With the Model Designation, Not a Picture
Screenshots from a catalogue are ambiguous. In this range the suffix is doing real work: WS-115AⅣ and WS-115AⅣ-U share the same shell size but ship with different equipment sets, different pump counts and different total power. Quote against the exact designation from the product page, and ask the manufacturer to confirm which configuration that designation refers to today. Catalogue specifications move between production runs, so a specification you saved last year is a starting point for a conversation, not an order.
The Baseline Specification to Confirm
For this model, the published catalogue entry gives the following. Put it in your brief as a table and ask the factory to mark each row as included, optional or excluded for your order.
| Item | Catalogue value | What to verify |
|---|---|---|
| Model | WS-115AⅣ-U | Suffix matches your intended configuration |
| Catalog dimensions | 3880 x 2200 x 1250 mm | Shell size versus the cleared space on your slab or in your pit |
| Control system | 1 set | Location of the control panel and access for the operator |
| Water pump | 4 pcs | Pump allocation per jet zone |
| Filter pump | 1 pc | Filtration run time and cartridge or sand media choice |
| Jet total | 23 pcs | Which seats the jets serve, and whether any are adjustable |
| LED lights | 1 pc | Fitting position and colour options |
| Total power | 11.85 kW | Your available supply, breaker size and cable run |
| Features shown | Water jets, LED lighting, Ozone | Whether ozone is included or an add-on in your market |
Two rows deserve particular attention. Total power decides whether your electrician is fitting a standard circuit or speaking to the utility company; a figure around 11.85 kW is not something to discover after the crane has arrived. And the jet total only means anything once you know how those jets are distributed across the seating area, because that determines whether the spa suits hydrotherapy use or a light massage after a swim.
Site Conditions the Factory Cannot Guess
Send these with your first message and the quotation comes back usable rather than provisional.
- Foundation. Confirm the finished slab level, its load rating with water in the shell, and whether the unit sits above ground, semi-recessed or fully recessed. Recessed installations need access panels for pumps and filters.
- Clearance. Give the space around all four sides, not just the footprint. Shell dimensions are not service dimensions.
- Electrical supply. Voltage, phase, available amperage at the panel, and the distance from the panel to the spa. The manufacturer sizes protection and cable to what you tell them.
- Drainage and water fill. Where the overflow and drain line go, and whether the fill is plumbed or a hose connection.
- Climate at the site. A spa used through winter needs different insulation and cover practice than one on a covered terrace.
- Access for delivery. Crane access, gate widths, overhead wires. For door-to-door orders this changes the freight plan and sometimes the packaging.
Options to Decide Before You Order
Catalogue-listed options for this range include control systems, UV sterilisation, additional water pumps, heat pumps, sand filtration, insulation and steps. Availability varies by model, so ask for the option list that applies to your unit rather than assuming a catalogue image reflects your build.
Two decisions change the price more than the others. A heat pump decides whether the spa is usable year-round in a cool climate or only in warm months; specify the target water temperature and the average ambient temperature of the site, not just "heated". Sand filtration versus cartridge filtration changes what your maintenance contractor does every week; both are workable, but pick one deliberately.
If your project calls for a shape outside the standard rectangular shell, that is a different conversation. The Customizable Shape Outdoor Spa covers square, round, oval and curved layouts on an acrylic shell with structural reinforcement. Brief it as a bespoke item: send the room or terrace drawing, the maximum dimensions, and how the spa is meant to be used.
Where This Model Sits in the Range
Before committing, ask the manufacturer to place your shortlist side by side. The WS-115AⅣ uses the same 3880 x 2200 x 1250 mm shell but lists a swim training system, a different pump arrangement and a lower total power figure. Same footprint, different behaviour in use. If lap swimming matters to the client, that comparison is the whole decision; if hydrotherapy seating matters more, the equipment list runs the other way.
Ask for the full Swimming Pools and Swim Spas comparison in writing, with the option list attached to each model. A buyer who compares three configurations at quotation stage almost never changes specification after production starts.
Commercial Terms Worth Pinning Down
- What is included in the quoted price: shell, equipment, cover, steps, insulation, packaging.
- Incoterms and what the seller's freight covers versus what your local agent handles at destination.
- Packaging specification for a spa crossing an ocean, and who insures the cargo in transit.
- Which documents arrive with the shipment: commercial invoice, packing list, certificate of origin, and any import paperwork your market requires.
- Warranty scope by component, and how spare parts for pumps, jets and controls are supplied later.
These are ordinary questions. A manufacturer who answers them in one email is telling you something useful about how the project will run; a vague answer at quotation stage predicts a harder conversation at handover.
A Brief You Can Copy
One page, five minutes of preparation, and the quotation comes back ready to sign. For villa and resort projects where the spa is one line in a larger package, that same discipline applies across the whole order — the Turnkey Villa Furnishing workflow runs consultation, design and planning, production, logistics, installation and after-sales as separate stages, and each stage only works if the specification entering it is fixed in writing.
If you want to talk through a configuration before requesting a price, send the site details above and the exact model designation to SANTERSON through the Custom & OEM Service page, and the factory will confirm what your chosen specification includes for that unit.