A quotation for made-to-measure mahogany wardrobes rarely arrives on the day you ask for it. The delay is almost never about pricing arithmetic; it is about missing information. Every dimension, door type and finish decision changes the amount of solid timber, the joinery method and the packing volume, so a supplier cannot commit to a number until the specification is complete. This guide sets out exactly what to send in your first enquiry if you want an accurate price for Mahogany Solid Wood Wardrobes, and what the supplier will come back to you about afterwards.
Why mahogany wardrobe quotes take longer than modular ones
Modular cabinetry is priced from a fixed set of carcass sizes, so a rough room width is usually enough for an indicative figure. Solid wood wardrobes are the opposite. Doors, frames, drawer fronts and interior panels are cut and machined to the opening you give us, and solid timber has to be selected, dried and acclimatised before cutting begins. A change of one hundred millimetres in height, or a switch from a hinged door to a sliding door, can alter the board list, the hardware set and the number of crates.
That is why our Solid Wood Wardrobes collection, which includes Oak Solid Wood Wardrobes, Walnut Solid Wood Wardrobes and Cherry Solid Wood Wardrobes, is quoted project by project. The finish, layout and dimensions are specified to suit each space, and the price follows from that specification rather than from a catalogue line.
The room data: send drawings before you send photos
Photographs help us understand the atmosphere of a bedroom, but they do not carry dimensions. Start with a simple sketch or an architectural plan that shows:
- The overall width, height and depth of the wardrobe run, measured at several points along each wall rather than once.
- Floor-to-ceiling height, including any skirting, cornice, coving or ceiling bulkhead the unit has to scribe around.
- Position of electrical sockets, light switches, air-conditioning grilles, downlights and wall-mounted televisions that fall inside the wardrobe footprint.
- Door swings, window reveals and radiators within 300 mm of the run, because these decide whether hinged doors can open fully.
- Floor finish and its build-up, since a carpet, tile or engineered board floor changes where the plinth sits and how the carcass is levelled.
- Wall construction, whether stud partition, brick, block or concrete, which determines the fixing method and whether a top panel or scribe is required.
If the wardrobe spans more than one room in a villa or apartment project, list each room separately with its own dimensions. Identical-looking bedrooms frequently differ by tens of millimetres, and one combined drawing hides that problem until installation day.
Layout and interior configuration
The interior is where most of the cost sits, so describe how the wardrobe will actually be used. Hanging space is not interchangeable with shelf space: a rail run uses fewer materials than a bank of drawers, and drawers require runners, drawer sides and a deeper carcass.
| Element | What to specify |
|---|---|
| Hanging zones | Single or double rail; short-hang for shirts and folded items versus long-hang for coats and dresses; whether any section is full height. |
| Shelving | Number of shelves, shelf depth, and whether any shelf carries heavy items such as luggage or boxes. |
| Drawers | Count, width, and soft-close requirement. Drawer banks are the single most quoted interior item, so give a firm number rather than "a few". |
| Doors | Hinged, sliding, folding or open; number of leaves; whether mirrors, glass or panelled fronts are wanted. |
| Specialist items | Trouser racks, jewellery trays, pull-out valet rods, integrated lighting, in-cabinet safes, ironing-board doors, vacuum or laundry niches. |
| End panels | Whether the ends are visible in the room and need a finished return, or are recessed into a niche. |
Where you are unsure, send a rough layout and let us mark it up. Our design team works from your brief through concept, production drawings and confirmation before any board is cut, which keeps changes on paper instead of on site.
Material, grain and finish decisions
Mahogany is specified by species, cut and colour, and each choice has a price consequence. Be explicit about:
- Species and grade. State the mahogany you want, or send a reference sample or an existing piece of joinery to match. If you are open to a comparable species within budget, say so and ask for alternatives with prices side by side.
- Cut and figure. Plain-sawn and quarter-sawn boards read very differently across a wide door; ribbon and flame figures cost more in board yield than straight grain.
- Colour and sheen. Give a target colour name, a paint code, or a physical sample. "Warm brown" means different things to different workshops.
- Panel construction. For classic and Classic Paneled Solid Wood Wardrobes, confirm whether the field panels are solid timber or a panel-and-veneer build, and whether profile mouldings are raised, recessed or shaker.
- Interior finish. Decide whether interiors are finished to match the exterior, left in natural timber, or specified in a lighter tone so contents are easier to see.
- Hardware brand preference. Hinges, runners and sliding systems vary widely in price; name a preferred range or ask us to quote two hardware tiers.
Quantities, programme and destination
A wardrobe for one bedroom and a wardrobe package for twelve units are different manufacturing conversations. Give us the unit count, even an approximate one, because it affects board purchasing, jigging and the packing plan.
Then state the programme: the date the drawings need to be signed off, the date the wardrobes must land on site, and any trade sequence that constrains them. Cabinetry usually has to arrive after wet trades and flooring are complete but before final decoration and soft furnishing.
Finally give the delivery address and who signs for goods. Our Turnkey Solutions service covers freight, export paperwork and door-to-door delivery, so a full site address with contact name lets us quote delivered rather than ex-works, and lets us plan crate sizes around the access available at the site.
Site conditions that change the design, not just the price
Some details look minor but determine whether a built-in wardrobe fits at all. Flag these in your enquiry:
- Lift, stair or doorway dimensions between the delivery point and the bedroom, including turning landings.
- Whether units travel whole or must be assembled in the room.
- Existing skirting and architrave: confirm whether they will be removed behind the unit or scribed around.
- Ambient conditions in the room during installation, particularly whether heating or cooling is running.
- Any adjacent joinery from another trade that has to line up, such as a vanity, bedside niche or matching door set.
For whole-house work, this is also the point at which consolidating cabinetry pays off. Wardrobes, Custom Built-in Kitchen Cabinets, media walls and tall cabinets share timber batches, finish schedules and a single delivery window when they come from one manufacturer, which removes the colour-matching arguments between suppliers.
A ready-to-send enquiry template
Copy this into your email and fill in what you know. Anything left blank we will chase, but a complete sheet usually returns a priced quotation with drawings in one round instead of three.
- Project name, site address and contact person.
- Product reference: Mahogany Solid Wood Wardrobes, or the model you are enquiring about.
- Room-by-room dimensions: width, height, depth, plus the three-point measurement spread.
- Drawing, plan or sketch of each wardrobe run.
- Interior layout per unit: rails, shelves, drawers, specialist items.
- Door type and number of leaves; mirror or glass requirement.
- Species, cut, colour reference and sheen; sample reference if posted.
- Hardware preference or request for two tiers.
- Quantity of units and required delivery date.
- Access notes: lift size, stair width, floor level, who receives goods.
- Related joinery in the same project that must match the finish.
Questions buyers ask us most often
Can you quote from a photograph alone?
We can give a broad indication, but it will carry a wide margin and will not be binding. A photograph shows style; it cannot show height, depth, drawer count or how the unit meets the ceiling.
Do I need final dimensions before you start?
No. We work from your initial brief to produce a design proposal and drawings, then you confirm details against those drawings before production begins. What matters is that the dimensions you send are taken after the floor finish and ceiling finishes are known.
What if my walls are not straight?
Send the variance. Scribes, filler panels and adjustable scribe strips are designed in at the drawing stage when we know the numbers; discovered on site they become a day of cutting and filling.
Can you match an existing wardrobe or door set?
Yes, with a physical sample or a close photograph that includes grain direction and sheen. Species names alone are not enough for a reliable match, because mahogany varies between boards.
Can wardrobes be supplied with the rest of the joinery package?
Yes. Wardrobes sit within our Built-in Furniture range alongside kitchen cabinetry, media walls and storage systems, and are produced under one finish schedule for a project.
Send your enquiry. Include the room drawings, interior layout and finish reference for your mahogany wardrobe run, and we will return a design proposal with priced drawings. SANTERSON is a China-based manufacturer of furniture and building materials serving villa, hospitality and office projects, with custom/OEM production, door-to-door logistics, installation support and after-sales service arranged through one contract.