A product submittal is the document set a buyer, architect or main contractor reviews before approving a swim spa for purchase. For the Outdoor Swim Spa WS-S08CT, an eight-metre configurable unit in our outdoor swim and hydrotherapy range, a complete submittal lets the project team check the shell against the site, price the options correctly and plan power, delivery and installation without rework. The checklist below is what we send when a client asks for approval documentation on this model.
1. Model identification and scope statement
Start with the exact model designation, WS-S08CT, and state which configuration the document set covers. This range is configurable, so a submittal that names only the model number leaves the buyer guessing about what is included. Our submittal lists each item as standard, optional or excluded for the quoted configuration, and repeats the same wording used on the product page so there is no mismatch between marketing material and contract documents.
2. Dimensional drawings and clearances
The catalog lists this model at 8000 x 2400 x 1420 mm overall. The submittal carries a dimensioned drawing of the shell, plus the practical numbers a site team actually needs: access route and lifting clearance to the placement area, working space around the plant for filter and pump servicing, step position, water line height and an allowance for the finished surround or coping. Where the spa sits on a deck, slab or plinth, the submittal states the bearing surface required so the structural engineer can confirm the support before ordering.
3. Equipment schedule with quantities
The captured specification for this model is reproduced below exactly as listed on our site, so the buyer can tick off each line item against their own requirement:
| Item | As listed in the catalog |
|---|---|
| Model | WS-S08CT |
| Catalog dimensions | 8000 x 2400 x 1420 mm |
| Control system | 1 set |
| Swim training system | 1 set |
| Water pump | 1 pc |
| Filter pump | 1 pc |
| Jet total | 35 pcs |
| LED lights | 6 |
| Total power | 8.35 kW |
| Features shown | Water jets, temperature setting, LED lighting, ozone, swim training system |
Jet count and pump count drive the layout of the jet nozzles inside the shell, so the submittal includes a nozzle position sketch. That drawing is what the client uses to check that seating positions, the swim lane and the hydrotherapy zone line up with how the spa will actually be used.
4. Optional accessories priced separately
Catalog-listed options for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Each option in the submittal is shown with its own line, price basis and compatibility note, because availability varies by model. A buyer comparing two quotations can then see whether a heat pump or sand filter was included or left out, rather than assuming parity.
5. Electrical and control information
Total power for this model is listed at 8.35 kW. The submittal gives the connected load so the electrical engineer can size the supply, protective device and cable run, and it flags the points that must be confirmed with our production team before order placement: supply voltage and phase for the destination country, circuit rating, isolation and RCD requirements, control system location and the routing of the cable entry. We do not state local wiring rules on the client's behalf; the submittal hands the load figure to the local engineer and asks them to confirm compliance with the applicable code.
6. Water treatment, heating and insulation
Ozone is shown as a feature of this model, and UV sterilisation, heat pumps and sand filtration appear as options in the range. The submittal describes how the selected treatment set works together, what the filter cycle looks like, and which items need periodic replacement so the operator can budget maintenance from day one. Insulation and cover details are documented here too, since they determine how much energy the spa holds overnight in cooler climates.
7. Finishes, shell materials and visual references
Photographs of the as-built unit accompany the submittal, together with the finish and colour references for the selected configuration. For villa and hospitality projects we normally add a context image showing the spa alongside the swimming pool and swim spa products it will be specified with, so the client can sign off appearance and not only dimensions.
8. Site preparation and installation sequence
A submittal that stops at the product itself creates gaps later. Ours sets out the sequence: bearing surface and drainage prepared by others, delivery route and lifting arrangement, placement, connection of power and water, commissioning of the control system and handover. It states clearly which tasks sit with us and which sit with the local contractor, using the same division of work we apply on our installation and after-sales support projects.
9. Packing, freight and delivery documentation
For cross-border orders the submittal pack is matched to the shipping documents: packing list with crate dimensions and weights, container loading plan, commercial invoice description and the customs paperwork the destination port expects. Our door-to-door delivery service covers freight forwarding by sea, air and rail with customs paperwork handled in coordination with the buyer, so the submittal figures and the shipping figures are drawn from the same source.
10. Warranty, spares and after-sales terms
The final section records the warranty terms for the quoted configuration, the spare parts that wear (seals, filters, lighting and jet components), and the contact route for support. Terms are written out rather than summarised in marketing language, so the client's procurement team can compare them line by line with other suppliers' offers.
How to request the submittal pack
Send us the model reference, destination country and the options you want priced, and we return a submittal set built on that configuration: drawings, equipment schedule, electrical load, option list, finishes, installation sequence and freight data in one file. That single document is usually what turns an enquiry into an approved purchase order.
Specify the WS-S08CT for your project
Tell us the site conditions and the options you need, and we will prepare the submittal documentation for review before any commitment is made.