A wall unit looks simple on a drawing, which is exactly why its quotation goes wrong so often. One line item covers the shelf, and everything that actually makes it stand — fixing method, substrate, finish, hardware, packing — sits outside the price. When you request a quotation for Santerson Wall Mounted Shelves, the useful question is not "how much per metre" but "what exactly is included in this number". The checklist below follows the order we recommend buyers work through, so two quotes from two suppliers can be compared on the same basis instead of on headline price.
Start With the Scope Line, Not the Price Line
Before reading any figure, check what the quotation is actually covering. Custom-built wall shelving is priced as a project item, so the scope statement decides whether the number is complete.
- Made-to-measure or catalogue size. Our wall-mounted shelves are configured per project, so the quote should list your dimensions — width, depth, height and shelf spacing — rather than a standard module size. If it lists a standard size, you are being quoted a different product.
- What sits between the shelves. Back panels, end panels, uprights and infill pieces are frequently optional. A quote that prices only horizontal boards will look cheap until the site drawing shows exposed wall.
- Fixings and support structure. Brackets, hidden rails, cleats and anchor bolts should be named in the packing list. If they are described as "on site" or "by others", your installer carries that cost.
- Wall preparation. Leveling, packing out uneven walls, and locating studs or solid substrate are normally site works. Good practice is to state this explicitly on the quotation so nobody assumes it is included.
Read the Material and Finish Description Word by Word
Two quotations can both say "oak finish" and describe different products. The description needs to name the substrate, the surface, and the edge treatment.
| Field on the quote | What a complete entry looks like | What to query |
|---|---|---|
| Substrate | Board type and thickness for carcass, shelves and panels stated separately | A single generic "board" line covering everything |
| Surface | Veneer, laminate, lacquer or paint, with the reference code from the finish sample you approved | Colour names without a code — names differ between factories |
| Edges | Edge banding material and thickness, or solid timber lipping on visible edges | Edges not mentioned at all; thin edge banding on a shelf front wears quickly |
| Load-bearing spec | Shelf span with the stated deflection limit for that thickness | No span or load note, especially on shelves over roughly 900 mm clear span |
| Hardware | Bracket type, finish and load rating; integrated lighting noted as included or excluded | "Accessories as shown" — photos are not a specification |
If your scheme mixes open shelving with closed storage on the same wall, ask for those items on separate lines. Wall mounted display cabinets carry doors, hinges and interior fittings that open shelves do not, and merging them into one rate hides where the cost actually sits.
Check How Fixing and Installation Are Assigned
This is the section where budget surprises concentrate. A wall-mounted unit transfers its full load into the wall, so the fixing detail depends on the wall you have, not the shelf you bought.
- Substrate confirmation. The quotation should ask what the wall is — masonry, stud partition, timber frame, tile over plasterboard — and state the anchor type proposed for each condition. On a project where substrate varies between rooms, expect more than one fixing detail.
- Who fixes on site. Confirm whether your local tradesperson installs, or whether the supplier's guidance covers it. Our projects include installation and after-sales support as part of the service scope, but the quotation should say which items fall under it for your specific job rather than leaving it implied.
- Tolerance allowance. Ask how the design handles out-of-plumb walls: adjustable brackets, scribed filler panels, or a site survey before manufacture. A quote with no survey line usually means field adjustment on delivery day.
Match the Packaging and Delivery Terms to the Site
Shelving is long, flat and easily chipped at the corners, so packaging detail belongs in the quotation, not in a later email.
- Pack specification. Corner protection, edge boards, moisture barrier and a numbered pack list per unit. Numbered packs let the site team confirm what arrived before signing.
- Delivery terms. State the Incoterms basis, who handles customs clearance, and whether delivery reaches the door or the port. Terms differ by project and should be written on the quote for your shipment.
- Consolidation. If the same order includes floating modular shelves, cabinetry or other fit-out items, ask whether they ship together and how the containers are allocated. Consolidated shipments reduce handling damage but need a clear packing sequence for installation order.
- Spares and touch-up kit. For multi-unit work, ask what spare panels, shelf pins and finish touch-up material come with the delivery.
Compare Three Quotes on One Sheet
Put every supplier's figures into the same table before deciding. Columns worth having: unit rate per linear metre, panel and hardware inclusions, fixing method named, survey included or not, packaging standard, delivery basis, lead time stated as a date rather than a duration, and what happens if a dimension on site differs from drawing.
Questions Worth Asking Before You Sign
Should shelf depth and thickness be quoted together?
Yes. Depth changes the bending load on a shelf, so thickness and span should be confirmed as a pair for each shelf size. Ask for the proposed thickness next to every depth in your layout.
What if my drawing shows a finish you do not stock?
Custom and OEM work covers bespoke finishes, textures and material choices, so a non-standard finish is normally a discussion rather than a rejection. Ask for a physical sample of the proposed match before production, and have the approved sample reference quoted by code.
Do accessories such as shelf lights come pre-wired?
Integrated lighting needs to be specified on the quotation, including cable routes, driver location and where electrical connection stops and your electrician starts. Shelving-related shelving accessories should be listed as separate line items so nothing is assumed.
How are site dimension changes handled after approval?
Ask this in writing before sign-off. The answer should say who measures on site, at what stage a re-measure is possible, and how revised dimensions affect price and lead time.
Send Us the Drawing and We Will Price It Line by Line
If you have a layout drawing, send it over with the wall construction noted for each room. You will receive a quotation that names substrate, finish code, edge treatment, fixing method, packaging and delivery basis as separate items, so you can place it side by side with any other supplier's offer and see what you are actually buying.