A glass corner wardrobe looks simple on a drawing: two runs of cabinetry meeting at an angle, glazed fronts, and a clean line into the ceiling. In production it is one of the least forgiving items in a bedroom fit-out. The angle is rarely a perfect 90 degrees, the glazing has to travel, and any measurement error is locked into the joinery the moment the boards are cut. Before we put your order into manufacturing, here is what we ask project owners, contractors and designers to confirm with us.

1. The corner itself: angle, radius and obstructions

Send us the actual site condition of the corner, not just the plan dimension. What we need to know:

  • The measured angle at the corner. New builds and renovated villas rarely return exactly 90 degrees, and scribing a mitred carcass to an out-of-square wall is a different build from a square one.
  • Whether the run is a true L or includes a return into a niche, doorway or window reveal.
  • Skirting, architraves, cornices, power points and light switches that sit inside the wardrobe envelope, and whether they will be removed or worked around.
  • Ceiling condition: flat slab, dropped ceiling, or a bulkhead. A full-height unit needs to know what it is meeting at the top.

Our Glass Corner Wardrobes are made to measure, so the finished carcass follows the site angle you survey. We just need that angle recorded before cutting, not discovered on installation day.

2. Door type and the clearance it needs

Glazed fronts behave differently depending on how they open, and this decision changes the internal layout as much as the elevation.

  • Hinged doors need swing clearance in front of the unit. In a tight corner this can clash with the bed, an en-suite entry or opposite cabinetry.
  • Sliding doors save floor space but need track depth and an overlap zone at the corner; the diagonal bay itself usually becomes fixed panel work rather than an opening door.
  • Fixed glazed panels with open access suit display wardrobes and boutique-style dressing rooms where the corner is used as a showcase.

If you are weighing options, our Sliding Door Corner Wardrobes and Hinged Door Corner Wardrobes pages show how the same corner carcass is dressed for each opening method.

3. Glass specification and framing

Glazing is where a wardrobe stops being furniture and becomes a building element, so the specification should be agreed in writing:

  • Glass type and tint: clear, bronze, smoked or frosted. Tint changes how much of the interior is visible and how the bedroom reads.
  • Tempering requirement for the project. Tempered safety glass is normally specified for wardrobe doors; confirm what your specifier or authority requires for your project before we order.
  • Framing: slim aluminium frame, timber-matched frame, or frameless with metal profiles. Framing affects door weight, hinge loading and hardware choice.
  • Surface treatment on the reverse face, if a mirrored or back-painted finish is wanted.

Finish examples across our range include Aluminium Frame Glass Wardrobes and frosted or smoked variants, so you can match the glazing to the joinery already specified elsewhere in the project.

4. Internal layout and what the corner actually stores

The dead corner is the classic failure point. Confirm with us:

  • Rail heights, hanging zones for long garments, shelf depths and drawer banks.
  • How the diagonal bay is used: pull-out carousel, angled rail, fixed shelving, or left as display space behind glass.
  • Lighting in the corner bay, plus where the transformer and switch sit and who runs the cable.
  • Anchorage method for the wall type you have, since a full-height glazed unit on plasterboard needs different fixings than one on masonry.

5. Finishes, tolerances and the sign-off drawing

Before production we issue a shop drawing for your countersignature. That drawing is the contract document, and it should record final overall dimensions, corner angle, door layout, glass type and tint, hardware, interior fittings and the finish of the carcass edges and end panels that will be visible in the room. Our Custom & OEM Service covers bespoke material, finish and texture choices, so this is the stage to lock them down rather than raise them later.

6. Packing, freight and installation sequence

Glazed corner units are bulky and fragile, so logistics planning belongs in the order, not after it. Tell us the delivery address, access route and floor level, and whether goods go direct to site or to a consolidation point. We handle furniture logistics and door-to-door delivery by sea, air and rail with the associated paperwork, and confirm glazing pack-out so panels survive the journey. Then agree who installs: our team provides furniture installation and after-sales support on site, or we hand your trade contractor the fixing detail and setting-out drawing.

Pre-production checklist

Site survey of corner angle and obstructions · door type with clearance checked against room layout · glass type, tint and safety specification · internal layout including the diagonal bay · lighting and anchorage detail · signed shop drawing with final dimensions and finishes · delivery access and install party confirmed. Anything still open on that list stays out of production.

Send us your floor plan, elevations and a site photo of the corner, and we will return a made-to-measure proposal for your built-in furniture package. As a one-stop furniture and building materials supplier, we can carry the same specification through cabinetry, glazing, flooring and fixtures on a single order.