An outdoor swim spa is one of the few site elements that combines structural work, wet-area waterproofing, permanent power and a long service life. On Outdoor Swim Spa WS-S06, the catalog already gives project teams a clear starting point: overall dimensions of 5820 × 2220 × 1110 mm, one control system, two water pumps, one filter pump, a jet total of 56 pieces, LED lighting and ozone treatment, plus waterfall and four water columns as shown features. The approval risk is not the model itself but everything that has to be settled around it before the shell reaches site. Below is the confirmation list we ask buyers, architects and main contractors to close out in writing.

1. Confirm which configuration the quotation actually covers

Our swim spa range is configurable, and the same model code can be supplied with different equipment sets. The catalog lists control systems, UV sterilization, additional water pumps, heat pumps, sand filtration, insulation and steps as options for this series. Availability and compatibility vary by model, so a line item that reads simply "WS-S06" tells you very little at handover.

  • Ask for an equipment schedule that names each option included or excluded: heat pump yes or no, sand filtration versus cartridge filtration, insulation package, steps, and the control system specification.
  • Check whether the features shown on the product page — water jets, LED lighting, ozone, waterfall and four water columns — are all in the quoted scope, or whether some are optional upgrades.
  • Get the same schedule for any sibling model under consideration. The WS-S06 family includes variants such as WS-S06B, and pump counts, jet totals and total power differ between them, which changes the electrical and plant-room design.

2. Confirm power supply and electrical coordination

The catalog shows a total power figure of 6.35 kW for WS-S06 in the captured specification, with two water pumps, one filter pump and one control system behind it. Treat that number as the start of an electrical discussion, not the end of it. Total connected load depends on whether a heat pump is included, how the spa is insulated, and what local supply is available on site.

  • Ask us for the wiring diagram, circuit requirements and protection devices for the exact configuration you are ordering, then hand them to your electrical engineer rather than relying on a catalog figure.
  • Confirm supply characteristics with your engineer: phase, voltage and available capacity at the spa location. A heat pump option changes this materially.
  • Agree who supplies and installs the isolator, cabling and protection upstream of the unit, and who is responsible for final connection and commissioning on site.

3. Confirm dimensions, access route and structural support

Catalog dimensions for WS-S06 are 5820 × 2220 × 1110 mm. Those are the shell's external measurements, not the space you need to build around it.

  • Check the delivery route against those dimensions: gate widths, turning radii, lifts, stair cores or crane access for a rooftop terrace. Deck and terrace projects often fail on access, not on the product.
  • Confirm the finished slab or deck build-up, the waterproofing detail at the perimeter, and the drainage arrangement for overflow and maintenance water.
  • Confirm that the supporting structure is designed by your engineer for the filled weight plus occupancy live load. We supply the shell and equipment; structural design and code compliance remain with the project's design team.

4. Confirm operation, maintenance and spares before the order

A swim spa is a piece of plant that runs for years, so the maintenance questions belong in the procurement stage.

  • Ask what water treatment is included — ozone is listed on this model — and whether UV sterilization is added, then confirm the routine service tasks your facility team will own.
  • Confirm spare-parts availability for pumps, jets, control components and lighting, and record the model numbers of installed equipment in the handover file.
  • Ask what installation support and after-sales assistance cover. Our installation and after-sales support service lists on-site installation, inspection and snags, warranty coverage, spare parts and ongoing maintenance; the exact terms for your project should be written into the order.

5. Confirm how the spa fits the wider package and delivery plan

Wet areas rarely sit alone in a villa or resort scope. Poolside loungers, shade structures, paving, wall and ceiling finishes, lighting and bathroom fixtures usually move together, and a swim spa shell that arrives on a different schedule from the deck it sits on creates standing water and rework.

When we supply through one-stop furniture and building materials supply, the swim spa is coordinated with the rest of the fit-out — from outdoor furniture for villas and resorts to bathroom fixtures, lighting and finishes — under a single production and shipment plan. Our logistics service covers freight forwarding by sea, air and rail, customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery; import terms, duties and Incoterms should be agreed case by case for your destination.

Where a project needs a different footprint or seating arrangement, the range also includes customizable-shape outdoor spas in square, round, oval and curved layouts with an acrylic shell, which is often the better answer when the terrace geometry is irregular.

Before approval, request written confirmation of four items: the equipment schedule for the exact configuration, the electrical requirements for that configuration, the delivery route assessment against the 5820 × 2220 × 1110 mm shell, and the warranty and spare-parts terms. If all four are on paper, WS-S06 can be approved without a change order later.

SANTERSON has been manufacturing furniture and building materials in China since 2008 and supplies project packages internationally, including villa and hospitality work in Australia. Send us the model code, your site drawings and the equipment options you want, and we will return a configuration sheet, an electrical requirement sheet and a delivery plan for review.