A pull out corner cabinet is one of the most useful answers to a dead corner in an L-shaped or U-shaped kitchen, and it is also one of the items most easily mis-quoted. The difference between a quotation you can approve on the spot and one that turns into three rounds of revisions usually comes down to what you send the manufacturer before they price it. Below is the information we need from project owners, builders and interior designers, and what each detail changes in the final number.
Start With the Corner Itself, Not the Cabinet
Pull out corner units are made to measure. Their mechanism has to clear the adjacent run of base cabinets, the door swing and any appliance on either side, so a generic size will not produce an accurate price. Before you write to us, record:
- The finished wall-to-wall dimension of the corner, measured after tiling, plastering and any insulation or services are complete.
- Whether the corner is a 90-degree internal angle, an angled end, or part of a L shaped corner cabinet or U shaped corner cabinet run that you also want quoted.
- Finished floor height and the height of the worktop you plan to install, because both set the clear internal height of the unit.
- Obstructions: gas or water pipes, waste stacks, skirting, a window sill returning into the corner, or an oven tower sitting next to it.
- Ceiling height and whether wall cabinets run over the corner, which affects how far a pull-out basket can travel without fouling.
If you have drawings, send the kitchen layout as a PDF or DWG plus photographs of the corner from both directions. A photo showing what currently occupies the space tells our team more in one image than a written description.
Tell Us How the Corner Will Be Used
The internal configuration drives cost more than the carcass does. The same opening can hold different mechanisms, and each behaves differently in daily use:
- Pull-out baskets or shelves that slide the full depth of the corner, so items at the back come out into the room instead of staying hidden.
- Rotating carousels for lazy Susan corner cabinets, which suit pots and pantry goods but need clear headroom above the shelf that swings.
- Open shelving in the corner, where access is simpler but storage depth is not fully used.
- Glass-fronted display corners when the unit faces a living space, as with glass front corner cabinets.
Write down what you intend to store: small appliances, dry goods, pans and lids, cleaning supplies, or a built-in bin and recycling bay. That single sentence lets us specify shelf spacing, load rating and basket depth rather than guessing.
Specify Materials, Finish and Hardware
Our custom built-in kitchen cabinets are supplied with selectable panel materials, surface finishes and matching hardware, so the quotation is only as firm as the specification you give us. For a pull out corner unit, please confirm:
- Carcass and door material, plus the finish — a solid matte colour, a wood-grain laminate or a veneer.
- Door style: flat panel, shaker or handleless, and whether the corner doors match the rest of the kitchen run.
- Hardware expectations: soft-close hinges and drawer runners, load rating for the pull-out mechanism, and whether you want us to supply the hinges, slides, support legs and connecting brackets with the unit.
- Worktop material and thickness if the corner carries a countertop, and whether the sink or hob sits over it.
- Any finish that must match existing joinery on site — send the make and model, a sample, or a colour reference.
Where you have not decided, say so. We will quote two or three options at different price points with the trade-offs written out, which is faster than one specification revised repeatedly.
Send the Project Context
Cabinetry for a single renovated kitchen and cabinetry for a multi-unit development are packaged, shipped and supported differently. In your enquiry, state:
- The project type — private residence, villa, apartment block, serviced apartment or hotel.
- Quantity: one corner unit, or the same detail repeated across several kitchens. Repeat units let us standardise the carcass and reduce cost per set.
- Delivery address and destination port, and the Incoterms you work with.
- Your programme dates — when drawings must be signed off and when the cabinets need to arrive on site.
- Who installs. Our installation and after-sales support can cover site fitting, inspection and snagging, or we can supply flat-packed units with assembly drawings for your own trades.
For enquiries that go beyond a single room, our turnkey project solutions cover cabinetry alongside other interior fixtures, which keeps one supplier accountable for the whole fit-out instead of several.
What You Receive and in What Order
A cabinet enquiry with us follows a fixed sequence, so you always know which stage you are at:
| Stage | What happens | What we need from you |
|---|---|---|
| 1. Brief and quotation | We review dimensions, drawings and specification, then issue an itemised quotation with the assumed scope stated. | Corner measurements, layout drawings, photographs, material preferences, quantity, destination. |
| 2. Detail confirmation | Shop drawings for the corner unit, showing mechanism travel, shelf spacing, door alignment and clearances against neighbouring units. | Written sign-off on the drawings before production starts. |
| 3. Production and QC | Made-to-measure manufacture with inspection before packing. | Nothing further unless we raise a query on a dimension. |
| 4. Shipping and handover | Packing, container loading, freight documents and door-to-door delivery through our logistics and door-to-door delivery service. | Confirmed consignee details and import contact. |
Prices are quoted against the confirmed specification and drawing set. Once drawings are approved, changes to size, finish or mechanism are re-quoted rather than absorbed, which is why the detail stage matters more than the first enquiry.
Questions Buyers Ask Before Requesting a Quote
Can you supply only the corner unit and leave the rest of my kitchen to a local joiner?
Yes. We quote single units as well as full runs. You will need to give us the finished dimensions of the adjoining cabinets so the corner carcass lines up with what your joiner builds.
Which is cheaper for a corner, pull-out baskets or a carousel?
Cost depends on the mechanism and its load rating rather than the layout alone. Send us the opening size and intended use and we will price both configurations so you are comparing like for like.
Do you handle the hardware, or do I source it locally?
Hinges, drawer slides, support legs and brackets can be supplied with the cabinets or omitted if your local supplier provides them. Tell us which, because it changes both the price and the packing list.
I only have a rough floor plan, not finished measurements. Is that enough to start?
It is enough for an indicative figure. A firm quotation needs finished dimensions taken after wet trades are complete, since a 20 mm variation in wall finish changes the mechanism we can specify.
Send your corner dimensions, layout drawings and material preferences to contact SANTERSON, and we will return an itemised quotation for your pull out corner cabinets with the configuration options set out side by side.