A mixed open and closed wall unit is one of the easiest places for a finish decision to go wrong, because the same elevation carries several different surfaces at once. Before production starts on Santerson Mixed Open & Closed Systems, a physical sample review lets you confirm colour, sheen and texture under real site conditions. The steps below follow the order we use on villa and hospitality projects, from the drawings you send to the sign-off that releases production.

Why these units need a sample review

Our mixed open and closed systems are made to the dimensions of the space, with the layout, material and finish specified per project. Open bays show the interior surfaces of the carcass; doors, drawers and end panels present a different face; and any integrated lighting changes how both read in the evening. A catalogue photograph flattens all of that into one image.

Reviewing samples means you judge each surface separately rather than assuming they match. Two finishes from the same range can behave very differently once light falls across a long wall at a shallow angle, and a handleless edge or a shadow gap will expose a colour difference that a small swatch hides.

What you sign off is a sample of a finish, not the finished wall. The purpose of the review is to fix the specification so production has nothing left to interpret.

Step 1: Send the drawings and the finish schedule

Before we quote or prepare samples, send what you already have. A room elevation with overall height, width and depth; a note of which bays stay open and which are closed; and your preferred door style tell us more than a reference photograph. If the unit sits next to flooring, wall panelling or doors from another part of the order, include those too, because these units rarely specify themselves in isolation.

Where the design is still open, our interior design service covers space planning, furniture layouts and 3D renderings, which is a practical way to settle proportions before you commit to finishes. For units built around an existing drawing package, our custom and OEM service handles bespoke material, finish and texture requests along with prototyping.

Step 2: Decide the sample scope before anything is cut

The most common cause of delay is a sample round that covers only one surface. For a mixed unit we suggest requesting one sample for each of these, clearly labelled:

  • The exterior face finish, on the actual board build-up rather than a loose offcut, so the edge treatment can be seen.
  • The interior carcass finish visible inside open bays, which is often lighter or darker than the door face.
  • Any glass, metal frame or profile that appears on closed sections, in its real anodised or coated colour.
  • A hardware sample for handles, pulls or the reveal detail on handleless fronts.
  • The light temperature of any integrated lighting, viewed against the chosen finish rather than on a bench.

Step 3: Review the samples where the unit will stand

Tape the samples to the actual wall at the height they will occupy and look at them three times: morning, afternoon and after dark with the room lighting switched on. This is where most changes are still cheap.

CheckWhat to look for
Colour under site lightWarm downlights push pale greys and creams yellow; cool LED pulls the same finish grey or blue. Choose against your fitting, not a showroom lamp.
Sheen and reflectionHigh gloss fronts bounce lamps and windows across the whole elevation. Matte and textured surfaces hide fingerprints but read heavier on a tall unit.
Grain direction and scaleWood-effect and veneer panels need a decision on vertical or horizontal grain, and on how the pattern lines up between open and closed sections.
Edge and profile detailLook at the sample edge-on. Edge banding, mitred tops and metal frames are where colour matching is most visible up close.
Adjacent materialsSet the sample against your flooring, wall finish and joinery from other parts of the order before you approve anything.

Step 4: Write down what you approved

Verbal approval causes rework. Once a sample is accepted, mark it with the project name, the date and the person signing it off, and keep the physical sample itself. In the email confirmation, list the finish code or reference, the surfaces it applies to, and anything deliberately excluded from that approval.

For units that carry lighting or electrical components, ask us to confirm the electrical specification and compatibility for the chosen configuration at this stage rather than at delivery. The same applies to any dimension that depends on site conditions: our product pages list made-to-measure sizing and finish options, but the final measurements should come from a site check on your side.

Step 5: Confirm the sign-off releases production

Our cooperation steps run from the project brief and design proposal to quotation and detail confirmation, then production, shipment and follow-up. Sample approval belongs to that middle stage: it is the point where details are closed out, and once production starts a finish change normally means new material and a new slot in the schedule.

If your project includes other fit-out items, review their finishes in the same round. Kitchen cabinetry, wardrobes, wall panelling and doors ordered together should be sampled together, so one reviewer sees all of them at once. Our one-stop solution covers material selection and product specification alongside manufacturing and quality control, which keeps those decisions in a single review cycle.

A short checklist for the reviewer

  • All surfaces of the elevation have their own labelled sample, including interior carcass and hardware.
  • Samples were judged on site, at the real height, in daylight and under the room's own lighting.
  • Sheen was compared against neighbouring glass, stone and metal, not only against other boards.
  • Grain direction and panel alignment between open and closed sections are stated in writing.
  • The approved physical sample is retained and referenced by code in the confirmation email.
  • Electrical and site-measured dimensions are confirmed before production is released.

Related products to review alongside these units

Wall systems rarely stop at one item. If the same elevation carries storage with a mix of display and concealed sections, Santerson Mixed Open & Closed Storage is specified the same way, with finish, layout and dimensions set per project. Sampling both together avoids two different greys or two wood tones that look close on a swatch and obvious once installed side by side.

Send us your drawings and finish shortlist, tell us where the unit will stand, and we will prepare the sample set for that review round. After production, our logistics and door-to-door delivery and installation and after-sales support services cover the rest of the handover.

Specifications, dimensions, finishes and electrical details are confirmed for each project configuration; please verify them against your approved drawings before sign-off.