A backlit feature wall looks simple on a drawing: a lit panel, a clean joint, a glow along the ceiling line. In production it is one of the more demanding items in a fit-out, because joinery, lighting and building services all have to agree before the first panel is cut. That is exactly why we ask buyers and designers to settle a short list of points before Santerson Backlit Feature Walls go into manufacturing. The items below are the ones that decide whether a wall arrives ready to install or turns into an expensive site conversation.
1. The opening, not just the panel size
Send us the finished line and floor level of the wall position, together with the exact recess depth you can give up. A backlit wall is a build-up: substrate, aluminium or timber frame, diffuser, light engine, driver housing, plus room for ventilation behind it. Tell us the total projection you will accept, and where the build-up may run into skirting, architraves, door linings or a radiator recess.
- Overall width and height in finished dimensions, and whether the wall runs floor to ceiling or stops at a reveal.
- Recess depth available, and how services behind the panel need to stay accessible.
- Position of sockets, switches, TV mount points, speakers and any cable exits on the elevation.
2. Finish, layout and the details that show up in daylight
Our Media & TV Walls listings are configurable systems: finish, layout and dimensions are specified per project rather than chosen from a fixed catalogue size. That flexibility is useful, but it means the approval drawing has to be specific. The places where a wall reads as cheap are almost always the joints, so we settle them on paper first.
- Panel finish and sheen level, and how it sits with the wall panel systems or cabinetry on the same wall.
- Module widths and the direction of any grain, fluting or stone-look pattern across the elevation.
- Joint type between modules, and how the wall closes onto ceiling, floor and side reveals.
- Whether access panels are needed, and which services they must give access to.
3. Lighting specification: the part that cannot be fixed on site
Lighting is where a backlit wall succeeds or fails after handover. We confirm the electrical specification with your engineer before production, because the driver location, cable route and dimming method all change the frame. Where the wall ties into wider lighting design, we coordinate it with the integrated lighting systems used elsewhere in the project so one control scheme covers both.
- Colour temperature and, where relevant, colour rendering; plus whether a tunable or single fixed tone is required.
- Diffuser type and how evenly the light has to read across the panel, especially on wide runs.
- Dimming protocol and control interface, and where the driver sits for maintenance access.
- Transformer position, cable pulls, and who is responsible for final connection on site.
Before we release your wall to production
- Signed elevation with finished dimensions and module layout.
- Confirmed finish sample reference for the panel face.
- Confirmed lighting specification: temperature, diffuser, dimming, driver location.
- Agreed build-up depth and how the wall meets floor, ceiling and reveals.
- Named electrical responsible party and test requirements for handover.
4. Fixing method and site sequence
Tell us what the wall is going onto: stud partition, masonry, plasterboard over battens, or an existing framed surface. That decides the fixing system and whether a substrate needs to be set out by others before we deliver. We also confirm the installation sequence in relation to wet trades, flooring and final decoration, so panels are not delivered into a dusty, wet programme.
Where acoustic performance matters as well as appearance, Santerson Acoustic Panels in the paneling systems range can be specified alongside the feature wall, so both are detailed on the same set of approval drawings instead of being solved separately by different trades.
5. How it reaches site and who installs it
Panels travel best in a layout that matches the elevation, with the diffuser faces protected and the light engines packed so they can be lifted straight into position. We confirm panel weights against the access route on site, including lifts, stair widths and turning spaces in villas and apartments. Freight, packaging and container loading are arranged as part of our turnkey scope; installation support and after-sales cover are agreed separately per project, so we settle on paper who carries out the final fit.
A backlit wall is approved twice: once when the elevation and finish are signed, and once when the lighting specification is locked. Confirm both before production and the wall installs like any other joinery element.
6. Packaging, spares and handover
We confirm what goes into the handover pack: the approved drawing as-built, the lighting specification for the installed configuration, spare diffuser or panel modules where a project team wants them for future maintenance, and clear labelling that matches the elevation numbers used on site. For villa and hospitality projects ordering several walls, this is also the moment to check that matching modules across rooms were produced from the same batch of finish material.
If you have an elevation ready, send it over with the recess depth and your lighting preference, and we will come back with a build-up proposal and a production-ready specification for review. Our team at SANTERSON can also detail matching Santerson Full Height Media Walls on the same drawings, so storage and illumination are coordinated in one production run.
Dimensions, finish references, lighting components and fixing details are agreed per project on the approval drawing; no single specification applies across the range.