A swim spa quotation is only as good as the information behind it. For Outdoor Swim Spa WS-PC02, a square 3000 x 3000 x 1050 mm unit in our configurable outdoor swim and hydrotherapy range, the difference between a rough estimate and an accurate, production-ready quote comes down to six items: the site conditions, the supply available on site, the equipment you want included, the finish of the shell and cabinet, the delivery and installation scope, and the project paperwork your consultant has specified. This guide walks through each of them, so your first enquiry already carries everything our engineering and sales team needs.
1. Confirm the footprint and how the unit will sit on site
WS-PC02 is cataloged at 3000 x 3000 x 1050 mm, a compact square footprint that suits terraces, villa courtyards, hotel pool decks and resort setbacks where a long lap pool would not fit. Before we quote, send us the plan or a marked-up drawing of the intended location and tell us which installation style you are planning:
- Above ground on a level slab, with steps added at one or more sides.
- Semi-recessed, partly sunk into a deck, with access retained for the pump and filter compartment.
- Fully recessed, with the cabinet surrounded by finished decking and permanent inspection access.
Each option changes the insulation package, the steps, the cabinet enclosure and the amount of on-site civil work. Also confirm the load path to the slab, the clearance you can leave for maintenance, and where the water supply, drain and power will come from. We do not certify local structural or electrical compliance for you, so keep your local engineer in the loop and tell us which country the unit is going to; import rules, duties and delivery terms are handled case by case.
2. State the electrical supply available at the site
The catalog lists WS-PC02 with a total power of 7.35 kW for the standard equipment set: two water pumps, one filter pump and one control system. That figure moves as soon as you add a heat pump or change the jet arrangement, so we need the actual supply at your site: single-phase or three-phase, voltage, frequency and the available circuit capacity. Only then can we confirm the configuration rather than assume it. If an electrician has already specified a dedicated circuit and protection device, attach that schedule to the enquiry.
3. Choose the equipment package instead of accepting the default
The catalog specification for WS-PC02 shows 60 jets, one LED light and ozone treatment as the features presented for this model. Options listed across the range include:
- An additional or upgraded control system.
- UV sterilization alongside the ozone system.
- A heat pump for year-round water temperature, plus insulation for colder climates.
- Sand filtration as an alternative to the standard filter arrangement.
- Steps, in single-side or multi-side layouts.
Tell us which of these you want and which you do not. Availability and compatibility vary by model, so any request outside the options for this model is answered by our engineers rather than assumed by the sales desk; that is precisely what a quotation is for. If your program calls for a different shape or size, our customizable shape outdoor spa covers square, round, oval and curved shells on the same acrylic construction principle.
4. Specify finishes, colors and site joinery
Cabinet cladding, shell color and the way the spa meets the surrounding deck are quotation items, not after-market additions. Send the finish reference or a sample image from your mood board, plus the material of the adjacent decking, so the enclosure detail matches rather than clashes. For hospitality and multi-unit villa schemes, send the full area schedule at once: we manufacture to order under our Custom & OEM Service, and identical units across several villas or guest rooms are quoted as one production batch, which is usually where the real saving sits.
5. Define delivery, installation and after-sales scope
Tell us the destination port or site address and the Incoterms you want to work to. Our logistics and door-to-door delivery service covers freight forwarding by sea, air and rail, packaging and container loading plans, customs paperwork such as commercial invoices, packing lists and certificates of origin, and shipment tracking. For the site itself, state whether you want our team on the ground for installation and commissioning, or whether your local contractor will do it with our guidance drawings. The same applies to spares: name the wear parts you would like shipped with the unit, such as filters, jet components and the control board, so they arrive in the same container instead of as a later order.
6. Attach the project documents that shape the price
A quotation for a single private villa and a quotation for a resort or residential development rarely carry the same paperwork. Depending on your project, send:
- Quantity schedule and phasing, for example one unit now and more units later.
- Drawings or model files if the spa has to appear in coordination models.
- Any test certificates, material declarations or inspection standards your consultant has specified.
- The client approval milestones, so our drawings and detail confirmation land before your deadline rather than after it.
What the catalog lists for WS-PC02
Every figure above is the catalog value for this model. Included equipment, electrical requirements and options vary with the configuration you select, so treat them as a starting point for the quotation and confirm the final specification in writing before production.
How our quotation process runs
The workflow follows the same steps we use on every furnishing and fit-out project: you send the brief, we come back with a proposal and a detailed quotation, then we confirm drawings and specifications with you before production starts. From there it is shipment, site coordination and handover under our installation and after-sales support. Because we act as a single supplier across furniture, interior fixtures and building materials, a spa in a villa or resort package can be quoted and shipped together with the outdoor furniture, wall paneling, lighting and joinery around it: one production schedule, one consolidated container, one point of contact.
Send your WS-PC02 enquiry
Include the site location and installation style, the available electrical supply, the equipment options you want, the finish references, the quantity and phasing, and your target delivery port or address. The more complete that list is, the closer the first number will be to the final one. Reach our team through the contact page, by email at santerson@qq.com, or by phone and WhatsApp on +86-13928214007 (PHILLIP).