A finish sample is the cheapest decision you will make on a fitted bedroom, and it is also the one most often skipped. Once wooden sliding door wardrobes are cut, edged and lacquered, a colour that reads wrong under the room's lighting cannot be corrected without re-manufacturing panels. For project buyers ordering made-to-measure joinery from overseas factories, sample approval is the point where specification risk is removed before it becomes freight cost.

This guide sets out what to request, what to test on site, and how to record an approval so that the panels delivered match the panels you signed off.

Why the Sample Stage Matters More for Sliding Doors Than for Any Other Wardrobe Component

Carcasses are hidden. Shelves, hanging rails and drawer boxes sit behind the opening and never face the room. Sliding panels do the opposite: they are a wall-height surface, usually two or three metres wide, viewed from bed height in daylight and from a doorway under artificial light. A subtle variation in grain openness, sheen level or undertone is invisible on a 100 mm swatch and obvious across a full panel.

Sliding construction adds two more reasons to slow down:

  • Two surfaces are visible at once. Panels overlap on their track, so the edge of one door sits against the face of another. Edge banding, panel thickness and any profile on the panel edge all become part of the finished look.
  • Large flat areas amplify finish faults. Orange peel in a lacquer, an uneven woodgrain print or a directional sheen difference shows up more strongly on a wide sliding panel than on a narrow drawer front.

What to Request From the Factory Before You Approve Anything

Ask for a sample pack that reflects the actual build, not a decorative card. A useful request list looks like this:

ItemWhat it should showWhy it matters
Full finish panelThe declared substrate, the surface material and the declared top finish, at least 200 x 300 mmSmall chips hide texture and grain scale; a larger area lets you read pattern repeat
Edge sample or cut sectionThe panel edge as it will be supplied, including any aluminium or timber profileSliding panels are judged on their edges because the doors overlap
Sheen comparison pairThe same colour in the specified sheen and one step either sideMatt, satin and gloss shift perceived colour; comparing two steps prevents a guess
Grain or pattern direction noteA marked arrow on the sample faceTells you how the supplier will orient the grain across multiple panels
Written specification sheetSubstrate name, surface material, colour code, sheen value, edge treatmentBecomes the reference for inspection when the shipment arrives

Where the design uses more than one surface material, request every combination rather than one representative chip. A two tone sliding door wardrobe that pairs a timber-look panel with a solid-colour return needs both approved, because the contrast between them is the design.

Testing the Samples in the Room Where the Wardrobe Will Stand

Do not evaluate samples at the factory, in your office, or in a showroom with designed lighting. Tape them to the wall of the actual bedroom and leave them for three days.

Check the panels under each light source separately

Walk the room at midday with curtains open, at dusk with only ambient lighting on, and at night with the ceiling fitting and any wood veneer panels or wall finishes nearby. Warm 2700 K lamps pull yellow and red out of a woodgrain; cool downlights flatten it and can turn a warm oak grey. Note which condition dominates the room in daily use, then judge the sample against that condition rather than against an average.

Look at the surface obliquely, not straight on

Hold the panel at a shallow angle to a window or lamp. This is how texture and sheen reveal themselves. Run your hand across the surface as well: a finish that feels dry and open will collect skin oil visibly on a large door, particularly on matte handles and near the point where users push the panel.

Compare against what it has to sit beside

Hold the sample against the flooring, the skirting, the bed frame and any existing joinery. A wardrobe specified in isolation often clashes with a floor already installed. Where the room also uses Santerson wooden sliding doors elsewhere in the scheme, place those samples side by side and confirm the two timber tones are intended to match or to contrast deliberately.

Test a wipe-down

Take a damp cloth with the cleaning agent that will actually be used on site and wipe an inconspicuous corner of the sample, then let it dry. Some open-pored and high-gloss surfaces show streaking or haze after repeated cleaning. On a hotel or serviced-apartment fit-out this test matters more than it does in a private house, because housekeeping wipes these panels daily.

Reading Grain, Sheen and Colour for Consistency Across Panels

A single approved sample does not guarantee a consistent set of doors. Confirm the tolerances in writing:

  • Grain match. For timber-look laminates and veneers, ask how many pattern repeats exist and whether panels will be sequenced so that adjacent doors do not repeat the same figure side by side.
  • Sheen tolerance. Fix a target sheen value and state whether panels outside that band are acceptable. High-gloss surfaces in particular show batch differences at the edges where two doors meet.
  • Colour drift between materials. A lacquered panel, a melamine return and an aluminium frame in the "same" white will never be identical. Agree on site which element is the reference and which may sit slightly lighter or darker.

Practical rule: sign two copies of each approved sample. Keep one in your project file and return one to the factory with your written approval, dated and countersigned. The returned copy is what production and final inspection are measured against.

Recording the Approval So It Survives the Production Run

Write the approval as a short instruction sheet rather than an email thread, and attach it to the order:

  • Sample reference code, finish name and physical sample attached or retained
  • Panel size and orientation for each opening, with grain direction marked
  • Edge treatment and frame or profile colour, confirmed against a physical piece
  • Sheen value and acceptable tolerance band
  • Items explicitly excluded from the approval, such as internal decor or hardware finish
  • Date of approval and the name of the person who approved it

This record is also what you use when goods arrive. Pull one panel from each pallet in a multi-panel order, lay the panels face up together, and compare them against the retained sample under daylight before any of them go on a track. Panels that fail the comparison are far cheaper to handle at that point than after installation.

How a Made-to-Measure Supplier Should Handle Sample Approval

Our wardrobe range is specified per project rather than chosen from fixed sizes: finish, layout and dimensions are set for each opening, and the Sliding Door Wardrobes collection covers timber-look, matte, high-gloss, mirror and glass panel options. That flexibility only pays off if the sample stage is used properly.

As a custom furniture manufacturer working on villa and hospitality projects, we send physical finish samples for approval before panels enter production, confirm dimensions and selected specifications against the site drawings, and keep the approved sample as the inspection reference for the finished order. Where a project needs prototype panels or a first-article check on a new finish, that is arranged in the same pre-production stage.

Send us your bedroom elevations and finish shortlist. We will return physical samples with a written specification sheet so you can test them on site before production starts — from design and sampling through to delivery, installation support and after-sales service.

Contact SANTERSON: PHILLIP  |  Phone / WhatsApp +86-13928214007  |  Email santerson@qq.com  |  Enquire