An outdoor swim spa is specified, not ordered off a shelf. The shell, the jets, the controls and the electrical load all have to agree with each other before the unit reaches site. That is why projects usually reach the model Outdoor Swim Spa WS-PC07ST-S through an OEM or custom sourcing route rather than a catalogue order. This article walks through what that route involves, stage by stage, using this 7-metre swim spa as the working example.
What OEM sourcing means in practice
OEM (original equipment manufacturer) sourcing means a factory builds to the buyer's specification and, where agreed, under the buyer's brand, instead of the buyer taking a pre-set product under the maker's name. For a swim spa this matters because one model number can cover several different build sheets: one buyer needs a heat pump and insulation for a cool climate, another wants an automatic cover, a third only wants the base hydrotherapy package with a different jet count.
Our Custom & OEM Service covers custom design and prototyping, bespoke material finishes, OEM manufacturing, flexible minimum order quantities and brand customisation such as logos and packaging. A swim spa order follows the same logic: the shell geometry stays close to a proven model, while the equipment set around it is configured for the buyer.
Reading the WS-PC07ST-S specification
The catalogue entry for this model gives a starting point that both sides can quote against:
| Item | Catalogue value |
|---|---|
| Model | WS-PC07ST-S |
| Catalogue dimensions | 7000 × 2400 × 1470 mm |
| Control system | 1 set |
| Swim training system | 1 set |
| Filter pump | 1 pc |
| Jet total | 6 pcs |
| LED lights | 4 |
| Total power | 6.55 kW |
| Features shown | Water jets, LED lighting, Ozone, Swim training system, Automatic cover option |
Two things in that table deserve attention before a purchase order is signed off. The water pump is not listed for this model in the catalogue specification, and the automatic cover appears as an option rather than standard equipment. Both are the kind of line item an OEM configuration sheet resolves and a product page does not.
Catalogue-listed options across the range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so each option is confirmed against the selected configuration rather than assumed.
The sourcing stages, in order
1. Brief and site conditions. The buyer states the installation setting (terrace, garden, deck or an in-ground recess), the local supply voltage, the available power capacity and how the unit will be accessed for maintenance. A 7000 mm long shell needs a clear delivery route as much as it needs a clear pool deck.
2. Configuration sheet. Instead of a model number alone, both sides work from a line-by-line sheet: shell and seating layout, jet count and placement, swim training unit, filtration route (cartridge or sand), ozone or UV sterilisation, heat pump and insulation level, lighting quantity, cover type and control interface. Anything the catalogue marks as optional is either ticked or crossed out at this stage.
3. Branding and documentation. For OEM orders this is where private labelling comes in: nameplate, control panel marking, packaging and the paperwork set that accompanies the shipment. Our Logistics & Door-to-Door Delivery service covers freight forwarding by sea, air and rail, customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery.
4. Production and inspection. The shell is built to the agreed configuration, then checked before despatch: fill test, jet and swim training operation, control function and a leak check on the plumbing runs. Inspection records and photographs go to the buyer before packing.
5. Delivery and after-sales. Crating and container loading are planned around the shell dimensions, then Installation & After-sales Support covers on-site installation, inspection and snags, warranty coverage, spare parts and ongoing maintenance.
Where the swim spa sits in a wider project
Most of these units are not bought on their own. On villa and resort projects the water feature is specified alongside outdoor furniture for villas and resorts, such as loungers, daybeds and shaded pergolas around the deck, and sometimes alongside interior fit-out work including bathrooms, lighting and wall finishes. Sourcing the swim spa from the same one-stop furniture and building materials supplier keeps the deck furniture, the water feature and the adjoining interior under one coordination team and one shipment plan.
Where a 7-metre rectangular shell does not suit the plot, closely related variants sit alongside it in the same range: WS-PC07ST keeps the 7000 × 2400 × 1470 mm shell without the automatic cover option, while WS-PC07ST-L extends the length to 7490 mm at the same width and depth. The range also includes a Customizable Shape Outdoor Spa that supports square, round, oval and curved configurations, plus longer layouts such as the Long Outdoor Swim Spa with Hydrotherapy & Relaxation Pool, which pairs a swimming channel with a separate hydrotherapy area.
Questions worth putting in writing
- Which pumps are included in the quoted price, and which appear on the option list?
- What supply voltage, phase and circuit capacity does the confirmed configuration require, given a catalogue total power figure of 6.55 kW?
- Is the automatic cover mechanical or manual, and is it fitted at the factory or on site?
- How are the six jets distributed between the swim zone and the hydrotherapy zone?
- What insulation and heat pump combination is specified for the destination climate?
- Which spares ship with the unit, and how are replacement pumps, jets and controls supplied later?
Specification note: the dimensions, jet counts and power figures quoted above are taken from the catalogue entry for WS-PC07ST-S. Equipment included in a specific order is confirmed on the configuration sheet before production, since options vary by model and market.