A swim spa submittal is the package a buyer reviews before releasing an order: it sets out what is being supplied, what the site has to provide, and what will be inspected at handover. For buyers comparing our Outdoor Swim Spa WS-S08T1 / WS-S08T2 on a villa terrace or resort garden, the difference between a usable submittal and a marketing PDF is whether it answers the questions the contractor, the electrician and the client will actually ask. Below is the checklist we work to when preparing that package for this model pair.
1. Model identification and configuration sheet
The listing covers two model codes in one page, so the first item in a submittal must state which code is being quoted and what distinguishes it from the other. A single line saying "WS-S08 series" leaves the buyer unable to check dimensions, jet layout or power against their drawings. Ask for a configuration sheet that names the model code, the shell colour and finish options, and every option added or removed from the standard build, so the quotation, the packing list and the nameplate on the delivered unit all refer to the same item.
2. Shell dimensions and site clearance
Catalogue dimensions for this model pair are 7800 × 2200 × 1500 mm (length × width × depth). A submittal should repeat those figures together with the access route, not just the footprint: a spa of that length has to pass through gates, around corners and onto a slab or deck that can carry a water-filled shell. Include the working space needed for the pump and filter compartment, and state whether steps are part of the supply or provided locally.
3. Equipment list with quantities
Quantities matter more than feature names here, because they drive the electrical load, the plumbing rough-in and the maintenance plan. The catalogue specification for WS-S08T1 / WS-S08T2 reads as follows.
| Item | Catalogue quantity | Why the buyer needs it |
|---|---|---|
| Control system | 1 set | Determines how jets, heating and lighting are operated and where the controller is mounted. |
| Swim training system | 1 set | Defines the swim lane end of the shell and the flow it produces. |
| Water pump | 2 pcs | Drives jet circuits; affects circuit sizing and noise position. |
| Filter pump | 1 pc | Sets the filtration cycle and the service access required. |
| Jet total | 50 pcs | Shows the hydrotherapy layout for client sign-off. |
| LED lights / small LED lights | 4 pcs / 28 pcs | Confirms the lighting scheme and low-voltage wiring points. |
| Total power | 9.55 kW | The figure the electrical engineer designs the supply and protection around. |
If a submittal lists features without quantities, the buyer cannot tell whether 50 jets or 20 are included, and cannot brief the electrician. Treat the power figure as a starting point for local design: supply arrangement, breaker rating and cable size are set by the electrician in the destination country, not by our catalogue sheet.
4. Optional accessories stated as included or excluded
Catalogue-listed options for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so the submittal should split these into three columns: fitted as standard, added in this quotation, and not supplied. A buyer comparing two suppliers finds that a lower price often means a heat pump or insulation pack has quietly moved to the "not supplied" column.
5. Related models for comparison
Where a project needs a different length or jet count, we usually issue two submittals side by side rather than one vague document. The Outdoor Swim Spa WS-S08T1 / WS-S08T2 page carries the full catalogue entry for this pair. Nearby options in the same range include the Outdoor Swim Spa WS-S08M, listed at 8020 × 2260 × 1280 mm with a different jet count and power figure, and the Customizable Shape Outdoor Spa for projects that need a square, round, oval or curved shell instead of a standard rectangular one. Comparing specification sheets, not photographs, is how the right model gets selected.
6. Manufacturing, logistics and site support documents
A swim spa rarely arrives alone on a project. Alongside the product sheet, ask for the production schedule and QC records from the factory; packing list and container loading plan, so the crane or forklift arrangement can be planned; shipping documents including commercial invoice, packing list and certificate of origin; and installation guidance covering setting-out, levelling, connection points and commissioning. Our logistics and door-to-door delivery service covers freight booking and paperwork, while the service pages describe how design coordination, production and site support fit together. Warranty terms and response arrangements should be written into the submittal as they apply to your order, not assumed from website marketing copy.
7. Handover checklist for the site team
- Model code on the delivered nameplate matches the approved configuration sheet.
- Pump, filter, jet and lighting quantities match the approved list.
- Electrical supply, protection and earthing installed by the local licensed electrician to their national requirements.
- Drainage, access cover and service clearance left as drawn.
- Commissioning run completed, with control settings recorded and spare-parts contact confirmed.