An open wardrobe with clean lines and no doors can make a bedroom feel larger and calmer, but it is also one of the easiest items to get wrong. Because nothing hides the storage, every dimension, shelf height and edge detail shows. A useful quotation request therefore sends the factory the same information an installer would need on site: accurate openings, a clear internal layout, the finish you expect, and how the unit has to reach the room.

Why open wardrobe pricing moves more than it looks

A minimalist open wardrobe is made to measure for each project, so the price follows the work rather than a fixed catalogue size. Three things usually drive the difference between two quotations that look similar on paper:

  • Board and finish. The same footprint costs differently depending on the board material and the surface you choose, from a flat matte laminate to lacquered or wood-veneer panels. Finish also decides how visible fingerprints, dust and edge wear will be in daily use.
  • Internal layout. Hanging rails, drawers, shelves, shoe rows and lighting provisions are all separate work items. A layout with many drawer zones is not comparable to one built mostly from fixed shelving.
  • Delivery route and site conditions. A floor-to-ceiling unit made in several sections for a city apartment is packaged and handled differently from a compact single-body unit, and the freight terms you buy affect what happens at your door.

Ask any supplier to quote against a written specification instead of a photo, and the numbers become comparable.

The five items to send with your enquiry

1. Measured drawings of the space

Send width, height and depth at three points each, because walls and floors are rarely square. Mark skirting boards, architraves, doors and the direction they swing, radiators or pipes, light switches, power outlets, ceiling beams and any recess. Note the finished floor level and whether tiling or flooring is still to be laid, since that changes the height the unit must be built to.

2. Your internal layout, room by room

List what has to live in the wardrobe: long hanging for coats and dresses, double rails, folded shelves, drawers for knitwear, space for bags or luggage, an ironing position, a vacuum bay. If you are furnishing several bedrooms, say which layout belongs to which room; a master bedroom and a guest room rarely need the same internals.

3. Material and finish choices

Name the board type, panel thickness, edge treatment and colour or grain you want, and say whether the carcass should match the visible fronts or be a plainer interior board. For open systems, edges and back panels are on display, so ask how they are finished. If you need the wardrobe to sit with other joinery in the project, send the reference for that finish as well.

4. Access, quantities and programme

Give the delivery address, lift or stair dimensions, parking restrictions, and the number of units per size. State your required site date, not just a vague season. Importers buying for villa or apartment projects should also state the Incoterms they want quoted, so freight, insurance and customs handling are visible rather than assumed.

5. The scope you expect the supplier to cover

Decide early whether you need drawings checked against your own design, production only, or a coordinated package that also covers other built-in furniture and finishes for the same building. Grouping related items with one one-stop solution provider usually means fewer interfaces to manage on site, but it only helps if the quotation states what is included.

A checklist you can paste into your enquiry

ItemWhat to state
Project typeVilla, apartment, hotel room, guest house; new build or renovation
QuantitiesNumber of units, grouped by size and layout
DimensionsWidth, height, depth measured at three points; finished floor level confirmed
ConstraintsSkirting, beams, outlets, doors, recesses, ceiling height variation
InternalsRail lengths, shelf count and spacing, drawer numbers, accessory positions
FinishBoard material, panel thickness, colour or grain, edge and back panel detail
DeliveryAddress, lift or stair access, required site date, preferred Incoterms
After the saleSpares policy for hinges, rails and drawer runners; who carries out installation

How to read the quotation you get back

A serious quotation is a specification document. Before comparing prices, check that each line states the unit dimensions, the board and finish, the internal configuration, the section split for transport, the packaging standard, and what happens at delivery. Then confirm three practical points in writing:

  • Whether measurements come from your drawings or from a site survey by your own trades, and who pays if the two disagree.
  • Which stage produces an approval drawing, and what changes are still possible after you sign it.
  • What installation and after-sales support covers: assembly on site, adjustment, snag lists, and replacement of hardware such as rails, brackets and drawer runners.

If you are also buying wardrobes in other styles for the same project — a closed open walk-in wardrobe for the master bedroom, or wall-mounted storage for a second room — ask for those to be quoted on the same board and finish schedule. Matching materials across rooms is cheaper than matching them later.

Questions worth asking before you commit

  • How deep is the hanging area, and will long garments clear the base?
  • Can shelf heights be adjusted after installation, or are they fixed?
  • Is the back panel visible from any angle, and how is it trimmed?
  • What load rating do the shelves carry, and where do supports sit?
  • How many sections will the unit arrive in, and what is the largest single piece through my access route?

Prices, lead times and freight terms are quoted per project. Treat any figure you receive as valid only for the specification, quantities and delivery address stated on it, and re-confirm before placing a second order.

Send your drawings with this checklist: measured openings at three points, finished floor level, the internal layout for each room, board and finish references, quantities by size, access restrictions and your required site date. SANTERSON manufactures made-to-measure wardrobes and other built-in furniture for villa, apartment and hotel projects, and replies to enquiries with a specification-based quotation rather than a catalogue price.