Corner units are the part of a bathroom fit-out that most often gets ordered last and specified least carefully. A Santerson Corner Storage unit sits inside our Storage Units collection for residential bathroom projects, and because it is made to measure rather than picked off a shelf, the buying decision looks nothing like choosing a standard cabinet. This guide walks through what the product actually covers, which decisions you need to lock down before an order is placed, and what we will ask you for when you send us an enquiry.
What Santerson Corner Storage Is
The unit is a configurable corner storage piece intended for residential bathroom projects. Three things define it: made-to-measure sizing, selectable materials and finishes, and a layout that can be specified to suit the room rather than adapted to it. There is no single fixed width or height published as a universal specification, because the dimensions are produced around the space they are going into.
That distinction matters when you compare prices. Two corner units quoted at different figures may not be comparable at all if one is a standard size and the other is built to your drawing. When you request a quotation from us, we quote against your dimensions and finish selection, so the number reflects what will actually be installed.
Where A Made-to-Measure Corner Unit Earns Its Place
Corner positions in bathrooms are awkward for a reason: two walls meeting at 90 degrees, often with a door swing, a basin run or a shower enclosure cutting into the usable line. A purpose-built corner unit fills that footprint to the actual wall dimensions and keeps the clearances you need.
- Ensuite bathrooms in villas. Floor area is usually tight, and the corner beside or opposite the vanity is often the only wall left for storage. A made-to-measure unit uses it fully instead of leaving a filler gap.
- Family bathrooms carrying daily volume. Towels, bath products and linens need closed storage that stays tidy; the layout can be split between closed compartments and open bays according to who uses the room.
- Guest and powder rooms in project work. Where several units repeat across a development, specifying one configuration once keeps every bathroom consistent without hunting for matching retail pieces.
For whole-projects, corner storage is normally ordered as part of the wider bathroom package rather than on its own. Pairing it with Santerson Drawer Units keeps deep items in drawers at reachable heights and leaves the corner volume for taller or awkward stock, and where display matters, Santerson Open Storage can carry folded towels and accessories on the same finish palette.
The Decisions You Have To Make Before Ordering
A made-to-measure order moves faster when the following are settled in writing. These are the points we will come back to you on.
| Decision | What To Fix Before The Order |
|---|---|
| Dimensions | Overall height, width along each wall, and depth. Note obstructions: skirting, pipework, door swing, mirror or light position. |
| Layout | How the interior is divided — closed compartments, open bays, adjustable shelves — and which items go in each zone. |
| Material and finish | Board material and surface finish chosen to sit with the vanity, wall panelling and cabinetry already specified for the room. |
| Interface with neighbours | How the unit meets the basin, countertop or adjacent cabinet, so the join detail is decided rather than improvised on site. |
| Hardware and fitting | Handle style, hinge and runner selection, and who carries out installation — our team on site or your local contractor. |
A note on specifications
We do not publish one universal set of dimensions, material grades or hardware part numbers for this product line, because each unit is built to the project. Anything you need in a specification sheet — board construction, finish system, load figures, fitting requirements — we confirm against your selected configuration before production starts. Ask for it in writing and we will send it with the quotation.
How The Order Runs From Enquiry To Installation
Because this is a custom product, the buying path follows our project workflow rather than a catalogue checkout. It starts with your brief and drawings: room dimensions, the configuration you want, and the finishes already chosen for the space. From there we return a quotation with the details confirmed, then move into production once the specification is signed off.
For buyers coordinating more than the storage unit itself, this is where ordering through a one-stop furniture and building materials supplier saves administrative work. Vanities, mirror cabinets, wall-mounted cabinets, tall cabinets, lighting and the surrounding finishes can be specified together, so finish matching is handled inside one production programme instead of being reconciled between unrelated vendors. If you want that scope, our turnkey interior project solutions cover design and planning, production, logistics, installation and after-sales as a single engagement.
Freight is arranged by sea, air or rail with the customs paperwork handled on our side, and delivery runs door to door. On arrival, installation, inspection of snags and after-sales support are part of the service. Confirm the delivery address, import terms and fitting arrangements for your specific project when you request the quotation.
Five Questions Worth Asking Us Directly
Can I match the corner unit to cabinetry already in the room?
Yes. Finish and material are selectable, so send us the vanity or cabinet reference you are working with and we will specify against it.
What if my walls are not square?
That is precisely the case made-to-measure sizing exists for. Give us the measured dimensions at both ends of each wall run, and the unit is built to those figures rather than forced into a standard size.
Can I order one unit, or is there a project minimum?
Single-unit orders are possible, and repeat quantities across multiple bathrooms can be ordered together. Tell us the quantity you need and we will confirm how it is handled.
Does the price include fitting?
Scope depends on the engagement you choose. State clearly whether you want supply only or supply with installation, and the quotation will reflect that scope.
Before You Send The Enquiry
- Measured dimensions for the corner, including both wall runs and the available depth.
- A sketch or layout showing intended internal divisions and what will be stored where.
- Finish reference from the vanity, cabinetry or wall panelling already specified.
- Quantity — one unit or a repeated specification across several bathrooms.
- Delivery location and your preference on supply only versus installation.
Corner storage rarely wins attention in a bathroom specification, which is exactly why it causes problems later. Fix the dimensions, layout and finish before the order goes into production, and the unit disappears into the room as it should. Send us your drawing and finish reference and we will come back with a quotation built to your configuration.
SANTERSON — China-based manufacturer and one-stop supplier of furniture and building materials for villa, hospitality and office projects, operating since 2008. Enquiries: PHILLIP, +86-13928214007 (phone/WhatsApp), santerson@qq.com.