A wardrobe order is finished the moment the last door is aligned and the room can be handed over, not when the panels leave the factory. For villa and apartment projects in Australia, the gap between production sign-off and a clean handover is where most wardrobe problems appear: wrong site levels, missing access, damaged edges, doors that no longer close. This guide walks through how we plan delivery and installation for textured melamine wardrobes, what we need from the site team, and where your own crew fits in.
What makes built-in wardrobes a coordination job
Our textured melamine wardrobe range is made to measure. Each order is produced to the dimensions, layout and finish selected for that specific space, which means the carcasses, doors and internal fittings arrive cut to a fixed set of numbers. Unlike loose furniture, nothing can be trimmed on site to fit. A wall that moves 15 mm out of plumb, or a floor build-up that was not accounted for, turns an accurate drawing into an inaccurate installation.
Because the panels are decorative on both faces and the edges are machined, they also need careful handling from container to room. Stacking, packing, trolley routes and door widths all matter before a single screw goes in. That is why we treat delivery and installation as one continuous plan rather than two separate stages.
Stage 1: Locking down the site conditions before production starts
Production cannot begin on numbers that may still move. Before we release a wardrobe order for manufacture, we confirm with the project team:
- Finished floor and ceiling levels. We need the final height of the floor build-up, screed or flooring, plus the finished ceiling line, so carcass heights are set to the completed room rather than the slab.
- Wall condition and squareness. Whether walls are framed, plastered and packed, or still to be lined. Out-of-plumb and uneven walls change scribe allowances and sometimes the layout itself.
- Service routes. Positions of power points, switches, downlights, air-conditioning grilles, bulkheads and skirting that must be avoided or cut around.
- Access route from kerb to room. Lift dimensions, stair widths, corridor turns, door openings and any restricted delivery hours for the building.
- Who does what on site. A clear split between our scope and the builder's: who sets out, who supplies packing and protection, who connects lighting if the wardrobe includes it.
We ask for this information in writing against the same drawing set that will be signed off. When a level or wall detail changes after production has started, we log it as a variation and reissue the affected panels instead of asking the installer to solve it on the day.
Stage 2: Sequencing the wardrobes into the programme
Wardrobes sit late in the fit-out sequence, and that position has to be protected in the programme. Our usual rule is simple: the room must be complete before the panels arrive.
- Painting, flooring, skirting and ceiling work finished and dry.
- Wet trades closed out for that area, so no plaster or paint work continues around new panels.
- Site clean completed, with dust down. Cutting and sanding elsewhere in the building is scheduled away from installation days.
- Storage available on site. Panels should not sit in an open, unroofed or damp area overnight.
We build our production lead time backwards from your target install date, then add a buffer for port clearance and inland transport. For multi-unit work we schedule by apartment or floor rather than delivering everything at once, so the site only has to hold what can be installed that week.
Stage 3: Packaging, freight and arrival checks
Decorative melamine panels travel best when they are supported flat, edged protected and kept dry. Our standard practice for wardrobe consignments:
- Panels bundled by room and marked with the same reference used on the approved drawing, so installers never sort by eye.
- Edge protection and corner guards on visible faces; hardware and runners packed separately in labelled boxes.
- Flat packing on pallets with a rigid outer case, sized to the delivery route we were told about at order stage.
- Documentation prepared for customs: commercial invoice, packing list and origin paperwork issued with the shipment.
We ask your site contact to check each pallet on arrival, before the crew is released to unpack: count against the packing list, look for crushed corners and punctured cases, photograph any damage on the outer packaging and the panel itself, and note it on the delivery paperwork. Claims move much faster when damage is recorded at the point of handover rather than after the panels are in the room.
Stage 4: Installation planning on site
Before unloading, we walk the access route and confirm the plan with whoever is working on site. A short pre-install meeting prevents most of the avoidable failures:
| Item to confirm | Why it matters |
|---|---|
| Load path from truck to room | Panels are long and awkward; a tight lift or stair turn can rule out a layout that was drawn for that room. |
| Set-out lines marked on floor and wall | Fixings, scribes and door clearances follow the marked line, so levels must be confirmed before fixing begins. |
| Fixing method against the wall build-up | Framed, brick and rendered walls take different fixings and packers; the wrong choice shows up later as movement. |
| Door swing and clearance | Sliding tracks need level runs, hinged doors need clearance from handles, skirting and adjacent cabinetry. |
| Sequence of internal fittings | Shelves, drawers and rails are installed after carcass alignment so the frame is not pushed out of square. |
For larger jobs we provide on-site guidance during the first units, then your trades continue with the same method. For smaller orders the site crew installs to our drawings with remote support from us.
Stage 5: Handover checklist and snagging
We close out a wardrobe installation against a written list, signed off by both sides. The items we check:
- Carcasses level, plumb and securely fixed, with no movement when the doors are used.
- Doors aligned top to bottom, gaps even, no binding on opening or closing.
- Sliding panels running freely along the full track length, bumpers and guides fitted.
- Edges and visible faces free of chips and marks; any protective film removed and the room left clean.
- Drawers, rails, shelves and any integrated lighting installed as per the approved layout and working.
- Spare hardware and adjustment parts handed over with a record of what was supplied.
Snags are logged with photographs and closed on an agreed date. Anything that needs a replacement panel goes back to the factory as a reissue, with the site told when it will land rather than left waiting.
Where projects usually go wrong
- Levels confirmed too late. Flooring decided after the wardrobe drawing is signed. Fix: one combined drawing showing finished floor, skirting and carcass base.
- Delivery ahead of readiness. Panels arrive into an active wet trade area with nowhere dry to store them. Fix: install date agreed first, delivery scheduled against it.
- No named site contact. Nobody on site owns the set-out or the access plan. Fix: one person signs off the pre-install meeting.
- Damage recorded after unpacking. No evidence at handover, so responsibility is unclear. Fix: inspect and photograph at the point of delivery.
If you are specifying built-in storage for a villa or multi-unit project, send us the room drawings with finished floor and ceiling levels marked, plus your intended install window. We will confirm what is fixed on site and what we handle: production, packing, freight to your address and installation support — so the programme has one clear sequence instead of three assumptions.