The catalogue page for Outdoor Swim Spa WS-S38 gives you a footprint, a pump count and a power figure. It does not tell you which of those items are fixed and which can be changed to suit your site. Before a swim spa enters production, the specification has to be agreed line by line, because the equipment you choose determines the electrical supply, the delivery method and the way the unit performs once it is installed. The list below follows the order we work through with project buyers, dealers and villa owners, and each item is something you can put in writing before an order is confirmed.
What the WS-S38 catalogue page already fixes
Treat the published numbers as a reference specification rather than a final configuration. For the WS-S38, the site lists a shell of 3760 x 2080 x 1110 mm, one control system, three water pumps, one filter pump, 51 jets with six water columns, four LED lights with twelve small LED lights, and total power of 14.05 kW. The features shown on that page are water jets, LED lighting, ozone and a waterfall.
Two details in that table matter more than they look. A swim training system is not listed for this model, so if the end user wants continuous swimming against a current, that has to be raised as a question rather than assumed; other models in our range, such as Outdoor Swim Spa WS-SP600, are listed with a swim training system on their specification table. The total power figure also moves once options are added or removed, so the electrical drawing should only be issued after the equipment list is frozen.
Water treatment and hygiene package
Ozone appears in the WS-S38 feature list. Alongside it, our swim spa catalogue also lists UV sterilisation and sand filtration as options on this range. The decision to put in front of a buyer is simple: what will the maintenance routine actually look like for whoever owns the unit?
- Keep the ozone treatment as listed, with manual dosing by the owner or by a service contractor.
- Add UV sterilisation as a second treatment stage, where the buyer wants it and is willing to pay for it.
- Add sand filtration, where the buyer prefers backwash-based filtering and has the plant space and drainage for it.
Ask who will dose and clean the unit after handover. In a hotel, spa or gym that is an in-house team on a written schedule; in a private villa it is often the owner. The answer decides how much automation is worth specifying.
Heating, insulation and the running-cost conversation
Heat pumps and insulation are both listed as options on this range. This is where a specification usually goes wrong: the unit is quoted with the base equipment only, and the owner then finds the energy use high in a cool climate or during shoulder season.
- Heat pump sizing against the target water temperature and the local winter, not against a generic figure.
- Insulation grade for the shell and cabinet, which matters most where the spa sits outdoors year-round.
- Whether an existing electrical supply can carry the combined load of pumps, heating and lighting, or whether a dedicated circuit has to be added.
Send us the climate zone and the intended water temperature with your enquiry, and we will confirm which equipment combination matches them for this model before the order is confirmed.
Jets, water columns and the waterfall
The WS-S38 is listed with 51 jets and six water columns, plus a waterfall feature. Jet count is not a quality score by itself; what matters to the end user is where the jets sit and what they are aimed at. Worth confirming in writing:
- Jet layout against the seating and lounging positions inside the shell, so the massage hits shoulders and lower back rather than empty water.
- How many of the six water columns the buyer wants kept, since each one changes the pump load behind the published power figure.
- Waterfall position and whether it discharges into the spa itself or into a deck-edge channel, which affects the surrounding finish.
Lighting and controls
Four LED lights with twelve small LED lights are shown for this model. Colour options and where the fixtures sit can be agreed at order stage. The control system is listed as one set; confirm whether the buyer wants it mounted on the cabinet edge or in a protected position away from direct splash and sun.
Access, cabinet finish and site interface
Steps are listed as an option for this range, and they are worth specifying rather than buying later, because step height has to match the finished deck level. The same catalogue lists insulation among the options, so settle the insulation package and the cabinet finish together; other spa designs in our range use wood-look cabinets or stainless steel frames for outdoor installation.
Also settle, early, how the unit reaches its final position. A 3760 mm shell has to clear gates, screens and door openings, and a crane or long delivery route changes the cost. Tell us the access route with your order, not after the spa arrives at the gate.
Electrical, base and drainage
This is the part that stalls projects most often. Before production we need to know:
- Supply voltage and phase available at the site, and the dedicated circuit arrangement for the agreed equipment list.
- The load-bearing base or plinth, level and finished to the spa's footprint.
- Drainage and overflow route, plus access space for the filter pump and any plant that needs servicing.
Local building, electrical and pool regulations differ by country and by council. The buyer or their local contractor is responsible for obtaining approvals and for confirming compliance on site; we supply the equipment data sheets and connection requirements your local engineer needs for that process.
How this fits a wider project order
Swim spas are rarely ordered alone. On villa and resort work they arrive alongside outdoor furniture, bathroom fixtures and interior finishes, and coordinating them under one order removes a great deal of duplicated communication. As a one-stop furniture and building materials supplier, we handle the swim spa together with the surrounding outdoor furniture and the interior fixtures for the same building, on one set of drawings and one shipment plan.
If the specification needs to go further than catalogue options, our custom and OEM service covers bespoke sizing and finishes across product ranges. Where a project needs a non-standard footprint, spa products such as the Customizable Shape Outdoor Spa show how far shape and size can be taken for gardens, terraces and leisure areas.
Getting freight and installation right
A spa is heavy freight: an acrylic shell, cabinet panels and electrical assemblies have to be protected in transit and planned as one crate set. Our logistics and door-to-door delivery service covers global freight forwarding by sea, air and rail, packaging and container loading, customs paperwork and shipment tracking to the site address. After arrival, our installation and after-sales support covers on-site installation, inspection and snag lists, warranty coverage, spare parts and ongoing maintenance.
Order the spares you will genuinely need with the unit: jet inserts, LED modules, seals and filter elements take up little space in the container, whereas a small replacement shipment arranged later costs far more per part.
A short checklist to send with your enquiry
| Access | Delivery address, gate widths, route to final position, crane needed or not |
| Water treatment | Ozone as listed; UV sterilisation and sand filtration wanted or not |
| Heating | Target water temperature, climate zone, heat pump option, insulation grade |
| Hydrotherapy | Jet layout review, number of water columns, waterfall position |
| Lighting and controls | LED count and colour choice, control system mounting position |
| Electrical | Voltage and phase, dedicated circuit, confirmed total load for the final equipment list |
| Base and drainage | Plinth detail, drainage route, service access to pumps and filter |
| Cabinet and steps | Cabinet finish for the intended outdoor exposure, step type and height against finished deck level |
| Spares | Consumables and wear parts to ship with the unit |
The dimensions, pump counts, jet totals and power figures for WS-S38 are the values published on its catalogue page. Because options change the equipment set and therefore the electrical load, confirm the included equipment and electrical requirements for the configuration you order before any site work begins.
If you are specifying an outdoor swim spa for a villa, resort or wellness facility, send us the model reference, your site drawings and the checklist above. Our team will return a confirmed equipment list with the matching electrical requirements, so production and site preparation can run in parallel instead of waiting on each other. More configurations are listed under Swimming Pools and Swim Spas.