A freestanding cabinet looks simple on a drawing and complicated on site. It has to fit an opening that is rarely square, match finishes already specified elsewhere in the project, survive daily use by people who were not consulted in the specification, and arrive in one crate with the right hardware inside. The checklist below follows the order we actually work in when a buyer specifies a Santerson freestanding cabinet or a bathroom storage unit from the same family: use first, then size, then materials, then internals, then services, then paperwork.

1. Use case: display or storage?

Santerson publishes freestanding cabinets under more than one collection, and the collections are not interchangeable. The Display Cabinets entry covers residential living projects, where the cabinet carries objects, glassware and lighting. The Storage Units entry covers residential bathroom projects, where the same format has to work around a basin, a countertop and damp air. Both pages describe made-to-measure sizing with selectable materials and finishes, so the specification conversation starts with what the unit must do, not with what it looks like.

Write down the room before you look at any finish sample. A living-room display cabinet and an ensuite storage unit will end up with different boards, different edge treatment, different drawer runners and different ventilation, even when they share a door profile. Buying from the wrong collection is the most common and most expensive mistake on this product line.

2. Dimensions: what to measure before you enquire

Because sizing is project-specific, an enquiry that contains only a length will come back with more questions. Send the following and the first quotation round is usually enough:

  • Overall height, width and depth you want, plus the maximum the space allows in each direction.
  • Floor-to-ceiling height at the exact position, measured at two points on the wall. Older villas and renovated properties are rarely consistent.
  • Skirting boards, architraves, radiators, door swings and light switches within 300 mm of the unit.
  • The thickness of the finished floor build-up, which changes a flush-to-floor design by centimetres if the flooring is ordered after the cabinet.
  • Any fixed appliance, basin, tapware or waste outlet the cabinet must clear, with its centre-line dimension from the wall and from the side wall.

For a bathroom unit, add the position of the water supply and the waste. For a display unit placed against a wall that carries a socket or a switch, say so: a cabinet that covers an access point becomes a variation order later.

3. Materials and finish

Santerson's catalogue spans melamine, lacquer, acrylic, veneer and wood-veneer surfaces across its cabinet ranges, and the same visual result can be produced with different board make-ups underneath. Two things decide which is appropriate rather than which is preferred:

  • Exposure. A bathroom unit sits near showers, towels and cleaning products. Ask explicitly which substrate and which edge sealing are proposed for that environment before approving a colour.
  • Consistency with the rest of the joinery. If the cabinet has to match kitchen cabinetry, wardrobes or wall panelling on the same project, specify the finish reference once and reuse it across every item rather than describing the colour in words.

Request a physical sample of the door front, the carcass edge and the interior surface. Photographs under studio lighting are not a basis for approving a finish on a project where several trades have to match.

4. Internals: doors, drawers, shelves and glass

The internal layout is where a freestanding cabinet earns or wastes its space. Decide the storage mix per item type, not per cabinet:

What you storeLayout that works
Glassware, ornaments, collectiblesGlass front or glazed door with shelving at variable pitch; consider integrated lighting in the integrated cabinet lighting range so items are lit rather than shadowed.
Linen, toiletries, cleaning suppliesDeep drawers with a pull-out hamper or divided top drawer; closed doors to keep the visual field calm.
Books, media, equipmentMixed open and closed shelving so cables and boxes can be hidden while display items stay reachable.
Bathroom consumables in quantityDrawer units with a shallow top drawer for small items; avoid fixed shelves at a pitch that wastes half the height.

Specify hardware by name: runner type, soft-close or not, hinge style, handle or handleless edge pull, and whether the handles are supplied with the unit or sourced locally. For a matching set across several rooms, confirm that one hardware specification covers all of them.

5. Coordination with the rest of the fit-out

A freestanding cabinet in a villa or hospitality project rarely stands alone; it sits beside vanities, tall cabinets, panelling and doors that were specified together. Santerson's custom and OEM service covers bespoke finishes, textures and prototyping, which is the route to take when the cabinet must match existing joinery rather than pick from a standard option list.

Three coordination points come up repeatedly:

  • Sequence with flooring and wall finishes. Confirm whether the cabinet sits on the finished floor or on the sub-floor, and who is responsible for the gap detail.
  • Electrical and plumbing first fix. Internal lighting, sockets behind a display unit and supply lines behind a bathroom unit all need to be shown before the carcass is built.
  • Finish references in one place. Keep a single schedule listing every cabinet, its finish code and its room, so substitutions are visible rather than discovered on site.

6. Logistics, installation and after-sales

Santerson describes door-to-door logistics including freight forwarding by sea, air and rail, customs documentation, packaging and container loading, with installation and after-sales support covering on-site fitting, inspection and spare parts. For a made-to-measure cabinet those services matter more than for a stock item: flat-pack dimensions decide whether the unit fits through the doorway it is destined for, and packaging decides what arrives intact.

Ask, in writing, for the packing list with carton dimensions and weights before shipment, the delivery terms that apply to your address, and who performs the on-site fitting. Import terms, duties, transit time and installation availability differ by country and by building, so treat published service descriptions as a starting point for your own quotation rather than as an assumed level of service.

7. Documentation to receive before you approve production

  • A dimensioned drawing of the unit showing overall size, door and drawer layout, and clearance for handles and doors in the open position.
  • The material and finish schedule: substrate, surface material, finish code, edge treatment, hardware make and model.
  • Confirmation of how the unit is fixed or restrained, and what preparation the wall or floor needs.
  • A written statement of what is included in the price and what is carried by others on site.

Production should not start until the drawing is signed. On a made-to-measure item, an approved drawing is the document that protects both sides when something on site turns out to be different from the survey.

Buying checklist at a glance

Checklist itemReady when
Use and collectionYou have confirmed whether the unit belongs with display cabinets or bathroom storage units.
SurveyTwo-point measurements, floor build-up and fixed services are recorded.
FinishA physical sample has been approved against the surrounding joinery.
InternalsDrawer, shelf and door layout is set per stored item, hardware named.
CoordinationFirst-fix electrical and plumbing, flooring sequence and finish schedule are agreed.
LogisticsCarton sizes, delivery terms and fitting responsibility are confirmed in writing.
ApprovalA signed dimensioned drawing exists before production begins.

If your project needs a cabinet sized to an existing opening and matched to joinery already on site, send the survey dimensions and the finish reference together. That is where SANTERSON as a furniture and building materials supplier adds value: one specification covering the cabinet, the surrounding fit-out and the delivery that brings them to the same door.

Frequently asked questions

Are these cabinets supplied assembled or flat-packed?

Both approaches are possible for made-to-measure work, and the right choice depends on access at the delivery point and on how many units travel together. Confirm it with your quotation; carton dimensions decide whether a built-up unit fits through the corridor it must pass.

Can a bathroom freestanding cabinet match my kitchen cabinetry?

Matching is possible where the same finish system can be applied to a substrate suited to a humid room. Ask for that combination specifically rather than assuming a colour name carries across both environments.

What information speeds up a quotation?

Room and use, the six dimensions listed in section two, an approved finish reference, and the internal layout you want. A drawing request follows from that; a price without those details is only an estimate.