A made-to-measure sliding door looks simple on a drawing and still causes the most rework on site, because the people who approve it rarely look at the same information. This guide sets out who signs off what for Santerson Wooden Sliding Doors, and in which order, so that a villa or apartment package does not stall at the opening.
Why the approval chain matters more than the door itself
Sliding doors sit at the junction of three trades: the wall that carries the track, the joinery that finishes the reveal, and the floor that sets the running height. Change one decision after production has started and you change the others with it. That is why we ask project owners to treat approvals as a sequence rather than a single signature.
Our sliding door listings are configurable rather than fixed catalogue items. The published configuration options for this range are made-to-measure sizing, material and finish options, and a layout tailored to the project. Every dimension and specification is confirmed per project before manufacture, which means an approval that arrives late does not just delay delivery — it restarts the drawing cycle.
Who signs what: the five roles in the chain
On residential and fit-out projects we normally see five decision-makers attached to a sliding door package. Naming them before the first drawing is issued prevents the most common dispute, which is not about design but about who had authority to change it.
| Role | What they approve | When it must be signed |
|---|---|---|
| Client or asset owner | Overall look, door count per opening, budget envelope | Before drawings are prepared for manufacture |
| Architect or interior designer | Finish, panel layout, relationship to wall finishes and skirting | At design development, then again on the shop drawing |
| Main contractor or site foreman | Opening sizes, floor levels, track support, wall build-up, sequence with plasterboard and flooring | Before the wall is closed up |
| Procurement or quantity surveyor | Order quantities, packaging and container plan, delivery address split by unit | At purchase order, before production scheduling |
| End user or facilities manager | Day-to-day operation, handle choice, cleaning and maintenance access | Before the final finish is locked in |
Rule of thumb: one named approver per question. If two people can change the opening width, the drawing will change twice.
Stage 1 — Design approval: agree the layout before the size
Design sign-off should settle the questions that are expensive to reverse, not the ones a site team can adjust later. For a wooden sliding door, those questions are:
- Which wall the panel runs against. A sliding panel needs a clear run of finished wall. Furniture, radiators and deep reveals have to be shown on the drawing the client signs.
- Single panel or paired panels, and which side the stack lands on once the room is furnished.
- Surface and edge treatment — whether the door reads as a designed element or disappears into the wall. Where a flush, minimal look is the goal, Santerson Flush Sliding Doors are specified on the same made-to-measure basis and can be approved alongside the standard sliding range.
- Consistency with adjacent joinery. Where a bedroom wall also carries storage, matching the door to Wooden Sliding Door Wardrobes keeps one panel language across the room.
- Whole-room continuity. On whole-house packages the door is usually approved together with panelling and built-in storage, so it should be reviewed in that context rather than as a standalone item. Where a wall also needs sliding panels for display or concealed storage, Wooden Sliding Panels are drawn and approved on the same sheet as the door.
- Where a sliding leaf cannot work. Some openings are too narrow for a panel to stack, or the adjacent wall is already occupied. Wood veneer pocket doors take the panel into the wall cavity instead, and are approved on the same made-to-measure basis — but the cavity and frame need signing off before the wall is built.
Practical point for the approver: ask to see the door in the room elevation, not as a detached panel image. Most design objections disappear or become obvious at that stage instead of after delivery.
Stage 2 — Technical approval: the site conditions that decide feasibility
This is the stage where approvals fail most often, because it belongs to the contractor and is frequently left until the walls are already closed. The items below need a signature from the person who controls the site programme.
- Floor finish build-up. Track height and door clearance depend on the finished floor level, not the structural slab. Confirm the floor make-up before the size is fixed.
- Wall structure behind the track. Timber stud, steel stud or masonry each take fixings differently. Whoever approves the wall build-up must confirm it can carry the track and the door weight.
- Square and plumb openings. Made-to-measure panels are built to the dimensions supplied. If the opening is out of square, that tolerance has to be resolved on site or accepted in writing.
- Ceiling height and panel drop. Full-height panels need clear vertical run; a bulkhead or service run changes the order.
- Wall face alignment. If the door should sit flush with the finished wall rather than proud of it, that decision belongs to the plasterboard stage. The same wall-alignment logic applies where an opening also needs a hinged leaf in the same line; flush hinged doors are drawn together with the sliding leaves so both sit on one finished plane.
- Threshold and cleaning line. Decide who maintains the track and how, before the detail is fixed — this is where facilities input earns its place in the chain.
For openings that also act as room dividers, Santerson Partition Sliding Systems are the version to review at this stage, since track, hardware and opening dimensions all need confirming together. Acoustic performance is not a fixed figure across the range, so if a partition has to absorb sound, raise that with us before design sign-off so the configuration is settled in one pass.
Stage 3 — Procurement approval: quantities, packaging and delivery split
Procurement approvals are administrative but they decide whether the doors arrive usable. On multi-unit projects we ask for the order to be confirmed per unit or per floor, with a named receiving address for each drop.
- Order by opening, not by type. Label each schedule line with the room and opening reference so that site teams can match panel to position without guessing.
- Confirm the delivery split early. Doors for an occupied building and doors for a shell-and-core fit-out rarely go to the same place on the same date. Our logistics and door-to-door delivery service covers freight by sea, air and rail, packaging and container loading, customs paperwork and tracking, so the receiving plan needs to be fixed before the container is packed.
- Freeze the schedule after sign-off. Late additions of single doors are the most expensive change on a sliding package, because each opening has its own dimensions.
Stage 4 — Production and sample approval
Between drawings and manufacture sits one more signature: the finish. Wood tones and veneers read differently at door scale than on a small swatch, and a large panel surface shows grain direction and sheen far more clearly than a cabinet door does.
- Approve the finish at a representative size and view it in the actual room light where the door will hang.
- Check grain direction against the adjacent joinery, especially where doors, wardrobes and panelling are ordered together from customised furniture packages.
- Record the approved finish in writing with the drawing number it belongs to, so the site team and the factory are working from the same reference.
If a project needs its own specification rather than an existing option — bespoke dimensions, a particular surface treatment, or hardware coordinated with other ironmongery — our custom and OEM service covers custom design and prototyping alongside material and finish selection. Agree that scope before production starts, not as a variation.
Stage 5 — Installation and handover approval
The final signature is the one that closes the package. Sliding doors should be inspected for smooth travel, alignment with the wall face, secure track fixings and clean reveals, at the point where the surrounding finishes are complete.
- Book installation after wet trades and flooring are finished, so the door is set to the real completed level.
- Walk the openings with the same people who approved them, marking any snag against the drawing reference rather than a room name.
- Confirm the finish again at completion. A sliding panel is easiest to judge against the wall once the surrounding paint or panelling is done; if the approved tone was recorded in writing, that record settles any dispute on the spot.
- Hand over the maintenance note for track cleaning and hardware adjustment together with the keys, so it reaches the person who will actually do the work.
Our installation and after-sales support service covers on-site installation, inspection and snagging, spare parts and ongoing maintenance. On projects where our team sets the doors, ask that the site representative signs off each opening as it is completed — a single handover sheet per unit prevents arguments about what was accepted.
The approval pack: five documents that keep the chain honest
Across villa and apartment projects, one consistent set of documents does more to protect the programme than any amount of email. We suggest keeping these five items, each with a named approver and a date:
- Door schedule — one line per opening, with room reference, panel count and stack direction.
- Elevations — the door shown in the room, with finished floor level marked.
- Finish sheet — approved surface, sheen and grain direction, referenced to the drawing number.
- Site condition confirmation — wall build-up, track support and opening tolerances signed by the contractor.
- Handover sheet — per-opening inspection result and maintenance note acknowledgement.
If a change touches any of these five, it goes back to the person who signed that line. It sounds slow at the start of a project and is dramatically faster than resolving the same change on site with the wall already closed.
Common approval failures, and what they cost
A few patterns repeat often enough to be worth checking against your own process:
- Size confirmed before the floor build-up. The panel arrives either short or dragging. Fix: no dimension is frozen until finished floor level is signed.
- Design approver and site approver are the same person, at different times. Site conditions override a design decision nobody recorded. Fix: separate signatures for design and site conditions.
- Doors approved as an isolated item on a whole-house package. Finish mismatch with wardrobes and panelling appears only after installation. Fix: approve doors inside the joinery drawing set.
- Delivery address agreed at container loading. Panels for different units land in one place and have to be redistributed at cost. Fix: receiving plan confirmed at purchase order.
- Finish approved on a small sample. The tone reads differently across a full-height panel, and the mismatch is only visible after installation. Fix: approve at representative size, then re-check at handover against the written record.
Working with Santerson on a sliding door package
We supply made-to-measure doors and joinery for villa, apartment and hospitality projects, from survey and drawings through production, delivery and installation. Send us the room elevations you already have and we will return a door schedule with the dimensions, track detail and finish references your approvers need to sign in one pass.
Browse the full range under windows and doors. To see how sliding doors, panelling and built-in storage are coordinated as one drawing set on completed homes, review our whole house custom cabinetry project and the wider project cases, which include villa work in Sydney, Melbourne, Perth and Willoughby.
Send us your door schedule
Share the openings, finished floor levels and wall build-up for your project, and we will prepare a made-to-measure sliding door proposal with the drawings your stakeholders need to approve. Talk to PHILLIP about your package and delivery plan.