A made-to-measure LED mirror cabinet is specified, not simply ordered. The difference between a quotation that holds and one that keeps moving is the quality of the information you hand over on day one. Below is the practical sequence we follow with architects, builders, bathroom renovators and furniture resellers, together with exactly what to send so the price you receive matches the cabinet that arrives.
Why an LED mirror cabinet needs a written specification
Mirror cabinets sit in the one bathroom zone where three trades meet: the tiler, the electrician and the joiner. The cabinet hangs on a wall that carries a mirror-fronted door, houses a light source, stores items at humidity levels no bedroom furniture ever sees, and has to line up with a basin, a tap and often a vanity light. Buying a fixed-size unit forces the room to accept the product. Specifying it lets the product follow the room.
Our mirror cabinet range is built around project-specific dimensions and finish options. Alongside the LED model, we produce a standard mirror cabinet, a tall mirror cabinet for full-height storage next to a doorway, and a round mirror cabinet where a soft outline is preferred over a rectangular one. The quotation process is the same for all of them, so the checklist below applies whether you are pricing one ensuite or a whole villa floor.
Information to have ready before you ask for a price
Send these six items in your first message and we can usually return an itemised quotation without another round of questions. If something is missing, we will say so rather than guess it.
| Item | What to provide | Why it changes the price |
|---|---|---|
| Opening and clearances | Finished wall width and height of the mirror zone, depth available from the finished wall face, position of the basin centre line and tap outlet. | Sets carcass width, depth and door swing; deep cabinets need different hinge and shelf arrangements. |
| Mounting condition | Wall build-up (brick, stud and lining, tiled substrate), where solid fixing is possible, and whether the unit butts into a corner or a niche. | Determines batten, bracket and packing detail, and whether a scribe or filler panel is required. |
| Electrical arrangement | Where the supply terminates, whether the switch is on the cabinet, on the wall or a sensor, and who provides connection on site. | Changes driver placement, cable routing and the choice of switch hardware. |
| Interior layout | Number of shelves, drawer or open shelf preference, socket or no socket inside, tall items such as bottles or styling tools to be stored. | Adjustable shelving, drawers and mirror-backed interiors each carry their own cost line. |
| Finish | Cabinet colour or woodgrain, mirror edge treatment, handle or handleless front, and any matching vanity or wall panel to coordinate with. | Custom finishes and matched grain are made to order rather than picked from stock. |
| Quantity and destination | Units per bathroom type, total count across the project, delivery address and preferred Incoterms. | Bulk counts change unit pricing and make shared container loading worthwhile. |
Sending the enquiry
Email santerson@qq.com, or reach us on WhatsApp at +86-13928214007 (attention: Phillip), with the subject line naming the project and the bathroom type. A floor plan sketch, a marked-up elevation and two photographs of the wall in its current state are worth more than any amount of written description. If you have a mood board or an existing vanity photograph, attach it; matching an existing finish is far easier from a photo taken in daylight than from a colour name.
If your enquiry covers more than the cabinet - vanities, basins, showers, vanity lighting, cabinetry or flooring - send it as one enquiry. As a one-stop furniture and building materials supplier we price those items together, which keeps the finishes consistent across the project and reduces the number of separate deliveries you have to receive.
What the first quotation should contain
Ask us for an itemised quotation, not a single figure. A usable quotation sets out:
- Cabinet dimensions in millimetres, stated as width by height by depth, with the finished-wall reference noted.
- Board and front material, finish system and mirror specification, including any demisting pad where one has been requested.
- Lighting detail as it will be supplied, with the electrical parameters to be confirmed against your local supply and circuit arrangement.
- Interior configuration: shelf count and positions, drawer boxes, internal socket if specified.
- Packaging method and fixing kit included with each unit.
- Unit price, tooling or set-up charges if any, packing list by carton, and the delivery terms you asked for.
Read the electrical line carefully. Lighting specification is confirmed project by project, and the figure on a quotation is only as good as the circuit information behind it. If your electrician has a preference for driver location or switching method, put that in writing before production starts.
Confirming details before production
Once the quotation matches your budget, we move to detail confirmation: drawings for sign-off, finish samples where a colour or grain decision is still open, and a written record of every dimension that has been checked against site conditions. This is also the point at which changes are cheap. After production starts, a width change means rebuilding a carcass.
Where a project calls for something outside the standard configurations - an unusual recess, a curved front, branding on the packaging, or a cabinet built to someone else's drawing - that is what our custom furniture manufacturer service covers, from design and prototyping through to material and finish selection. Send us the drawing and we will tell you plainly which parts of it can be made and which need rethinking.
Delivery, installation and what happens after
Mirror cabinets travel with the rest of your order. Freight can move by sea, air or rail with customs paperwork handled on our side, and logistics and door-to-door delivery means the cartons arrive at the project address rather than a port. Each unit ships with its fixing kit and an installation sheet; where a project needs it, we provide installation and after-sales support, including site inspection and spare parts for later replacement.
For larger projects, coordination matters more than any single product. Our turnkey interior project solutions run through consultation, design and planning, production, logistics, installation and after-sales, so the mirror cabinet is scheduled alongside the vanities, tiles and lighting rather than ordered last and hoped for.
Common reasons a quotation has to be reissued
- Tiles not accounted for. A dimension taken off a bare wall is wrong by the thickness of the adhesive and tile on every side.
- Switch position left open. Cabinet-mounted, wall-mounted and sensor switching each route the cable differently.
- Depth conflict with the tap or basin. A deeper cabinet can foul a tall vessel basin or a high-arc mixer.
- Finish named loosely. "Matte grey" means several different products; request a sample or quote by our finish reference.
- Quantity split across phases. Ordering one bathroom now and the rest later costs more per unit and risks a finish mismatch between batches.