A swim spa is one of the few site-supplied products where a vague enquiry costs everyone time. The shell, the plant and the electrical supply all have to agree with each other before the unit reaches the ground. If your enquiry only says "about a ten-metre swim spa", the quotation that comes back will not match what your architect drew or what your electrician can actually connect. This guide uses Outdoor Swim Spa WS-130BⅫ to show how a buyer, contractor or procurement consultant should write the specification sheet, so that the price you approve and the machine you receive are the same product.
Why the line items matter more than the model number
Outdoor swim spas in this range are configurable. The shell is standard, but pumps, jets, lighting, water treatment, heating and insulation are selected project by project. Two units under the same family name can therefore differ in jet count, installed power and price. Writing your specification as a table of confirmed line items — instead of a model code plus an assumption — closes that gap, and lets you compare quotations from different suppliers on identical terms.
On villa and resort projects we furnish as a whole package, the swim spa sheet usually travels with the rest of the wet areas: bathroom ceramics, showers and vanities, plus the paving, screening and lighting around the water. Fixing the equipment list early keeps the plant location, power feed and drainage design consistent across the whole zone instead of being reconciled on site.
Start from the shell envelope
The catalog lists WS-130BⅫ at 9950 x 3000 x 1430 mm. Use those three figures as the starting envelope for your site design, then confirm them against the drawing issued with your quotation before you set out any excavation, deck edge or retaining structure.
| Catalog dimension | What it gives you | What it drives on site |
|---|---|---|
| Length 9950 mm | A swim lane with hydrotherapy seating at one end | Deck run, delivery route, offload method, turning space for the transport vehicle |
| Width 3000 mm | Internal water width for stroke work and jet seating | Clearance to boundaries and to access panels at the plant side |
| Depth 1430 mm | Overall shell depth including the base | Above grade, part recessed or fully recessed; excavation volume and retaining design |
Choose the installation method before you ask for a price. A fully recessed unit needs retaining design, drainage on the plant side, ventilation to the cavity and hatches for access. An above-grade unit with steps needs a level reinforced base and a safe approach; steps are listed as an option in the catalog, so state which arrangement you want rather than leaving it implied.
Write the equipment set as quantities
This is where most enquiries fall apart. Specify each item with a quantity and ask the supplier to confirm or correct every row in writing. The catalog figures for WS-130BⅫ are:
| Item | Catalog quantity | What to specify alongside it |
|---|---|---|
| Control system | 1 set | Where the panel sits, and whether it is reachable from the deck or from a separate plant space |
| Swim training system | 1 set | Show it as part of the base unit for this model and have that confirmed on the drawing |
| Water pump | 1 pc | Duty of the swim current, and service access to the pump |
| Filter pump | 1 pc | Filtration arrangement, filter type and clearance needed to remove it |
| Jets (total) | 20 pcs | Jet layout by zone — seating, back, legs. Ask for a jet-position drawing |
| LED lights | 7 | Position of each fitting and whether colour control is required |
| Total power | 10.85 kW | Supply capacity, circuit protection, cable route, and who makes the final connection |
| Water treatment | Ozone shown | Whether UV sterilisation is added, and the maintenance routine expected |
Name the options you want, and those you are excluding
Catalog-listed options across this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so mark each one in your enquiry as "include" or "not required". Two of them influence running cost more than the rest:
- Heat pump. State the water temperature you want and how many months a year the spa is used. A heat pump intended for year-round use is a different design case from a seasonal one, and it changes the electrical arrangement.
- Insulation. Say what is insulated — shell, lid, base — and describe the site's exposure. On an open or cooler site, heat loss through the shell and lid outweighs jet count as an energy variable.
If the plot will not take a 9950 mm straight shell, this range also covers customised shapes — square, round, oval and curved — in the customizable shape outdoor spa line. A custom shell carries its own specification sheet; do not copy the WS-130BⅫ quantities onto it.
Add the site conditions the supplier has to design around
A usable specification also records what happens outside the shell. Put these in the same document:
- Electrical supply. Phases available, capacity at the switchboard, and distance from the board to the spa. Installed power for this configuration is 10.85 kW; have your electrician confirm the feeder and protection on your own board.
- Base and support. Reinforced slab or pedestal support, level tolerance, and the load path once the shell is full of water.
- Drainage. Where displaced and waste water discharges, and whether a drain is needed at the plant side.
- Access for delivery and later service. Width and height from the delivery point to the final position, plus working clearance at every pump and filter.
- Surrounding finishes. Deck material, handrails, screening and lighting that must coordinate with the spa edge and the control panel location.
The checklist to attach to your enquiry
- Model and installation method — above grade, part recessed or fully recessed — with the site drawing attached.
- Shell dimensions confirmed against the quotation drawing, not the catalog page alone.
- Equipment quantities: control system, swim training system, water pump, filter pump, jets by zone, LED positions, treatment method.
- Options in and out: heat pump, insulation, UV sterilisation, sand filtration, steps.
- Total installed power, supply arrangement, and the party responsible for final connection.
- Delivery route, offload method, and maintenance clearance at each item of plant.
- Coordination with adjacent wet-area products, so finishes and control locations line up.
Send that document and you will get a quotation you can hold against the drawing. As part of our turnkey project service, we work from your drawings to confirm each line item, then handle production, freight and site coordination for the swim spa together with the rest of the package.
Send us your swim spa enquiry with that checklist attached. We will confirm every line item against the swimming pool and swim spa range, return a specification drawing for your approval, and quote the exact configuration your project needs.
Contact: PHILLIP | Phone / WhatsApp +86-13928214007 | Email santerson@qq.com | Enquiry page