A swim spa specification sheet is not a procurement record. When a villa, resort or clubhouse project includes an outdoor swim spa, the document that ends up in the purchase order has to answer questions the catalogue never raises: what sits under the shell, how much power arrives at the cabinet, who supplies the heat pump, and what happens when a jet seal needs replacing two years after handover. Below is the documentation set we ask buyers to build around Outdoor Swim Spa WS-S08M, one of the longer configurable models in our swimming pool range.
1. Site dimensions with clearances, not just shell size
The catalogue lists this model as 8020 x 2260 x 1280 mm. That is the unit, not the hole in the ground or the pad it sits on. Procurement files should record:
- The footprint plus working clearance on every side, sized to whatever access the selected configuration needs for pump, filter and control components.
- Total weight when full, confirmed against the shipping and installation documents for the exact build ordered; structural engineers work from that figure, not from a brochure dimension.
- Whether the unit is above ground, partially recessed or fully recessed, and who supplies the sub-base, drainage and any perimeter framing.
- Step arrangement: steps appear in the optional accessories list, so the drawing set must show which option was priced.
Record these as a dimension drawing signed by the buyer's architect. A number copied from a product page is not a construction document, and an 8-metre run will not clear a 7.9-metre service lane twice.
2. Power and electrical scope, stated by party
The captured specification for this model shows a total power figure of 6.95 kW. Treat that as the starting point for an electrical discussion, not its conclusion. The document should state:
- The supply the site will provide: phase, voltage and frequency, written out and matched against the configuration being ordered.
- Cable routing, isolator location, and who supplies and installs them. In most projects this is the local electrical contractor, not the spa supplier.
- Whether a heat pump is included. Heat pumps are on the optional accessories list for this range, so total connected load moves with the selection; a project that adds one later needs the cable and protection sized for it at first fix.
- Control system location and how the end user will operate the unit day to day.
Do not let a single power number in a catalogue carry decisions that belong on an electrical schedule. Confirm the rating for the ordered configuration in writing before any cable is pulled.
3. Water treatment and water management
Ozone is shown as a feature of this model, with UV sterilization and sand filtration listed among the catalog options. Which of those are in the order changes both the capital cost and the running routine, so the file should record:
- The disinfection train actually supplied: ozone generator, optional UV, filter type, and the filter pump count shown in the specification.
- Drain, overflow and make-up water arrangements, including who provides them on site.
- A written maintenance schedule for the agreed treatment set, covering cartridge or media replacement intervals and the consumables the operator buys locally.
For a hotel or resort installation this section belongs in the operations manual handed to the facilities team at handover, not only in the purchase order. It is the document that keeps water quality stable after the project team leaves site.
4. Configuration and options: what is included, priced or excluded
Ambiguity about options causes most swim spa claims. This model's specification records one control system, two water pumps, one filter pump, 58 jets in total, one LED light plus 26 small LED lights, and the features shown as water jets, LED lighting and ozone. The captured specification does not list a swim training system for this model, so if a project requires current-based swimming it must be quoted and documented as an addition rather than assumed.
| Catalogue dimension | 8020 x 2260 x 1280 mm |
| Control system | 1 set |
| Water pump / filter pump | 2 pcs / 1 pc |
| Jets | 58 in total |
| Lighting | 1 LED light; 26 small LED lights |
| Total power (as captured) | 6.95 kW, to be confirmed for the ordered configuration |
| Features shown | Water jets, LED lighting, Ozone |
| Optional accessories listed | Control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation, steps |
| Not listed for this model in the captured specification | Swim training system; quote separately if required |
Attach the signed option list to the purchase order. Where an item is excluded, say so explicitly; "not included" costs nothing to write and saves a variation later.
5. Delivery, access and installation responsibilities
An 8-metre shell arrives on a container or flat-rack and then has to cross the site it will live on. Our logistics service covers sea, air and rail freight forwarding, customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery, so the buyer's file should mirror that split and name what the site team handles:
- Incoterms and the named delivery point: a kerbside drop and a set-down beside the pad are different prices and different risks.
- Crane, forklift or manual carry from the delivery point, access routes, gate widths, and any temporary removal of fencing or glazing.
- Sequence with wet trades, waterproofing and paving, so the unit is set before surrounding finishes close in around it.
- Commissioning: who fills, tests and hands over the unit, and what the buyer signs on completion.
Import terms, duties and transit arrangements are project-specific. We confirm them case by case with each buyer rather than publishing a blanket service level.
6. Warranty, spares and the five-year view
Before the order is placed, ask for and file:
- The warranty terms in writing: what is covered, for how long, on which components, and what voids cover.
- A spares list with part names for jets, pumps, control board, LED fittings, seals and filter media, so the operator can source consumables locally.
- The after-sales route: who to contact, in what language, and how replacement parts are shipped. Our installation and after-sales service covers on-site installation, inspection and snag lists, warranty coverage, spare parts and ongoing maintenance.
- Energy assumptions for the selected configuration, including insulation option and heat pump selection, which drive running cost more than any other two variables.
A procurement team that files these six sections has a defensible record: the specification matches the order, the trades know their scope, and the operator can run the asset without chasing drawings.
Where WS-S08M sits in the range
The swim spa and swimming pool range covers a wide spread of sizes and equipment levels, so it is worth benchmarking before fixing on one model. The catalogue lists the 8-metre variant WS-S08B at 7800 x 2200 x 1500 mm with two control systems, four water pumps, two filter pumps, 98 jets and a total power figure of 14.6 kW, and shows a waterfall among its features. Two units of similar footprint carry very different plant loads and maintenance profiles, which is why the option list matters more than the length.
Where a terrace or atrium cannot take a straight 8-metre shell, our customizable shape outdoor spa is made to order in square, round, oval and curved layouts with an acrylic shell and structural reinforcement, for gardens, terraces and leisure areas. A custom shape changes the documentation set as well: shop drawings and an approved prototype become part of the file.
Checklist to attach to the enquiry
- Signed dimension drawing with clearances, sub-base and drainage scope named.
- Electrical schedule: supply characteristics, cable and isolator responsibility, heat pump decision.
- Water treatment list as ordered, plus the maintenance schedule for it.
- Option list showing included, optional and excluded items, with the swim training system called out if required.
- Delivery terms, site access plan and installation sequence alongside other trades.
- Warranty document, spares list and after-sales contact route on file.
Send that pack with your enquiry and the quotation comes back against a defined scope, which is what keeps a water feature from becoming a variation order.
SANTERSON has been manufacturing furniture and building materials in China since 2008 and supplies villa, hospitality and office projects worldwide, with custom/OEM production, door-to-door logistics, installation and after-sales support. For a swim spa specification review or a quotation on Outdoor Swim Spa WS-S08M, contact us and our project team will confirm the configuration, electrical requirements and delivery scope for your site.