A design brief describes the room. It rarely says enough for a manufacturer to price an outdoor cabinet package accurately, and that gap between drawing and quotation is where projects lose time — particularly when the item sits outside the main kitchen: on a terrace, by the pool, or in a covered courtyard where weather enters the specification. This guide sets out what we need from you to turn a brief into a workable proposal for Santerson Outdoor Ready PVC Cabinets, and what you should expect back.
Start With Where the Cabinet Will Actually Stand
The single most useful thing a brief can state is the exposure of the location. An alcove under a solid roofline behaves differently from a balcony with an open side, which differs again from a pool deck where splashing and cleaning chemicals are routine. PVC cabinet fronts are commonly chosen for these situations because they do not absorb water the way a raw board edge can, and they stay dimensionally steady through humid conditions.
Tell us whether the run is covered or exposed, how close it sits to a pool or the sea front, and whether the space is used for food preparation or mainly for storage. Those three answers steer the finish selection and the internal fit-out far more reliably than a style word such as "modern" or "coastal".
What to Send Before We Can Quote
You do not need finished construction drawings. A rough plan with dimensions is enough to start. In practice, an enquiry moves fastest when it carries the following:
- A floor plan or elevation of the area, even a hand sketch with measurements on it.
- Ceiling height and any obstruction — beams, downpipes, external taps, air-conditioning lines.
- Appliances or fixtures to be built in: sink, mini fridge, ice maker, grill drawer, wine storage.
- The finishes already fixed nearby — flooring, cladding, louvres, outdoor joinery — so the fronts can be matched.
- A target completion month for the project rather than just a preferred delivery date.
- Quantity of identical runs if the same detail repeats across villas or guest suites.
If you are working on several units at once, say so early. Repeat runs change how we sequence production and pack the shipment, and it is far cheaper to plan that at quotation stage than to re-cut panels later.
How We Read Your Brief
Once the information arrives, our team works through it in a fixed order. First the layout: circulation, door swings, and whether appliances need ventilation clearance. Second the material set — cabinet box, fronts, worktop, hardware — matched against the exposure you described. Third the internal configuration, which is where most client regret lives afterwards, so we question it rather than accept it silently.
Our Interior Design Services cover space layout planning, concept design and mood boards, furniture layouts with 3D visual renderings, and whole-space indoor and outdoor furnishing schemes. That means a brief that stops at "outdoor kitchen against the west wall" can come back as a coordinated proposal rather than a bare price list.
Our cooperation steps
Project brief and design proposal, then quotation with detail confirmation, then production, shipment and follow-up. Nothing goes into manufacturing until the drawings and specification are signed back by you.
Finishes, Sizing and Tolerances
Every unit is made to measure. There is no standard width we push clients toward, because an outdoor run almost never fits a catalogue module cleanly — tile thickness, waterproofing build-up and render all eat into the drawing.
The PVC Kitchen Cabinet collection covers several front treatments, and they can be specified per project rather than locked to one look across the whole site:
- High Gloss PVC Cabinets for a reflective, clean front that reads well against stone and glass.
- matte pvc cabinets where glare from water and light is a problem.
- wood grain pvc cabinet fronts when the scheme already carries timber louvres or a teak-look deck.
- Santerson Shaker Style PVC Cabinets for transitional and coastal schemes.
On tolerances, we ask for site-verified dimensions after the wet trades have finished, not from the architectural drawing alone. If tiling has not yet started, we will produce the unit to drawing with a stated adjustment allowance and confirm the gap detail with your site team before crating.
When PVC Belongs in a Wider Package
An outdoor cabinet run rarely stays alone. Bar fronts, poolside storage, guest-suite kitchens and the indoor kitchen usually need to match, and splitting those across suppliers is where colour and handle details drift apart. Our One-stop Solution covers design consultation and space planning, material selection and product specification, manufacturing with quality control, project management and site coordination, then final installation and handover.
Where a project needs something the catalogue does not carry, our Custom & OEM Service handles bespoke material finishes and textures, prototyping, flexible minimum order quantities and brand customisation. For villa and hospitality schemes handled as a whole, Turnkey Solutions keeps cabinetry together with the flooring, wall finishes, lighting, outdoor furniture and bathroom fixtures around it.
Getting Freight and Site Access Right
Cabinets arrive flat-packed or partly assembled depending on how the site can receive them. A ground-floor terrace with a wide gate is one situation; a penthouse reached by a small service lift is another, and that constraint belongs in the enquiry rather than being discovered on delivery day. Our logistics covers freight forwarding by sea, air and rail, customs paperwork including commercial invoices, packing lists and certificates of origin, packaging and container loading, shipment tracking and door-to-door delivery.
Tell us the delivery address, the receiving hours your site allows, lift or stair dimensions, and who signs for the goods. Those details decide panel lengths and crate sizes.
Installation and What Happens After
Our installation and after-sales service covers on-site installation, inspection and snag lists, warranty coverage, spare parts and replacement, and ongoing maintenance. For outdoor joinery we recommend the site be level and drained before fixing — water pooling under a plinth causes more callouts than the cabinet itself.
Confirm the warranty terms that apply to your specific project at contract stage; they vary with the material set chosen and the exposure of the installation.
How Early to Send the Brief
Enquiries that arrive while the wet trades are still running produce better drawings than enquiries that arrive when the tiler is waiting. The reason is simple: we can set out on site, or agree an adjustment allowance with your team, before panel sizes are frozen.
We do not publish a fixed lead time, because production and freight both depend on the material set, the quantity of repeat runs and the destination. Ask us for the current figure against your specific package and we will confirm it in writing with the quotation.
If your drawings are incomplete, send them anyway. A partial brief with honest gaps produces a useful first response; no brief produces nothing.
Send your enquiry
Contact PHILLIP by phone or WhatsApp on +86-13928214007, or email santerson@qq.com. Attach your plan, a photograph of the location and the exposure details described above, and you will receive a specification proposal rather than a single number.
All dimensions, finish availability and service terms are confirmed project by project against current specifications. Enquiries reach us through the Interior Design Services team during business hours, Monday to Saturday, 8:00 AM to 6:00 PM (GMT+8).