A backlit feature wall looks simple on a mood board and complicated on site. The glow, the panel joints, the transformer hiding behind an access hatch and the cable route to the switch all have to agree before fabrication starts. That is exactly why our quotations for Santerson Backlit Feature Walls come back clearer, faster and closer to a final price when the request for quote carries the right information. The list below is what our project team uses internally; send it with your enquiry and you will spend far less time on revisions.

Start with the wall, not the product

Backlit walls in this range are made to project-specific dimensions rather than ordered from a size chart, so the drawing matters more than the model name. Give us:

  • A dimensioned elevation of the wall: overall width and height, plus ceiling line, skirting, door and window openings.
  • The construction behind the wall — masonry, stud partition, existing plasterboard or a new framed substrate — and whether it needs to carry the full assembly or only part of it.
  • Clear floor-to-ceiling height where the design runs to the ceiling, and any obstruction depth you already know about, such as a beam, pipework or a duct.
  • The room and its use: living room, media room, lobby, showroom or guest suite. The same panel detail is specified differently for a family room and a public area.

A sketch with measurements is enough to price the joinery. What slows everything down is a bare "6 m wall" with no section information, because we then have to guess how the light returns and where the driver sits.

Specify what the light has to do

Backlighting is a lighting design decision dressed as an interior finish, so describe the effect you want rather than assuming one standard fitting will cover it. Helpful details include:

  • Whether the light sits behind translucent panels, washes down a textured surface or rims the edges of the wall.
  • Colour temperature and, if you need it, dimming or tuning — and who controls it: a wall switch, the room's existing lighting system or a scene controller.
  • The location and rating of the power feed, plus where an access panel is acceptable for maintenance. A driver buried behind a sealed panel becomes a site problem later.
  • Local electrical requirements for the destination country, including voltage and any certification your consultant or contractor requires. We confirm these with you project by project instead of assuming your market's rules.

If you are already specifying Santerson Integrated Cabinet Lighting elsewhere in the same build, send both schedules together. Matching drivers, colour temperature and control logic across rooms is far easier before production than after.

Fix the finish and the neighbouring elements

Finish selection drives price more than most buyers expect, so state it plainly: veneer, lacquer, laminate, stone or marble look, metal trim, glass. Tell us the sheen and whether samples need to travel for approval before you commit. Then show what touches the wall:

  • Flooring type and threshold detail at the base of the wall.
  • Adjacent ceiling system and cornice or shadow-gap expectation.
  • Any fireplace, TV, soundbar, speaker or artwork that must sit inside the composition.

Where the backlit wall is one element in a larger joinery package, send the whole elevation. Panels, storage and openings are easier to balance as one drawing, and it usually reduces the number of separate cut-outs we have to engineer.

Decide how much storage and equipment the wall carries

A backlit surface often hides working parts behind it. Note down what has to live in the wall: a television and its bracket, set-top boxes, a console, cables, or cupboards for games and linens. If you are weighing that against a closed storage composition, compare our Santerson Full Height Media Walls alongside the backlit option in the same enquiry and we will price both configurations on the same basis.

Also state the equipment you already own. A TV's size, weight and VESA pattern determine the backing structure and ventilation, and those details change the panel build.

Set the commercial terms you actually need

The rest of the request is straightforward but changes the number on the quotation:

  • Quantity — how many walls, and whether several rooms repeat the same detail.
  • Destination city and port, plus who handles import clearance. As a one-stop furniture and building materials supplier we arrange freight and door-to-door delivery, but we still need your destination to quote it correctly.
  • Your programme: on-site target date, and whether the wall is one of several trades in a sequence.
  • Installation responsibility — our team on site, your contractor following our drawings, or delivery only.
  • Whether the backlit wall is part of a wider package with cabinetry, wardrobes, doors or flooring. Bundled packages are usually easier to coordinate and cheaper to ship.

RFQ checklist — send these with your enquiry

  • Dimensioned elevation and section of the wall, in mm
  • Substrate and structural notes, plus known obstructions
  • Lighting intent: effect, colour temperature, dimming, control, driver access
  • Local voltage and any certification your consultant requires
  • Finish selection and sample requirements
  • Equipment list with sizes, weights and mounting pattern
  • Storage layout behind and beside the panels
  • Quantity, destination port, target on-site date, installation party
  • Contact name, phone or WhatsApp, and email for drawings
If you can only send one thingWhy it matters most
Dimensioned elevationSets panel sizes, joints and whether the design is buildable at all.
Lighting intent and controlDetermines driver location, ventilation, access hatches and cable routes.
Finish and substrate notesDrives material cost and how the assembly fixes to your wall.
Destination and programmeChanges packaging, freight option and production scheduling.

A practical note on samples: colour and grain read differently once light passes through or across a panel. Where the finish is decisive, ask for a sample before you sign off, and confirm dimensions, materials, hardware and electrical options against the production drawings rather than the catalogue page.

Send us your drawings. Email santerson@qq.com or reach us on WhatsApp at +86-13928214007 (attention: PHILLIP) with the elevation, your lighting intent and destination city. We will come back with a specification, a quotation and a production drawing for review before anything is cut.