A swim spa on a hotel, resort or residential tower site is not something you can judge from a brochure render. The proposal that arrives in your inbox usually carries a model number, a set of dimensions and a list of features, and little else. Below is the working checklist we use when a buyer sends us a quotation for the Outdoor Swim Spa WS-S06C from any supplier and asks what to look at before signing.
What the catalogue sheet actually says about WS-S06C
The published specification for this model is a reasonable starting point, so read it as a baseline and then test how far your own quotation departs from it. The listed shell measures 5880 x 2380 x 1400 mm, which puts the unit in the long-box class rather than the compact spa class - close to six metres of length with a depth of just under one and a half metres. That footprint matters more than the marketing copy, because it drives the slab, the plant space, the access route and whether the unit can be lifted into position at all.
The rest of the published list reads as follows:
| Item | Value listed in the catalogue | What to confirm on your own quotation |
|---|---|---|
| Overall dimensions | 5880 x 2380 x 1400 mm | Whether the figure is the shell, the cabinet face or the finished external envelope including steps and coping |
| Water pumps | 3 pcs | Which pump serves the jets, which serves circulation, and whether any is dedicated to a water feature |
| Filter pump | 1 pc | Filtration turnover rate per day, not just pump count |
| Jet total | 33 pcs | Jet layout drawing, and whether jet positions suit your assumed user profile |
| LED lights | 2 | Fixture rating, colour control and spare-part availability |
| Total power | 9.95 kW | Whether the figure includes a heat pump, and what supply it assumes |
| Control system | 1 set | Controller model, remote access and replacement terms |
| Features shown | Water jets, temperature setting, LED lighting, ozone | Whether ozone is standard or an add-on, and what water care it replaces |
Two entries in that table deserve particular attention on a commercial job. The first is total power: 9.95 kW is the figure printed for the configuration shown on the product page, and heat pumps appear as an option across this range. A quotation that quotes one power figure and then adds a heater as a variation has changed the electrical scope, and with it the distribution board, the cable run and the electrician's tender. The second is the swim training system, which is not listed in the captured specification for WS-S06C. If your brief assumes lap swimming against a current, that assumption needs to be written into the order or the model selection needs to change - comparable units in the same family do carry one, and the difference is visible on the sheet.
Read the specification as a configuration, not a fixed product
The Swimming Pools and Swim Spas range is configurable. Alongside the base unit, the catalogue lists control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps as options. That flexibility is useful for a project team, but it also means two quotations carrying the same model code can describe genuinely different machines at genuinely different prices.
Before you compare prices, build a one-page configuration sheet for each bid and fill in the same rows for every supplier:
- Filtration route. Cartridge, sand filtration or both. Sand filtration changes the plant space required and adds a backwash drainage requirement.
- Water care. Ozone is shown as a feature on this model; UV sterilisation appears as an option across the range. What matters commercially is the consumable schedule and who supplies it.
- Heating and insulation. Heat pump and insulation are optional items. For a spa running year-round in a guest-facing facility they belong in the base comparison, not in a variation.
- Access and steps. Steps are listed as an option and change the external footprint you reserve on plan.
- Control and interface. Confirm the controller set is included, and ask what happens when a control board fails three years into operation.
Ask every supplier to price the same configuration. Comparing a base quotation against a fully optioned one is the most common way a project appears to save money at tender and loses it at variation.
The site conditions that decide whether the model works
Model selection fails on site far more often than it fails on paper. Three questions settle most of it.
Electrical supply
The catalogue carries a total power figure for the configuration shown, and the product record closes with an instruction to confirm included equipment and electrical requirements for the selected configuration. Treat that as a live requirement. Your electrical consultant should receive the final pump schedule, heater selection and control specification before any board is sized, and the quotation should state plainly what supply the unit expects.
Structure, drainage and access
A shell of roughly 5.9 m by 2.4 m standing 1.4 m deep needs a slab designed for a full water load, a drainage route for drain-down and maintenance, and a delivery path that matches the physical unit rather than the photograph. Ask the supplier for the shipping breakdown: how the unit arrives, whether it travels as one piece or in sections, and what lifting or access provision the delivery assumes.
Usage assumptions
Jet count, pump count and filtration turnover all follow from how the spa will actually be used. A wellness suite running scheduled sessions has a different duty cycle from a clubhouse or villa spa used occasionally. State your usage pattern in the enquiry and ask the supplier to justify the pump and filtration selection against it, rather than accepting whatever the standard build happens to carry.
How the supply route changes the risk profile
A swim spa rarely arrives alone on a fit-out. It sits inside a package that also includes poolside furniture, outdoor lounge settings, wall and floor finishes, lighting and sometimes bathroom fixtures for the adjacent changing rooms. Coordinating those items with one supplier is materially easier than holding five separate contracts, which is why buyers working through a one-stop project furnishing route usually place the wet-side items together with the surrounding furniture and finishes.
When you evaluate a proposal, check which of these the supplier has committed to in writing:
- Design consultation and space planning before production starts, so the spa envelope is resolved against your drawings rather than after them
- A named production and quality-control stage, with documented sign-off before shipment
- Freight arrangements, packaging and container loading, and who handles customs paperwork
- Delivery to site, not merely delivery to port
- Commissioning support, snag inspection, and a defined warranty scope with spare parts named
These are the stages SANTERSON lists as part of its installation and after-sales support, alongside door-to-door logistics. Any supplier you shortlist should be able to answer each line with a document rather than an assurance.
A comparison that exposes the real differences
Once configuration is fixed, compare like with like across the family. The published sheets for adjacent models make the trade-offs visible:
| Model | Catalogue dimensions | Jets | Total power | Notable listed features |
|---|---|---|---|---|
| WS-S06C | 5880 x 2380 x 1400 mm | 33 pcs | 9.95 kW | Water jets, temperature setting, LED lighting (2), ozone; 3 water pumps |
| WS-S06B | 5800 x 2200 x 1250 mm | 48 pcs | 13.35 kW | Water jets, LED lighting (3 plus 26 small), ozone, waterfall; 3 water pumps |
| WS-S06CT | 5880 x 2380 x 1400 mm | 31 pcs | 8.35 kW | Swim training system, water jets, LED lighting (4), ozone; 1 water pump |
| WS-S08CT | 8000 x 2400 x 1420 mm | 35 pcs | 8.35 kW | Swim training system, temperature setting, LED lighting (6), ozone; 1 water pump |
The pattern is instructive. WS-S06C and WS-S06CT share the same listed envelope but differ sharply in pumps, jets and power - one built around jet volume, the other around a swim current. WS-S06B carries more jets and a materially higher power figure inside a slightly smaller shell. If your programme calls for lap swimming against a current, the S06C sheet does not carry that item and you should be looking at the CT variants; if it calls for hydrotherapy seating, the pump and jet arrangement on the C is the point of the design.
Questions to send back to the supplier
A short, specific enquiry list does more work than a long one. Send these and read the answers carefully:
- Please confirm the finished external envelope including steps, and provide a lifting and delivery plan for a site at this address.
- Please state the electrical supply assumed for the quoted configuration, separately from any heat pump option.
- Please confirm whether ozone is included as standard on WS-S06C, and list the consumables with their replacement intervals.
- Please provide the filtration turnover rate for the quoted filter pump at the stated water volume.
- Please identify which components are covered under warranty, for how long, and how a failed part is replaced on site.
- Please confirm what is excluded from delivery and commissioning at this destination.
A supplier who answers all six with documentation is running a project process. A supplier who answers with assurances has told you what the next twelve months will look like.
Frequently asked questions
Before you sign
A proposal is worth only as much as the specification behind it. Take the catalogue figures for WS-S06C, hold them against your own configuration sheet, verify the electrical and structural assumptions with your consultants, and make the supplier commit in writing to what is included, what is optional and what happens when a component fails. Do that and the model number stops being a claim and starts being an agreement.
To discuss a swim spa package for a hotel, resort or residential project, contact SANTERSON - PHILLIP, +86-13928214007, santerson@qq.com.