A swim spa is one of the few site elements that pulls structural, electrical, waterproofing and finishing trades into the same decision. Written specifications protect the buyer when the schedule moves. The model Outdoor Swim Spa WS-PC02 is a useful example, because its catalogue entry shows where confirmation is still needed before an order is placed.

Why documentation matters more than the model number

In a villa or resort package, the swim spa rarely sits alone. It shares a deck with sun loungers, an outdoor bar and often a pergola or shade structure, and it connects to the same exterior finishes as the rest of the landscape. Procurement teams who record only "one spa, model WS-PC02" carry that ambiguity into the quotation stage and then into site works.

A usable specification pack answers four questions in writing: what is being bought, what is included in the delivered unit, what the site must provide to receive it, and who signs off on the configuration before production starts. Everything below maps onto those four questions.

Record the catalogue figures as published, then flag what needs confirming

The published entry for WS-PC02 lists a square footprint and a shallow seating depth alongside an equipment set. Transcribe these values exactly as they appear on the product page, and mark each one as either confirmed or pending.

Item shown in the catalogueCatalogue valueWhat procurement should record
ModelWS-PC02Exact model code on the purchase order, not a series name
Catalogue dimensions3000 × 3000 × 1050 mmFootprint and depth for deck setting, access route and structural opening
Control system1 setWhich controller is supplied, and whether it matches the local supply
Water pump2 pcsPump model and quantity included in this configuration
Filter pump1 pcFiltration duty and maintenance access
Jet total60 pcsJet layout and seat positions the jets are aimed at
LED lights1 pcFitting quantity and control method
Total power7.35 kWConnected load for the electrical design and protection device
Features shownWater jets, LED lighting, OzoneWhether ozone is standard or optional in the quoted configuration
Swim training systemNot listedState explicitly that no swim-current unit is assumed

The catalogue entry itself instructs buyers to confirm included equipment and electrical requirements for the selected configuration. That line is the heart of the paperwork: a specification that copies the table but skips the confirmation leaves the same gap open.

Catalogue figures describe the published model. Options, local supply conditions and site interfaces change what actually ships, so each figure needs a written confirmation against the specific order before production is released.

Specify the options that are not part of the base entry

The range lists optional accessories around the core unit: control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so a buyer comparing two configurations cannot assume an option fitted on one model is offered on another.

For each option, record three things in the specification sheet:

  • Whether the item is included, optional or unavailable for this model — and the supplier's written answer, dated.
  • The performance driver behind the choice. A heat pump changes running load and therefore the electrical design; insulation changes how the unit behaves in a cold-climate villa; sand filtration changes the plant room space needed for backwashing.
  • The access consequence. Steps change entry height and handrail details, and filtration equipment needs service clearance that a finished deck can easily block.

If the project has not yet decided between a hydrotherapy-focused spa and a longer swim-and-relaxation layout, compare configurations rather than guessing. The catalogue also carries WS-PC01 in the same family, which shows how jet count and total power shift between models of different footprint — a useful cross-check when a client asks for "the smaller one".

Document the site interfaces before ordering

Structure and setting

Record the delivered footprint and depth against the finished deck level, the load path beneath the filled shell, drainage around the plinth, and the access route from the delivery vehicle to the final position. A 3000 × 3000 mm plan on a drawing is not the same as a crane or gate clearance check.

Electrical

A published total power figure of 7.35 kW is a connected load, not an installation instruction. Procurement should obtain from the supplier the supply voltage and phase, circuit protection expectation, cable entry location and control wiring arrangement, then have the local electrical designer confirm them against local requirements. Do not let an assumed breaker size travel into the drawings.

Water, drainage and maintenance

Note fill and top-up points, drain location, water treatment duty (ozone, UV or both in this configuration), filter access, and the spare-parts position for pumps, jets and controls. These details decide whether the asset is easy to run ten years later.

Tie the spa to the rest of the outdoor package

Swim spas are usually bought inside a wider outdoor scope, and finishes should be decided together. Deck boards, wall cladding and shading need to match the same palette as the spa cabinet. Where the same project also covers motorized louvered pergolas, cabana daybeds and outdoor dining sets, one coordinated specification avoids three separate suppliers choosing three different shades of the same grey.

As a one-stop furniture and building materials supplier, SANTERSON produces and coordinates this wider outdoor scope alongside interior fixtures, so the spa can be specified in the same drawing package as the pergola, loungers and adjacent finishes rather than treated as an imported afterthought.

Fix the approval trail for custom and OEM work

Where a project changes cabinet finish, jet arrangement or branding, the Custom & OEM Service covers bespoke finishes and manufacturing. The document set should then include the approved sample or prototype reference, the material and finish code, the confirmed option list, and a named approver on both sides with a date. That trail is what prevents a "we thought it was included" argument at handover.

Logistics and installation records that belong in the file

Logistics and door-to-door delivery covers freight, packaging and container loading, customs documentation and tracking. For a swim spa, add to the file: the crate or container dimensions and weight for the site lift plan, the named Incoterms for the shipment, the receiving contact at site, and the inspection window on arrival so damage is recorded while the carrier is still accountable.

Then close the loop with the installation and after-sales record: commissioning sign-off, snag list, warranty terms as written for this order, spare-parts contact, and the maintenance items handed to the building operator. A handover pack without these is not a handover.

A practical checklist for the WS-PC02 file

  • Exact model code and published catalogue dimensions, with deck setting drawing attached.
  • Confirmed option list: control system, sterilization, heat pump, filtration, insulation, steps — each marked included or excluded in writing.
  • Electrical data sheet: voltage, phase, connected load, protection, cable entry, control wiring.
  • Jet layout drawing with seat positions, and a clear statement on whether a swim-current system is supplied.
  • Site interface notes: structural support, drainage, access route, plant clearance for service.
  • Finish and material codes where the project deviates from the standard catalogue product.
  • Delivery terms, crate dimensions, receiving contact, arrival inspection record.
  • Commissioning sign-off, snag list, warranty wording and spare-parts details.

Send your configuration questions with the drawings

Share the deck layout, target option list and local supply details for your project, and the team can confirm what WS-PC02 would ship as on that specific order — including how it coordinates with the pergola, loungers and finishes around it. Contact details are on the contact page.