A curio cabinet is one of the smallest items in a villa or apartment fit-out and one of the easiest to get wrong once it crosses an ocean. The Santerson Curio Cabinets collection is made to measure: each unit is built around the opening you give us, with your choice of material, finish and internal layout. That flexibility is exactly why the delivery plan matters more than the item value. A cabinet that arrives two weeks late, or in a crate your site team cannot lift into position, can stall handover for a whole room.
The sequence below is how we handle project orders of display cabinetry from purchase order to handover, and what we need from your side at each stage so nothing waits.
Before Production: Lock the Specification You Will Ship Against
Freight problems rarely start at the port. They start in the drawing review, when a dimension is assumed rather than measured. For made-to-measure display cabinets, the specification you approve is also the specification your import documents will describe, so treat it as a single document that serves both purposes.
Confirm these items in writing before we open production:
- Final opening dimensions and the finished floor and wall levels they relate to, including skirting, plaster build-up and any recess the cabinet must sit inside.
- Access route from the building entrance to the room: lift car size, stair width, door clearances and turning spaces. A full-height vitrine that passes a front door but not a lift is a delivery failure, not a production one.
- Fixing method and substrate. Wall-mounted display cabinets need to know what they are fixing into; solid wall, stud partition and masonry each call for different brackets and blocking.
- Glass type, shelf loading and door hardware, so the packing design can support the actual weight of a loaded cabinet rather than an empty one.
- Whether integrated lighting is required. If it is, we confirm the electrical specification and the destination voltage with your electrician before the carcass is built.
Choose the Freight Mode Against Site Programme, Not Price
Our furniture logistics and door-to-door delivery service covers freight forwarding by sea, air and rail, with customs paperwork handled from our side. For a project order of curio cabinets, the choice between them usually comes down to three questions.
| If your situation is | What we normally recommend |
|---|---|
| A single villa or apartment order, several cabinets, handover not urgent | Grouped sea shipment with the rest of the joinery package. One consignment means one set of documents and one delivery window on site. |
| A sample cabinet or a mock-up room that must be signed off before the rest is released | Air freight for the sample only, then sea for production. Seeing the finish and the lighting in place avoids rework across the whole order. |
| A replacement unit after site damage, or a late variation | Air or express for the single unit, so the room can be handed over rather than left open. |
For glass-fronted pieces, we also advise against splitting cabinets of the same specification across two different sailings. Batches produced and packed together match on site; batches separated by weeks can show small differences in stain tone or hardware lot that are visible when units stand side by side.
Packing Design for Glass and Veneer
Display cabinets carry two materials that do not travel well: glass and a decorative surface finish. Our packing and container loading planning for these orders follows a fixed logic, agreed with you before the crates are built.
- Carcass and glazed components ship separately where the design allows it, so an impact in transit damages one element instead of the whole unit.
- Glazing is crated upright, on edge, with corner protection and cushioning rated to the panel size. Laying glass flat in a shared container is not accepted for these items.
- Veneered and lacquered panels are separated where they touch, so transit vibration does not mark a polished face.
- Crates are marked with the room or unit reference from the approved drawings, not just the SKU. On a multi-unit residential project that marking is what tells the site team which cabinet belongs to which apartment.
- The packing list states crate count, gross and net weight, and dimensions per crate, so your side can check lift capacity before the truck arrives.
Documents We Prepare, and What Your Side Confirms
We prepare the shipping documentation set for the order: commercial invoice, packing list, certificate of origin and the paperwork needed for import clearance. Where a project calls for it, we also arrange cargo insurance and assign a logistics coordinator who tracks the shipment and reports to your project contact.
What we need from you is short but not optional:
- The delivery address and Incoterms agreed in the contract, so the quotation and the invoice describe the same obligation.
- Confirmation of who clears customs at destination and which permits or declarations apply to timber-based products in that market. Import rules for wood and composite panels differ by country, and your clearing agent is the authority on them.
- Duties and taxes arrangement, so a shipment is not held at the port while payment responsibility is decided.
- A named site contact with authority to accept or reject the delivery.
Arrival: Inspection, Installation and Handover
Delivery to the door is not completion. Our installation and after-sales support covers on-site installation, inspection with a snag list, spare parts and ongoing maintenance.
For display cabinets we ask for the same three checks at every arrival:
- Count against the packing list before crates leave the truck. Crate-level acceptance is far easier to claim for than unit-level damage discovered after unpacking.
- Photograph any crate that arrives damaged, in the position it arrived. Photos of the crate, its markings and the seal are what support a cargo insurance claim.
- Install against the approved drawing revision. Lighting wiring, door swing direction and fixing positions were fixed at production; installing to an older drawing is where cabinets end up reworked on site.
If a unit needs replacement after transit damage or a site error, we manufacture and ship the individual piece rather than asking you to accept a mismatched substitute. To keep that option useful, we suggest you retain the approved drawing revision and finish code for each cabinet type in your project file.
Ordering Display Cabinetry Inside a Larger Fit-Out
Curio cabinets are seldom ordered alone. On villa and apartment projects they usually sit within a wider joinery package, alongside custom kitchen cabinets for residential and hotel projects, wardrobes, media walls and open shelving. Ordering them as one consignment with that package has practical benefits: a single production window, one set of finish samples approved across all timber items, and one delivery sequence on site.
If you are specifying several cabinet types for the same project, we produce the carcass, glass and lighting specification for each as separate line items on one packing list. That keeps the shipment simple while letting your team track each unit individually through to handover.
Send us your cabinet schedule
Share the room drawings, opening dimensions and destination port for your project order. We will return a production and freight plan with packing details and crate weights, so you can check site access before anything is built.