A sideboard looks simple on a drawing. It is a low cabinet against a wall, and most people assume the size can be decided late in the job. In practice it is one of the pieces where measurement errors show up fastest: doors that foul a radiator, a run that blocks a doorway, drawers that cannot clear a floor-to-ceiling skirting, or a stone top that arrives without a planned socket behind it. Because classic sideboards are made to measure, with material, finish and layout chosen per project, the quality of your enquiry decides how quickly you get a workable quotation. This guide sets out the measurements and the project information that let a factory produce a piece that fits on site the first time.
Why a made-to-measure sideboard needs more input than an off-the-shelf one
Stock furniture comes with fixed dimensions, and you adapt the room around it. A project-specified piece does the opposite: the cabinet is drawn to the wall it will stand against. That means every constraint in that wall has to reach the factory before cutting starts. It also means the same elevation can produce very different prices depending on the carcass depth, the door construction and how much of the run is open display rather than closed storage.
For residential living projects we work from a room elevation plus a short written brief. Nothing exotic is required — but a photograph and a tape measure are worth more than an adjective such as "about two metres".
The measurements that actually matter
Send the following for each wall, taken in millimetres. Where a wall is not straight or not square, say so rather than averaging the numbers.
| Measurement | What to record | Why it matters |
|---|---|---|
| Overall length of the run | Wall length from each end condition: internal corner, door reveal, window return or an adjoining cabinet | Sets the module split and whether the piece must scribe into an uneven wall |
| Height to the soffit or shelf above | Floor finish level to ceiling, beam underside or the base of anything overhead | Decides a standalone unit or a taller built-in, and how the top is finished |
| Clearance for doors and openings | Swing arc of the room door, plus any adjacent hinged or sliding door | Prevents the new cabinet fouling an existing opening when someone walks past |
| Obstacles on the wall face | Sockets, switches, radiator protrusion, thermostat, skirting depth and height | Carcass back panels and plinths need cut-outs or a scribed profile |
| Floor type and level difference | Tile, engineered timber or carpet; any slope or step along the run | Determines plinth height, levelling method and whether doors are trimmed |
| Depth available at the doorway route | Narrowest point of the delivery path: stairwell turn, lift, corridor, front door | A one-piece carcass that will not travel has to be built in sections instead |
Working depths and heights to plan around
Rather than quoting a single number, think in terms of what the piece has to do. A sideboard used for tableware and linen usually works at a carcass depth that comfortably clears plates and stacked glasses; go shallower and you lose usable depth behind the doors, go deeper and the top becomes an awkward reach across. Where the client wants a stone counter on top for a coffee machine or a serving arrangement, the top thickness and any upstand have to be added to the carcass height before the worktop template is taken.
Internal layout follows from the same logic. Drawers near the top of the unit are convenient for cutlery and small items but waste vertical space; deep bottom drawers suit linen and bottles stored on their side; open shelving in the middle makes display pieces accessible but shows clutter. Tell us what is being stored, not just how many shelves you imagine.
Project inputs beyond the tape measure
Dimensions fix the fit. The following fixes the look, the price and the delivery route.
- Room and usage. Dining room, hallway, living room or a combined kitchen-dining space. A hallway piece takes more impact than a formal dining room; a piece beside a kitchen island sees daily serving use.
- Style reference. Panelled fronts, mouldings and proportions sit naturally in the classic language of this collection. Share drawings, mood boards or photographs of what you are matching, and name the joinery or cabinetry already in the property so the new piece can be detailed to match.
- Material and finish. Substrate, paint colour or lacquer sheen, veneer species if a wood grain is specified, and the ironmongery style. Where a colour has to match an existing element, give the make and reference rather than a description.
- Storage programme. Item by item: glassware, bottles standing or lying, linen, serving trays, tableware, art objects. This drives drawer count, shelf spacing and whether shelving needs to carry weight.
- Services. Any integrated lighting in niches, socket positions for a wine fridge or coffee machine, and cable routes. These must be shown on the drawing before production, not resolved on site.
- Existing finishes nearby. Floor, wall panelling, architrave profile and skirting height, so the plinth and scribing are detailed to disappear.
How the same brief changes with the type of piece
The Dining Cabinets & Sideboards range covers several configurations, and the information needed shifts slightly between them. A buffet cabinet is usually a freestanding run with a working top, so the worktop material, edge profile and the appliances or equipment sitting on it belong in the enquiry. A wall-mounted sideboard removes the floor problem but adds a wall one: you need to tell us the wall construction, where the studs or solid backing are, and the finished floor level beneath it, because the fixing detail and the visible shadow gap depend on that. For projects where the piece has to read as part of the architecture — full-height ends, integrated niche lighting, display shelving running into a wider joinery package — we coordinate it with the rest of the built-in furniture rather than quoting it in isolation.
That coordination is where an integrated supplier saves time on site. A villa fit-out typically needs cabinetry, wall panelling, doors and interior fixtures resolved against the same set of levels and the same material palette. When those come from one production schedule, tolerances are reconciled once instead of argued about twice.
A short checklist before you send an enquiry
- Dimensioned elevation of the wall, in millimetres, with both end conditions noted
- Floor finish level and ceiling or soffit height above the run
- Positions of sockets, switches, radiators and skirting depth
- Door swing arcs and the narrowest point on the delivery route to the room
- Written storage programme: what goes inside, drawer by drawer
- Material and finish choices, with colour or veneer references where a match is required
- Any integrated lighting, appliances or worktop with edge detail
- Project location, delivery address and the intended installation window
If you have drawings, send them even when they are incomplete. A sketch with two dimensions is enough for us to come back with the specific questions still outstanding, which is usually faster than trying to guess a full specification from a photograph.
What happens after the enquiry
For custom and OEM work we start from your brief and drawings, confirm the material and layout choices, then produce detailed shop drawings for sign-off before production. Once the specification is approved, the piece enters manufacturing with quality checks at each stage, followed by packing and door-to-door delivery to the project address. Installation support and after-sales service are part of the same scope, so the party who built the cabinet is accountable for it on site.
For a whole-house or hospitality project, this piece rarely travels alone. Working from one supplier across furniture and building materials keeps the finish references, levels and delivery schedule in a single programme, which is the main reason villa and hotel clients group their cabinetry, panelling and interior fixtures together.
Frequently asked questions
Can you match an existing paint colour or wood veneer?
Yes, where you give us the make and reference for a paint, or a physical sample or exact species and cut for a veneer. Matching from a photograph alone is not reliable, so we confirm the finish before production rather than promising a close approximation.
What if my walls are not straight?
Common in both new builds and renovations. Tell us at the enquiry stage; we detail a scribed filler or an adjusted end module so the front line stays true, instead of leaving the fitter to pack it out on site.
Do you deliver internationally?
Yes. Freight is arranged by sea, air or rail with customs documentation and door-to-door delivery to the project address. Give us the delivery city and building access details early, since they affect both packing and whether the carcass has to be sectioned.
Can the sideboard be designed as part of a larger joinery package?
Yes. Where the piece sits within wider built-in furniture — media walls, pantry runs, panelling and doors — we detail it against the same levels and material palette so the whole elevation reads as one design.
Send your dimensions, drawings and storage brief to SANTERSON, and we will return a specification with the outstanding questions flagged rather than a quotation built on assumptions.